Uncategorized

2425.0 RFP for CM Services for Research Building 2

2425.0 RFP for CM Services for Research Building 2

The University of Kentucky desires the services of an experienced and highly qualified construction management firm to provide “FULL SERVICE” construction management on the proposed project. The Construction Manager (CM) selected will become a responsible, cooperative and contributing member of the Owner’s professional team for the design and construction of the project. The Construction Manager (CM) will provide assistance and advice and provide management services to the Owner and design consultants to assure the project is completed within defined budget, program and schedule.
The proposal shall include pricing for all phases as described herein.
The ultimate total scope of this project is $265 million, with a total maximum construction budget of approximately $212,000,000 to include costs for Construction Management Services as well as for the award of trade contracts. The initial Phase 1 of this project is $165 million with a maximum construction budget of $131,000,000.
This phase will include the construction of the core and shell and fit-out of the research facility to the limits of the budget.

Lexington, KY

Click Here to View

Rockcastle County Schools – Mt Vernon Elementary School Roof Replacement

Rockcastle County Schools – Mt Vernon Elementary School Roof Replacement

The bid is to furnish all necessary labor, materials, tools, machinery, warranties, and all other items required to replace an existing ballasted membrane roof with a new PVC membrane roofing system. Work to include, but not limited to; ballasted membrane, coping removal and disposal; installation of additional insulation and new roofing membrane and flashing around existing roof penetrations. Project also includes repainting existing bus canopy standing seam roof.

Mt Vernon, KY

Click Here to View

RFB-6-16 Building B Roof Replacement SKCTC

Southcentral Kentucky Community & Technical College
Estimate:
$125,000.00
This Project consists of a complete tear off of the existing 10,250 s.f roof system. Roof replacement will consist of: a two-ply (SBS) modified bitumen roof system consisting of a base ply and a finish ply over coverboard, two layers (min.) of tapered insulation and coated aluminum flashing sheets. A new roof access hatch and expansion joint cover cap is to be installed. A 20-yr. no dollar limit type roof warranty will be required after roof installation. SEE DRAWINGS AND PROJECT CONSTRUCTION SPECIFICATIONS FOR COMPLETE DETAILS.

Bowling Green, Kentucky

click here to order

4 Star Regional Industrial Park – Sanitary Sewer Extension

4 Star Regional Industrial Park – Sanitary Sewer Extension

Contract 6 consists of approximately 1,620 feet of eight inch diameter gravity sewer to be constructed at the Fourstar Regional Industrial Park.

Henderson, KY

Click Here to View

Johnson County Board of Education – Flat Gap Elementary School Renovation

Johnson County Board of Education – Flat Gap Elementary School Renovation

The project scope includes interior renovations, exterior windows, HVAC, electrical, and civil work for parking lot on the Flat Gap Elementary School.

Flat Gap, KY

Click Here to View

Beaumont Presbyterian Church – Fellowship Hall Addition and Renovation

Beaumont Presbyterian Church – Fellowship Hall Addition and Renovation

Project Description
The work generally consists of the construction of an addition and interior renovation of the Church’s Fellowship Hall and support areas.
The estimated cost of construction for the facility is $334,325.

Lexington, KY

Click Here to View

LFUCG – Cardinal Lane Stormwater Improvements Phase 1 and 3 REBID

LFUCG – Cardinal Lane Stormwater Improvements Phase 1 and 3 REBID

The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for CARDINAL LANE STORMWATER IMPROVEMENTS PHASE 1 & 3, BID NO. 88-2015.

Lexington, KY

Click Here to View

Roof Replacement at Beechmont, Portland, California & Shawnee Community Centers #3458

Roof Replacement at Beechmont, Portland, California & Shawnee Community Centers #3458

A Request for Proposal to furnish all labor, material and necessary equipment for Roof Replacment at Beechmont, Portland, California & Shawnee Community Centers.

Louisville, KY

Click Here to Order

Laurel County Schools – Hazel Green Elementary School Addition and Renovation

Laurel County Schools – Hazel Green Elementary School Addition and Renovation

Bid Packages
0300 -Concrete and General Trades
0400 -Masonry
0500 -Structural Steel
0700 – Roofing
0820 -Hollow Metal, Wood Doors, Hardware
0840 -Aluminum-Framed Entrances and Storefronts
0920 -Gypsum Board Assemblies
0930-Tile
0950 -Acoustical Panel Ceilings
0960 -Resilient Flooring and Carpet
0990 – Painting
1000 -Miscellaneous Specialties
1234 -Casework
2100 -Fire Protection
2223 -Plumbing and HVAC
2600 -Electrical
3100 -Site Excavation
3200 -Asphalt Paving

