2425.0 RFP for CM Services for Research Building 2
2425.0 RFP for CM Services for Research Building 2
The University of Kentucky desires the services of an experienced and highly qualified construction management firm to provide “FULL SERVICE” construction management on the proposed project. The Construction Manager (CM) selected will become a responsible, cooperative and contributing member of the Owner’s professional team for the design and construction of the project. The Construction Manager (CM) will provide assistance and advice and provide management services to the Owner and design consultants to assure the project is completed within defined budget, program and schedule.
The proposal shall include pricing for all phases as described herein.
The ultimate total scope of this project is $265 million, with a total maximum construction budget of approximately $212,000,000 to include costs for Construction Management Services as well as for the award of trade contracts. The initial Phase 1 of this project is $165 million with a maximum construction budget of $131,000,000.
This phase will include the construction of the core and shell and fit-out of the research facility to the limits of the budget.
Rockcastle County Schools – Mt Vernon Elementary School Roof Replacement
Rockcastle County Schools – Mt Vernon Elementary School Roof Replacement
The bid is to furnish all necessary labor, materials, tools, machinery, warranties, and all other items required to replace an existing ballasted membrane roof with a new PVC membrane roofing system. Work to include, but not limited to; ballasted membrane, coping removal and disposal; installation of additional insulation and new roofing membrane and flashing around existing roof penetrations. Project also includes repainting existing bus canopy standing seam roof.
Southcentral Kentucky Community & Technical College
Estimate:
$125,000.00
This Project consists of a complete tear off of the existing 10,250 s.f roof system. Roof replacement will consist of: a two-ply (SBS) modified bitumen roof system consisting of a base ply and a finish ply over coverboard, two layers (min.) of tapered insulation and coated aluminum flashing sheets. A new roof access hatch and expansion joint cover cap is to be installed. A 20-yr. no dollar limit type roof warranty will be required after roof installation. SEE DRAWINGS AND PROJECT CONSTRUCTION SPECIFICATIONS FOR COMPLETE DETAILS.
Beaumont Presbyterian Church – Fellowship Hall Addition and Renovation
Beaumont Presbyterian Church – Fellowship Hall Addition and Renovation
Project Description
The work generally consists of the construction of an addition and interior renovation of the Church’s Fellowship Hall and support areas.
The estimated cost of construction for the facility is $334,325.
LFUCG – Cardinal Lane Stormwater Improvements Phase 1 and 3 REBID
LFUCG – Cardinal Lane Stormwater Improvements Phase 1 and 3 REBID
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for CARDINAL LANE STORMWATER IMPROVEMENTS PHASE 1 & 3, BID NO. 88-2015.
Roof Replacement at Beechmont, Portland, California & Shawnee Community Centers #3458
Roof Replacement at Beechmont, Portland, California & Shawnee Community Centers #3458
A Request for Proposal to furnish all labor, material and necessary equipment for Roof Replacment at Beechmont, Portland, California & Shawnee Community Centers.
2363.0 Academic Science Building Bid Package 06 Select Rebids – Tiling and Traffic Coatings
2363.0 Academic Science Building Bid Package 06 Select Rebids – Tiling and Traffic Coatings
In general, Bid Package 06 – Select Re-Bids includes the necessary work items required to furnish and install interior tiling and traffic coatings, including all labor, materials, floor/slab preparation, sealants, incidentals and accessory items required for a complete installation.
Sanitary Sewer and Water Improvements
Estimate: $786,688.00
WATER PORTION:
This project will construct approximately 8, 720′ of 8″ waterline, 225′ of 1 O” horizontally
directionally drilled (HOD) waterline, a Subsurface Utility Engineer (SUE) investigation to allow
safe installation of the new waterline, clearing and grubbing to allow the SUE investigation and
safe installation, and various other miscellaneous water related items.
SANITARY SEWER PORTION:
This project will construct approximately 275′ of 8″ gravity sanitary sewer, 175′ of 8″ HOD gravity
sanitary sewer, 35′ of 6″ force main, formally abandon various items, place tow (2) new
manholes, replace approximately six (6) combination sewage valves, conduct an odor control
pilot study and provide appropriate odor control facilities, abandon an existing lift station,
construct a new lift station, and various other miscellaneous sanitarv sewer related items.
