Description and location of Project: This green infrastructure project involves the construction of several linked infiltration trenches within the Portland Neighborhood along the 17th St corridor. The intersections in the area will be reconstructed to include new sidewalks, trees and plantings. A mandatory pre-bid meeting will be held at the Main Office Building, 700 W Liberty Street , at 1:00 PM Local Time, September 2, 2015. The requirements of MSD’s Supplier Diversity (MBE/WBE Participation) Contractor Compliance Program (CCP) will be fully explained at this meeting. The deadline for a Waiver Request on this Contract is 5:00 P.M. Local Time, September 4, 2015.
Project Description:
The intent of this project is to clean the entire building exterior surface, complete identified surface repairs including the removal/repair of all rust producing elements in the surfaces (800 locations included in the base bid) and stress-produced damages on the building (as well as un-identified and negotiated repairs), remove all existing caulk and prepare the joints to the satisfaction of the Owner, re-caulk with an aliphatic urethane caulk of Owner selected color. Caulk-removal includes, but is not limited to, the caulking the perimeters of door and window frames, perimeter of louvers, flashing reglets of parapet walls, between pre-cast panels (horizontal and vertical), and between curbs and precast panels. The only joints not to be re-caulked are those joints where precast panels are sitting on curbs having a through-wall flashing having no weep-ropes or vents (especially at the foundation wall). The project includes the removal of scum from and the cleaning of all exterior glass surfaces.
RFB-66-16 Upgrade State Data Center Readiness-Switchgear
RFB-66-16 Upgrade State Data Center Readiness-Switchgear
Project Manager Name: Brian Cottongim Phone: (502) 782-0317 Email: Brian.Cottongim@ky.gov
Estimate: $1,612,645.00
Estimated Length of Project: 350 (Substantial Completion) + 21 (Final Completion)
Upgrade State Data Center Readiness – This project consists of multi-phased electrical upgrades for the Commonwealth Office of Technology in Frankfort, Franklin County, Kentucky. Work primarily consists of the addition and replacement of medium voltage and low voltage electrical distribution equipment and cabling. Miscellaneous supporting HVAC and General Trades construction is also included.
A General Construction contract including Mechanical, Electrical, and any incidental but related work required to replace a portion of the existing roof on the existing Johnson County Public Library building.
Laurel County Water District #2 – Contract 13 – Aisin to US25 Water Line Extension
Laurel County Water District #2 – Contract 13 – Aisin to US25 Water Line Extension
Project Description:
Contract 13 – US25 Water Main Extension will consist of construction of the approximately 140 LF of 12″ PVC water main and appurtenances and CSX Railroad crossing. Excavation is unclassified. The Contractor shall furnish all materials, equipment and labor necessary to complete the construction of the facilities, including trenching, excavation, installation of the facilities, all tie-ins, appurtenances, testing, clean-up, etc. and any other action required for a complete installation.
Scott County Board of Education – Great Crossing High School Site Preparation
County Board of Education – Great Crossing High School Site Preparation
The following Bids are requested:
BID PACKAGE 010- Site Grading and Storm Drainage
BID PACKAGE 020 -Asphalt Paving
The Form of Proposal and Proposal Envelope must be requested from the Construction Manager, Alliance Corporation, P. 0. Box 1480, Glasgow, KY 42142-1480 (phone 270/651-8848, fax 270/651-2915). Any Bidder requesting a Proposal Form and Proposal Envelope, who has not previously obtained a set of plans shall be required to purchase the Project Manual at a cost of $25.00, non-refundable with the check made payable to the Construction Manager (Alliance Corporation). All bids shall be submitted only on the Form of Proposal and in the Envelope prepared by the Construction Manager. The Proposal Envelope will have the Project and respective Bid Package(s) number affixed.