East Bernstadt, Kentucky

Click Here to View

Laurel County Schools – Sublimity Elementary School Addition and Renovation

Laurel County Schools – Sublimity Elementary School Addition and Renovation

Bid Packages:
0300 – Concrete and General Trades
0400 -Masonry
0500 – Structural Steel
0700 -Roofing
0820 -Hollow Metal, Wood Doors, Hardware
0840 – Aluminum-Framed Entrances and Storefronts
0920 -Gypsum Board Assemblies
0930-Tile
0950 – Acoustical Panel Ceilings
0960 -Resilient Flooring and Carpet
0990 – Painting
1000 -Miscellaneous Specialties
1234 -Casework
1424 – Hydraulic Elevator
2100 -Fire Protection
2223 -Plumbing and HVAC
2600 – Electrical
3100 -Site Excavation
3200 – Asphalt Paving

London, KY

Click Here to View

2363.0 Academic Science Building Bid Package 06 Select Rebids – Tiling and Traffic Coatings

2363.0 Academic Science Building Bid Package 06 Select Rebids – Tiling and Traffic Coatings

In general, Bid Package 06 – Select Re-Bids includes the necessary work items required to furnish and install interior tiling and traffic coatings, including all labor, materials, floor/slab preparation, sealants, incidentals and accessory items required for a complete installation.

Lexington, KY

Click Here to View

RFB-3-16 Whitley County Welcome Center

Sanitary Sewer and Water Improvements
Estimate: $786,688.00
WATER PORTION:
This project will construct approximately 8, 720′ of 8″ waterline, 225′ of 1 O” horizontally
directionally drilled (HOD) waterline, a Subsurface Utility Engineer (SUE) investigation to allow
safe installation of the new waterline, clearing and grubbing to allow the SUE investigation and
safe installation, and various other miscellaneous water related items.
SANITARY SEWER PORTION:
This project will construct approximately 275′ of 8″ gravity sanitary sewer, 175′ of 8″ HOD gravity
sanitary sewer, 35′ of 6″ force main, formally abandon various items, place tow (2) new
manholes, replace approximately six (6) combination sewage valves, conduct an odor control
pilot study and provide appropriate odor control facilities, abandon an existing lift station,
construct a new lift station, and various other miscellaneous sanitarv sewer related items.

Whitley, Kentucky

click here to order

RFB-1-16 KY Expo Ctr Roof Repair/Replacement

Maintenance Building
Estimate:
$380,380.00
1. Work consists of all labor, materials, services, and equipment to install approximately 31,500 square feet of 2-ply SBS modified bitumen roofing, over 1/2″ cover board, over existing gravel surfaced 3-ply built-up roofing. Concealed wet areas, where indicated, shall be cut out and replaced with new insulation.
2. Work consists of all labor, materials, services, and equipment to replace approximately 2,300 square feet of standing seam metal roofing. Select areas of metal siding shall be replaced, along with new mechanical wall louvers.
3. Sheet metal copings, trim, gutters, and downspouts shall be removed and replaced with new.

Louisville, Kentucky

click here to order

Columbia/Adair Utilities District – Downtown Water System Replacement/Burkesville Street Waterline Replacement

Columbia/Adair Utilities District – Downtown Water System Replacement/Burkesville Street Waterline Replacement

Downtown Water System Replacement Phase 1, Section 2
Burkesville Street Waterline Replacemen

Columbia, KY

Click Here to View

CCK-2049-15 Kinkead Hall Doorway Systems Renovation 2015

CCK-2049-15 Kinkead Hall Doorway Systems Renovation 2015

This Project is to return the four Kinkead Hall exterior entrance doors and entrance systems to the original architectural design and in excellent repair.

Lexington, KY

Click Here to View

CCK-2048-15 Central Heating 2 Plant Reroof

CCK-2048-15 Central Heating 2 Plant Reroof

The Project is to remove and dispose of the existing 2001 Tremco roof insulation and membrane from the top elevation (Area 1 & 2) of the Central Heating Plant #2 located at 598 South Upper Street in Lexington, KY. The project will include the preparation of the concrete slab to facilitate the proper installation of the new roof membrane. The new membrane will be a one-ply Hyload 150E membrane mopped to the slab using Tremco THERMastic SEB modified bitumen. Tremco THERMastic SEBS will be required adhesive for the project.

Lexington, KY

Click Here to View

West Jessamine High School Bleacher Seating Repair and Painting of Structure

West Jessamine High School Bleacher Seating Repair and Painting of Structure

Project consists of renovation of existing outdoor bleachers at the existing high school.
Project cost range is anticipated to be under $100, 000.
Construction Contract: Bids will be received for the following Work:
1. General Contract (all trades).

