PROJECT DESCRIPTION:
The project generally consists of: The construction of a new 3.9 MGD sanitary pump station, complete with wet well, valve vault, flowmeter vault, emergency pump connection manholes, control building, generator pad, transformer pad and installation of approximately 4,200 feet of 10″ PVC force main with ductile iron fittings, air release valves, connection to an existing force main, rerouting of approximately 165 feet of existing 15″ gravity sewer and 230′ of existing 4″ force main, and all other items shown on the plans and mentioned in the specifications for a complete project, ready for continuous operations.
Sims Road Landfill – Removal of Sediment Ponds 1 and 2
Sims Road Landfill – Removal of Sediment Ponds 1 and 2
PROJECT DESCRIPTION
The work primarily consists of the removal of two (2) sediment ponds. The work includes all related excavation, embankment, temporary erosion control, grading, seeding, and other items incidental to the project.
The Scope of Work for this project is the removal and disposal of asbestos containing materials (ACMs) from designated areas of the Administration Building and the Arts & Sciences Building at Henderson Community College.
Louisville Water Company is requesting Bids for the rehabilitation of the following existing main utilizing cured in place pipe (CIPP): 630 +/- linear feet of 12-inch DI water, 1,570 +/- linear feet of 12-inch CLD water, 1,420 +/- linear feet of 8-inch CLD water, 1,400 +/- linear feet of 6-inch CLD water, 320 +/- linear feet of 6-inch DI water. Also included with the project is the installation of 6 +/- fire hydrants and the transfer, renewal, relocation or discontinue of 116 +/- customer services.
MCTC/MSU Postsecondary Center of Excellence – Phase 1
MCTC/MSU Postsecondary Center of Excellence – Phase 1
PROJECT DESCRIPTION:
The new building will be a 2-story building which will contain classrooms, offices, Nursing laboratories and Center for Advanced Manufacturing laboratories. The building has been designed in compliance with the 2013 Kentucky Building Code and according to ADA Standards for Accessible Design. It will also be constructed to the standards of the Division of Engineering and Contract Administration, and Maysville Community and Technical College System. This project has been registered with the US Green Building Council and will attempt to achieve LEED Silver Certification. The building’s occupancy classification is Education per the Kentucky Building Code. The construction type for the building is 2B. Site development associated with the building includes building identification signage and drop off entry plaza.
F. Construction Contract: Individual bid package bids will be received by Trace Creek Construction, Inc. for the following Work:
1. Multiple Individual Bid Package Contracts consisting of the following bid packages:
01 Paving
02 General Trades
03 Masonry
04 Structural Steel
05 Roofing and Insulated Wall Panel System
06 Aluminum Curtain wall, Storefront & Windows
07 Gypsum Board Systems & Acoustical Ceilings
08 Resilient Tile flooring & Carpeting
09 Tile
10 Painting
11 Elevator
12 Mechanical
13 Fire Suppression
14 Electrical
TARC – NIA Center Customer Service Area Renovations
TARC – NIA Center Customer Service Area Renovations
PROJECT DESCRIPTION:
Furnishing of all labor and materials and the performance of all work required for the: Transit Authority of River City – NIA Center, Customer Service Area Renovations
Estimate: $ 64,815.75
Estimated Length of Project: (Substantial Completion) + September 30, 2016 (Final Completion)
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 10 acres of mine land in Letcher county to do reclamation earthwork, pond removals, install ditches and culverts, apply roadway stone to access road as needed, and revegetation on 1 bond forfeiture permit(s). Please see spec book for full project description
Southern Water and Sewer District – Harold Sewer Project Phase 3
Southern Water and Sewer District – Harold Sewer Project Phase 3
PROJECT DESCRIPTION:
This project consists of the providing of all materials, labor, and equipment for the construction of:
A pressure sewer system including HDPE collector sewers, HDPE service line, 96 simplex residential grinder pump stations, and one conventional submersible pump station complete with odor control system.
Winchester Municipal Utilities – Contract No. 80-Fire Hydrant Painting
Winchester Municipal Utilities – Contract No. 80-Fire Hydrant Painting
PROJECT DESCRIPTION:
Supply of paint, surface preparation, labor and paint coating of approximately 200 Fire Hydrants located throughout the water distribution system
PROJECT DESCRIPTION:
The Work includes major demolition of existing portions of the building and a new addition of approximately 10,500 SF. The new building is load bearing masonry and structural steel frame construction on structural concrete slab, grade beam and drilled concrete piers. The renovation portion of the work includes new finishes, casework, doors and hardware, electrical, plumbing and HVAC work.
Hardin County Schools – Cecilia Valley Elementary School
Hardin County Schools – Cecilia Valley Elementary School
PROJECT DESCRIPTION:
Furnishing of all labor, materials, supplies, tools, services, etc., necessary for:
Cecilia Valley Elementary School
Hardin County, Kentucky
BG 13-017
CCK-2120-16 Control Plant Boiler Installation – 2429.0
CCK-2120-16 Control Plant Boiler Installation – 2429.0
PROJECT DESCRIPTION
Remove two existing boilers and install two new owner furnished boilers. Work will include removal and reinstallation of existing front wall for installation in building, modifications of steel, re-piping of new boilers and startup. Contractor will also
CCK-2121-16 Civil Site Infrastructure – Landscape Improvement – 2445.0
CCK-2121-16 Civil Site Infrastructure – Landscape Improvement – 2445.0
PROJECT DESCRIPTION:
The Work is located on the University of Kentucky Campus in the Woodland Glen Walkway.
Major work items in this Contract include:
• Removal of existing walkways, landscaping, lighting, and accessories.
• Furnish and install new walkways, seat walls, and retaining walls.
• Furnish and install new landscape materials, all sizes.
• Furnish and install new storm sewers and accessories, all sizes.
• Furnish and install new lighting and accessories.
Morgan County High School Practice Day Locker Facility
Morgan County High School Practice Day Locker Facility
PROJECT DESCRIPTION:
The project will consist of a facility that contains home and away locker rooms, weight rooms, public restrooms, concessions area, new bleacher system, new turf (alternate bid), and new field lighting. If bidding any of the combination packages, the contractor must also bid the packages individually.
PROJECT DESCRIPTION:
This project consists of:
Contract 1: Furnish 320 grinder pump units and 5,000 LF HDPE pipe for sanitary sewer
Contract 2: Furnish and install two submersible pump units
Runway Overlay and Edge Light Replacement at Kyle Oakley Field
Murray-Calloway County Airport Board
PROJECT DESCRIPTION:
Furnishing all labor, materials and equipment and performing all work necessary for Runway Overlay and Edge Light Replacement at the Kyle Oakley Field