Maintenance Building
Estimate:
$380,380.00
1. Work consists of all labor, materials, services, and equipment to install approximately 31,500 square feet of 2-ply SBS modified bitumen roofing, over 1/2″ cover board, over existing gravel surfaced 3-ply built-up roofing. Concealed wet areas, where indicated, shall be cut out and replaced with new insulation.
2. Work consists of all labor, materials, services, and equipment to replace approximately 2,300 square feet of standing seam metal roofing. Select areas of metal siding shall be replaced, along with new mechanical wall louvers.
3. Sheet metal copings, trim, gutters, and downspouts shall be removed and replaced with new.
CCK-2049-15 Kinkead Hall Doorway Systems Renovation 2015
CCK-2049-15 Kinkead Hall Doorway Systems Renovation 2015
This Project is to return the four Kinkead Hall exterior entrance doors and entrance systems to the original architectural design and in excellent repair.
The Project is to remove and dispose of the existing 2001 Tremco roof insulation and membrane from the top elevation (Area 1 & 2) of the Central Heating Plant #2 located at 598 South Upper Street in Lexington, KY. The project will include the preparation of the concrete slab to facilitate the proper installation of the new roof membrane. The new membrane will be a one-ply Hyload 150E membrane mopped to the slab using Tremco THERMastic SEB modified bitumen. Tremco THERMastic SEBS will be required adhesive for the project.
West Jessamine High School Bleacher Seating Repair and Painting of Structure
West Jessamine High School Bleacher Seating Repair and Painting of Structure
Project consists of renovation of existing outdoor bleachers at the existing high school.
Project cost range is anticipated to be under $100, 000.
Construction Contract: Bids will be received for the following Work:
1. General Contract (all trades).
2363.0 Academic Science Building BP07 Audio-Visual and Finish Sitework
2363.0 Academic Science Building BP07 Audio-Visual and Finish Sitework
In general, Bid Package 07 includes the necessary work items required to provide complete, integrated audio and visual systems in select rooms and public spaces throughout the building, and to provide final/finish site work, inclusive of finish grading, site concrete (walks and walls), site masonry, paving, landscape/plantings and irrigation (Rainwater Harvesting).
City of Somerset – Casey County High School/KY70 Gas Transmission Main Relocation
Casey County High School/KY70 Gas Transmission Main Relocation
The primary scope of work includes the installation of 3,575 feet of 8-inch steel gas transmission main, 130 feet of 16-inch steel casing pipe (horizontal directional drill), and related appurtenances.
Oldham County Environmental Authority – RFP Mobile Dewatering Equipment
Oldham County Environmental Authority – RFP Mobile Dewatering Equipment
The RFP seeks priced proposals for a fully-functional, mobile dewatering system described in the RFP, delivered to Oldham County Environmental Authority (OCEA). The dewatering system shall be mounted on an aluminum trailer designed to resist corrosion from the wet environment and the typical corrosive atmosphere present when dewatering undigested Waste Activated Sludge (WAS). The trailer-mounted, mobile dewatering system shall be designed to be hauled by a 1-Ton utility truck.
RFB-239-15 Kentucky State Police Post 8 Roof Repair
Estimate:
$ 64,000.00
The project consists of roof replacement on one (1) building; KSP: Post 8. Remove existing roof membrane system down to existing metal roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over two layer insulation, and cover board insulation. Provide crickets and tapered components where indicated. Provide new metal components; e.g. metal coping caps, plumbing vent flashings, exhaust fan caps, etc. Perimeter to be built-up with wood components
Prestonsburg Campus BSCTC
Estimate:
$184,000.00
This project consists of installation of a new elevator in two-story lobby of Pike Building on the campus BSCTC in Prestonsburg, Kentucky. The new shaft and elevator equipment room will be located in a portion of the lobby of the building. After the new installation is complete, the old elevator and equipment will be removed by the contractor if funds allow by inclusion of Add Alternate No. 1. The new elevator will be a jackholeless hydraulic elevator 100 fpm 2100 lbs. capacity. New finishes associated with the installation of new walls will be part of this project. Associated MEP services to the elevator will be upgraded according to code.
Tenant Improvements for the Craftsman Training Program at the Kentucky Center for African American Heritage #3451
Tenant Improvements for the Craftsman Training Program at the Kentucky Center for African American Heritage #3451
To furnish all labor, material and necessary equipment for Tenant Improvements for the Craftsman Training Program at the Kentucky Center for African American Heritage.