Nicholasville, KY

Click Here to View

2363.0 Academic Science Building BP07 Audio-Visual and Finish Sitework

2363.0 Academic Science Building BP07 Audio-Visual and Finish Sitework

In general, Bid Package 07 includes the necessary work items required to provide complete, integrated audio and visual systems in select rooms and public spaces throughout the building, and to provide final/finish site work, inclusive of finish grading, site concrete (walks and walls), site masonry, paving, landscape/plantings and irrigation (Rainwater Harvesting).

Lexington, KY

Click Here to View

City of Somerset – Casey County High School/KY70 Gas Transmission Main Relocation

Casey County High School/KY70 Gas Transmission Main Relocation

The primary scope of work includes the installation of 3,575 feet of 8-inch steel gas transmission main, 130 feet of 16-inch steel casing pipe (horizontal directional drill), and related appurtenances.

Somerset, KY

Click Here to View

Metcalfe County Elementary School Addition and Remodeling

Metcalfe County Elementary School Addition and Remodeling

The following Bids are requested:
BID PACKAGE 010-Site, Storm Drainage and Demolition
BID PACKAGE 020 – Asphalt Paving
BID PACKAGE 030-Concrete & General Trades
BID PACKAGE 040 – Masonry
BID PACKAGE 050 -Structural Steel and Miscellaneous Steel
BID PACKAGE 074 -Metal Roofing
BID PACKAGE 080-Steel Doors, Frames, Flush Wood Doors and Finish Hardware
BID PACKAGE 084 – Aluminum Windows and Glazing
BID PACKAGE 092 -Gypsum Board Assemblies and EIFS
BID PACKAGE 094 -Terrazzo
BID PACKAGE 095 -Acoustical Panel Ceilings
BID PACKAGE 096 -Resilient Tile
BID PACKAGE 099 -Painting and Joint Sealants

Edmonton, KY

Click Here to View

Hardin County Schools – North Hardin High School – Phase 7 Kitchen Equipment Package

Hardin County Schools – North Hardin High School – Phase 7 Kitchen Equipment Package

Furnishing of all labor, materials, supplies, tools, services, etc., necessary for: KITCHEN EQUIPMENT PACKAGE FOR NORTH HARDIN HIGH SCHOOL – PHASE 7

Radcliff, KY

Click Here to View

Oldham County Environmental Authority – RFP Mobile Dewatering Equipment

Oldham County Environmental Authority – RFP Mobile Dewatering Equipment

The RFP seeks priced proposals for a fully-functional, mobile dewatering system described in the RFP, delivered to Oldham County Environmental Authority (OCEA). The dewatering system shall be mounted on an aluminum trailer designed to resist corrosion from the wet environment and the typical corrosive atmosphere present when dewatering undigested Waste Activated Sludge (WAS). The trailer-mounted, mobile dewatering system shall be designed to be hauled by a 1-Ton utility truck.

Project Location: LaGrange, Kentucky

Click Here for more Details

RFB-239-15 Kentucky State Police Post 8 Roof Repair

Estimate:
$ 64,000.00
The project consists of roof replacement on one (1) building; KSP: Post 8. Remove existing roof membrane system down to existing metal roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over two layer insulation, and cover board insulation. Provide crickets and tapered components where indicated. Provide new metal components; e.g. metal coping caps, plumbing vent flashings, exhaust fan caps, etc. Perimeter to be built-up with wood components

Morehead, Kentucky

click here to order

RFB-240-15 Elevator Replacement-Pike Building

Prestonsburg Campus BSCTC
Estimate:
$184,000.00
This project consists of installation of a new elevator in two-story lobby of Pike Building on the campus BSCTC in Prestonsburg, Kentucky. The new shaft and elevator equipment room will be located in a portion of the lobby of the building. After the new installation is complete, the old elevator and equipment will be removed by the contractor if funds allow by inclusion of Add Alternate No. 1. The new elevator will be a jackholeless hydraulic elevator 100 fpm 2100 lbs. capacity. New finishes associated with the installation of new walls will be part of this project. Associated MEP services to the elevator will be upgraded according to code.

Prestonsburg

click here to order

Tenant Improvements for the Craftsman Training Program at the Kentucky Center for African American Heritage #3451

Tenant Improvements for the Craftsman Training Program at the Kentucky Center for African American Heritage #3451

To furnish all labor, material and necessary equipment for Tenant Improvements for the Craftsman Training Program at the Kentucky Center for African American Heritage.

Louisville, KY

Click Here to Order

Subscribe