Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Man O’ War Landscape, Lexington-Fayette County, Kentucky.
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Newtown Pike at I-75 Median Landscape, Lexington-Fayette County, Kentucky.
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Newtown Pike at Main Street Landscape, Lexington-Fayette County, Kentucky.
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, ofthis document, for the Oliver Lewis Way Landscape project, Lexington-Fayette County, Kentucky.
Rockcastle County Schools – Mount Vernon Elementary – Boiler Replacement
Rockcastle County Schools – Mount Vernon Elementary – Boiler Replacement
The bid is to furnish all necessary labor, materials, tools, machinery, warranties, and all other items required to replace an existing coal fired boiler and install a new electric boiler. Work to include, but not limited to; equipment demolition and disposal, minor building wall removal, piping insulation, hydronic piping, ventilation and electrical. Project also includes the replacement of an existing kitchen make-up air unit according to the contract documents
Bullock Pen Water District – Looped Water Lines Phase 14
Bullock Pen Water District – Looped Water Lines Phase 14
Construction of Contract 1 – White Chapel/Chipman Ridge section of the Looped Water Lines, Phase 14 project will consist of construction of 1,440′ of 6″ PVC waterline, 500′ of 8″ HDPE waterline, jack & bored casing pipe, directional bored casing pipe, gate valves, wet tap, dry tap, air release valve, fire hydrant, bypass meter, and all other necessary appurtenances.
Construction of Contract 2 – Mitts/Chipman Ridge section of the Looped Water Lines, Phase 14 project will consist of construction of 2,720′ of 6″ PVC waterline, 160′ of 8″ HDPE waterline, service lines, directional bored casing pipe, gate valves, wet tap, dry tap, air release valve, fire hydrant, meters, and all other necessary appurtenances.
Construction of Contract 3 – Williamstown Master Meter Connection section of the Looped Water Lines, Phase 14 project will consist of construction of 1,940′ of 6″ PVC waterline, 520′ of 8″ HDPE waterline, jack & bored casing pipe, gate valves, wet tap, dry tap, air release valve, fire hydrant, master meter assembly, and all other necessary appurtenances.
Construction of Contract 4 – Vallandingham/Osborne section of the Looped Water Lines, Phase 14 project will consist of construction of 2,100′ of 6″ PVC waterline, 380′ of 8″ HDPE waterline, service lines, directional bored casing pipe, gate valves, dry taps, air release valve, fire hydrants, meters, concrete & pipe encasement, asphalt replacement, gravel driveway replacement, and all other necessary appurtenances.
Lodge and Guest Rooms
Estimate:
$857,000.00
This project consists of roof replacements on the Main Lodge and Nine (9) Guest Room Buildings.
Roofing Work:
a. Remove entire roof system down to roof substrate; inspect roof deck and repair as required, as per unit prices.
b. Replace 3×6 double tongue & groove as indicated on drawings.
c. Install new rigid insulation, tapered insulation, all metal components, and SBS-Modified Bituminous Membrane System as indicated on the drawings
RFB-230-15 ADA Pool Lifts and Steps KY State Parks – East
Various Sites, Kentucky
Estimate:
$ 52,350.00
This Work includes providing and installing a battery power ADA Compliant Pool Lift Chair and/or ADA Compliant Pool Steps at the follow State Park Pools:
1. Natural Bridge State Resort Park
a. One battery powered lift with cover and transport caddy.
b. One set portable ADA compliant pool steps, sized for 3’-0″ pool depth.
2. Jenny Wiley State Resort Park
a. One battery powered lift with cover and transport caddy.
3. Greenbo Lake State Resort Park
a. Lodge Pool
1) One battery powered lift with cover and transport caddy.
B. Community Pool
1) One battery powered lift with cover and transport caddy.
2) One set portable ADA compliant pool steps, sized for 3’-0″ pool depth.
4. Carter Caves State Resort Park
a. Community Pool
1) One set portable ADA compliant pool steps, sized for 3’-0″ pool depth.
RFB-232-15 ADA Pool Lifts and Steps KY State Parks – West
Various Sites, Kentucky
Estimate: $24,800.00
This Work includes providing and installing a battery power ADA Compliant Pool Lift
Chair and/or ADA Compliant Pool Steps at the follow State Park Pools:
1 . Kentucky Dam Village State Resort Park
a. One battery powered lift with cover and transport caddy.
2. Barren River Lake State Resort Park
a. One battery powered lift with cover and transport caddy.
3. Dale Hollow Lake State Resort Park
a. One battery powered lift with cover and transoort caddY
RFB-228-15 Freedom Hall Roof and Fascia Repair Phase II
Kentucky Fair and Exposition Center
Estimate:
$1,234,641.00
Replace roof system on Freedom Hall, Kentucky Fair & Exposition Center, Louisville, Kentucky, including Areas A, A1, A2, B, B1, B2, E, F, G, H, I and J. The work includes removal of existing roofing systems, replacement roofing systems, roof-over systems, modification of Area A penthouse siding, roof accessories, refurbishment of roof drainage systems, EFIS repair and miscellaneous work related to the roofing.
