City of Frankfort – 2015 Public Works Department Unit Price Concrete Projects
City of Frankfort – 2015 Public Works Department Unit Price Concrete Projects
Project Description:
General concrete sidewalk and curb maintenance and construction, new sidewalk and curb construction, and miscellaneous storm sewer construction to be performed for the City of Frankfort on an as needed, cafeteria style project scope with bid unit prices to remain in affect for a period of one-year from the stated bid opening.
Middletown Industrial Park WQTC Elimination project
Middletown Industrial Park WQTC Elimination project
This Contract provides for the installation of approximately 241 linear feet of 15-inch sewer, 681 linear feet of 12-inch sewer, 783 linear feet of 12-inch CIPP lining, 6 sanitary manholes, decommissioning of the Middletown Industrial Park WQTC, erosion control, and appurtenant work. The project is generally located between Middletown Industrial Boulevard and Aiken Road in the City of Middletown.
Housing Authority of Carrollton – Modernization Project
Housing Authority of Carrollton – Modernization Project
The project consists of:
Water Heater Replacement at site KY057-02A. Site Improvements and Facade Upgrades at site KY057-03. Bathroom Upgrades and Water Heater Replacement at site KY057-04B.
The Scope of Work includes the following:
Bid Package A – Replacement of Boilers & Gas Meters
Bid Package B – Exterior Security Camera System Site wide
Bid Package C – Chain-Link Fencing & Site Drainage Improvements
Provide all labor, tools, equipment and materials to construct trail, bridge abutments and placement of bridge. Bridge is currently located onsite and will be provided for use at Wellington Park, 565 Wellington Way, Lexington, KY 40503
This contract consists of approximately 240 LF of 1 O” waterline, 4,530 LF of 8″ waterline, 2,800 LF of 6″ waterline, 1,790 LF of 4″ waterline and 4,905 LF of 3″ waterline, 4,350 LF of 1″ and 2″ service tubing, 2,000 LF of bored and open cut encasement, 23 ea. gate valves, 12 ea. blow off assemblies, 37 meter settings or re-connections, and all necessary fittings and appurtenances. This is a relocation of existing facilities. No rock trenching will be allowed on this project.
Shelbyville Municipal Water and Sewer Commission – Diageo Pump Station and Force Main
Shelbyville Municipal Water and Sewer Commission – Diageo Pump Station and Force Main
Project Description:
14,000 L.F. -8″ Dia. SDR 21 PVC force main sewer with accessories
400 L.F. -3″ Dia. SDR 21 PVC force main sewer with accessories
2 -4′ Dia. Manholes with accessories
1 – 400gpm Pump Station with Control Building
VAV HVAC Renovation – Phase I
Estimate:
$1,465,000.00
The work involves demolition and replacement of the air terminal units/reheat coils for all four floors of the building. The scope can be described as follows:
1) Installation of flushing tees and isolation valves for each floor.
2) Initial flushing of the existing reheat loop and final flushing of the reheat loop with new work.
3) For each space, a general description of the work involved is as follows (but not limited to):
a. Preparation of spaces for demolition and installation (protecting finishes and furniture within the space)
b. Demolish of ceiling system to accommodate new work and temporary “hanging” of devices installed within the ceiling system.
c. Demolition of air terminal unit, associated ductwork, associated electrical work, and associated controls.
d. Installation of new air terminal unit and its associated components with new controls.
e. Restoration/replacement of ceiling system
f. Clean up of space and return back to the owner.
4) Spaces will be provided as broken down on sheets G-1 through G-4. Work within the spaces is to be completed within a 10 business day duration.