2402.1 Phase 1 F PAV A 9th and 10th Floors Fit-Out Final Cleaning Package
2402.1 Phase 1 F PAV A 9th and 10th Floors Fit-Out Final Cleaning Package
PROJECT DESCRIPTION
This package involves the Interior Fit-Up work for the Phase 1 F PAV A – 9th and 10th Floors. The work will be performed under contract with the Construction Manger, Turner Construction Company. Separate bids for this project shall be submitted for the following work categories:
9th and 10th Floors Fit-Out- FINAL CLEANING PACKAGE
THE PROJECT INVOLVES CONSTRUCTION OF AN APPROXIMATELY 3,030 SQUARE FOOT BUILDING ADDITION TO HOUSE THE MEDICAL COMMAND UNIT. THE PRIMARY STRUCTURAL SYSTEM IS LOAD BEARING INSULATED CONCRETE FORM WALLS. THE ROOF CONSISTS OF STANDING SEAM STEEL PANELS ON STRUCTURAL INSULATED PANELS BEARING ON ENGINEERED WOOD TRUSSES. OPENINGS IN THE EXTERIOR INCLUDE ALUMINUM FRAMED STOREFRONT WINDOWS, AND HOLLOW METAL DOORS AND FRAMES. STEEL SIDING OVER A BRICK KNEE WALL IS THE EXTERIOR CLADDING MATERIAL FOR THE BUILDING. THE INTERIOR FINISHES INCLUDE CERAMIC TILE, POLISHED CONCRETE, PAINTED GYPSUM WALL BOARD, RESILIENT TILE, RESILIENT WALL BASE, AND ACOUSTICAL PANELS CEILINGS. THE MECHANICAL SYSTEM WILL INCLUDE A HIGH EFFICIENCY HEAT PUMP WITH HEAT RECOVERY FOR FRESH AIR INTAKE. THE REST ROOMS INCLUDE CONVENTIAL FIXTURES IN BOTH MENS AND WOMENS.
‘Northpoint Training Center – New Sallyport Gates’ project includes but is not limited to the demolition and refurbishment of the specified portions of two vehicular sallyport gates and associated concrete matching, steel repair, painting, electrical, etc located at Northpoint Training Facility, Northpoint Training Center, 710 Walter Reed Rd, Burgin, KY, 40310.
Project Description:
Consisting of the construction and/or furnishing of items in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, and as indicated in the construction documents and drawings, for the Replacement Fire Station No. 2 located in Lexington-Fayette County, Kentucky.
The scope of project includes all work required to construct a Pre-Engineered Unheated Storage Building at the Armed Forces Reserve Center (AFRC), Richmond, Kentucky. The work shall be in accordance with Request for Bid documents.
City of Frankfort – Capital Avenue Pump Station Improvements
City of Frankfort – Capital Avenue Pump Station Improvements
Project Description:
The project scope includes constructing a concrete channel and walls inside an existing wet well, furnishing and installing an In-Channel Grinder including Grinder guide rails, all electrical work for the Grinder, furnishing and installing two (2) 48″ X 72″ aluminum hatches in the existing wet well slab, installation of an additional 6″ concrete slab and curb over the existing wet well, site work including storm sewer pipe, rip rap aprons, grading, seeding and fencing.
City of Taylorsville – Contract 18 Dales Lane and Kings Church Road
City of Taylorsville – Contract 18 Dales Lane and Kings Church Road
PROJECT DESCRIPTION: The project includes but is not limited to the following:
CONTRACT 18 – WATERLINE REPLACMENTS (AT END OF DALE’S LANE & KING’S CHURCH ROAD)
a.) 27,000 L.F. 8″ , 6″ and 4″ C-900 DR14 PVC Waterline
b.) 4,350 L.F. 1″ CL 200 HDPE Service Line
c.) 53 EA 8″ , 6″, 4″ and 2″ Gate Valves
d.) 6 EA Fire Hydrants, ARV, Blow-offs
e.) 144 EA Relocate and Reconnect Meters
f.) 160 L.F. Bore and Jack 12″ Casing w/8″ waterline
a.) 8600 L.F. 8″ and 6″ C-900 DR14 PVC Waterline – LABOR ONLY
b.) 2150 L.F. 1″ CL 200 HDPE Service Line
c.) 13 EA 8″ , 6″, 4″ and 2″ Gate Valves
d.) 8 EA Fire Hydrants, ARV, Blow-offs
e.) 57 EA Relocate and Reconnect Meters
f.) 80 L.F. 16″ and 12″ Bore & Jack
City of Frankfort – Cline Street Sanitary Sewer Main Replacement Project
City of Frankfort – Cline Street Sanitary Sewer Main Replacement Project
Project Description:
installation of approximately seven (7) standard manholes and 735 linear feet of 8″ SDR 35 PVC sanitary sewer main, pre-construction CCTV documentation of existing mains, testing, fencing and landscaping repair: including all materials, labor and appurtenances.