RFB-233-15 ADA Pool Lifts and Steps KY State Parks – South
Various Sites, Kentucky
Scope of Work:
Estimate: $ 44,200.00
This Work includes providing and installing a battery power ADA Compliant Pool Lift
Chair and/or ADA Compliant Pool Steps at the follow State Park Pools:
1. Cumberland Falls State Resort Park
a. One battery powered lift with cover and transport caddy.
b. One set portable ADA compliant pool steps, sized for 3′-0″ pool depth.
2. Levi Jackson State Park
a. One battery powered lift with cover and transport caddy.
b. One set portable ADA compliant pool steps, sized for 4′-0″ pool depth.
3. Fort Boonesboro State Park
a. One battery powered lift with cover and transport caddy.
b. One set portable ADA compliant pool steps, sized for 3′-0″ pool depth.
Project consists of construction of a bus parking lot, bus garage and employee parking.
1. Project cost range is anticipated to be under $1,250,000.
Construction Contract: Bids will be received for the following Work:
1. General Contract (all trades).
Project consists of construction of a bus parking lot, bus garage and employee parking.
1. Project cost range is anticipated to be under $1,250,000.
Construction Contract: Bids will be received for the following Work:
1. General Contract (all trades).
This package involves the Interior Fit-Up work for the Phase 1F PAV A – Redundant Glycol Loop. The work will be performed under contract with the Construction Manger, Turner Construction Company.
Separate bids for this project shall be submitted for the following work categories:
Redundant Glycol Loop
TC-035 – Mechancial
TC-036 – Electrical
Berea College Bingham Hall Renovations And Additions
Berea College Bingham Hall Renovations And Additions
Bid Package 01 – Construction
The entire 16,000 square feet of existing Bingham Hall will be completely renovated and approximately 10,700 square feet of additions will be constructed to include an expansion area for the dormitory showers and a new two-story entry-commons area on the east side of the existing three-story building. The infill area between the existing dormitory and the new entry-commons area will contain a new elevator and a new open stair.
The new 26,700 square foot facility will remain double occupancy and house 86 students. The new two story entry-commons area addition will contain a lounge area, coffee bar, office, accessible toilet rooms and an apartment on the first floor , and a lounge, coffee bar, accessible toilet room, study and classroom on the second floor. The attic of the two-story addition will contain a mechanical space.
The building’s mechanical, electrical, and plumbing systems will be replaced and updated as part of the project to provide not only a quality housing environment but also compliance with life safety and accessible codes.
In general, Bid Package 01 includes all Work required for the complete construct ion of the Project
AMP 201 Community Building Renovation Crescent Drive KY 14-03 and McIntyre Circle KY 14-01
Public Notes:
WORK WILL INCLUDE THE FOLLOWING: AMP 201 Community Building Renovation Crescent Drive KY 14-03 and McIntyre Circle KY 14-01
RFB-224-15 Central Lab Exterior Wall Renovation-Phase V
Central Lab Frankfort, Kentucky
Estimate:
$425,000.00
The Centralized Laboratory facility exterior renovation Phase V, located at 100 Sower Boulevard, Frankfort, Kentucky (Franklin, County), consists of upgrades and repairs to the exterior walls. The base bid shall consist of work that is primarily on the west and north sides of the facility. This work shall include, cleaning, sealant replacement, and reinstallation of exterior metal wall panels. Work on the interior of the wall system shall include sheathing repair, liquid applied waterproofing, and spray foam insulation. Interior work shall also include work at the basement level. This work shall include installation of the west concrete wall along a hallway and the reworking of an exterior louver system to create a waterproof barrier. The work of this project shall require access to the interior of the lab facility and will require security clearance (background checks) for all employees who will be working on or at the site.
15-85 / Standard Country Club Tank Coatings Renovation
15-85 / Standard Country Club Tank Coatings Renovation
Louisville Water Company is requesting Bids for a complete coatings renovation of the Standard Country Club Tank, existing elevated water storage tanks, including surface preparation, coating application, electrical work and miscellaneous tank accessories and site work.
City Of Frankfort – Fort Boone Pump Station Replacement
City Of Frankfort – Fort Boone Pump Station Replacement
The project scope includes constructing a 660 gpm Submersible Pump Station consisting of a 10′ diameter wetwell, valve vault , 548 LF of 8′ gravity sewer, 272 LF of 8″ force main and the demolition of the existing pump station.
City Of Berea – Clay Drive – Woodford Avenue Sanitary Sewer Rehabilitation
City Of Berea – Clay Drive – Woodford Avenue Sanitary Sewer Rehabilitation
Sanitary sewer rehabilitation by means of both trench and trenchless technologies as shown on the drawings and/or Described in the Specifications. Approximatelv 2,500 LF of sewer line and 13 manholes are included in the scope of this sanitary sewer rehabilitation. The bids will include all provisions of the project including all associated work necessary to provide a finished product that meets the requirements set forth in the Contract Documents.