City of Frankfort – Contract 1 Old Lawrenceburg Road Force Main Relocation

City of Frankfort – Contract 1 Old Lawrenceburg Road Force Main Relocation

PROJECT DESCRIPTION:
Construction of Contract 1: Old Lawrenceburg Road Force Main Relocation Project for the City of Frankfort Sewer Department consisting of relocation of approximately 800 LF of existing 20” DI force main

Project Location: Frankfort, Kentucky

Click Here for More Details

RFB-269-16 Building 3 Bay A Renovation

Bluegrass Station

Project Manager Name: Ron Harris
Phone: (502) 782-0321
Email: RonL.Harris@ky.gov

Estimate: $1,861,356.00
Estimated Length of Project: 210 (Substantial Completion) + 30 (Final Completion)

The project comprises the partial demolition and reconstruction of Bay A, Building 3, Bluegrass Station, Lexington, Fayette County, Kentucky. Existing partitions, finishes, doors, fixtures, fittings and ceilings will be removed and replaced with new construction: steel studs, gypsum board, sound batts, solid-core wood doors in steel frames, aluminum entrance with automatic door, interior and exterior painting, carpet, vinyl tile flooring, suspended ceiling, fire suppression system, lighting, mechanical systems and plumbing fittings/fixtures. A small amount of exterior site work is also required.

Project Location: Lexington, Kentucky
Click Here for More Details

RFB-272-16 Emmett and Janet Murphy

AML Reclamation Project

Estimate: $409,057.50
Estimated Length of Project: (Substantial Completion) + 120 calendar days (Final Completion)

The site is located on Peter Fork Road in Pike County (Lat: 37°, 34, 17.2”, Long: 82°, 09’, 50.1”).Drainage issues and slides have developed on the Murphy and Runyon properties. The drainage issues will be corrected by constructing ditches, subdrains and pipes to direct the runoff away from the property. The slides will be corrected by constructing three non-reinforced block retaining walls and one sheet metal wall. See spec book for full project description.

Project Location: Pike Co, Kentucky

Click Here for More Details

RFB-271-16 Simpson Co Welcome Ctr and Weigh Station Renovation

Kentucky Transportation Cabinet

Project Manager Name: Keith Bohart
Phone: (502) 564-3155
Email: keith.bohart@ky.gov

Estimate: $119,159.00
Estimated Length of Project: 60 (Substantial Completion) + 30 (Final Completion)

This project consists of a limited renovation to a interstate welcome center and truck weigh station. The two facilities are approximately 1 mile apart on different sites along I-65 in Franklin, Kentucky, near the Kentucky-Tennessee line. The project includes ceramic tile repair, restroom floor coatings, new doors, door hardware, painting, custom built countertops, interior/exterior sealants, and minor electrical work as code required.

Project Location: Franklin, Kentucky

Click Here for More Details

Woodford County High School – Fire Alarm Replacement

Woodford County High School – Fire Alarm Replacement

PROJECT DESCRIPTION:
The project scope includes replacing the entire fire alarm system.

Project Location: Versailles, Kentucky

Click Here for More Details

RFB-264-16 Engineer Section Offices

RFB-264-16 Engineer Section Offices

Project Manger Name: Joseph Sandman
Phone: (502) 782-0329
Email:Joseph.Sandman@ky.gov

Estimate: $329,558.00
Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion)

The Department of Highways Engineer Section Office – Whitley County project consists of a single Base Bid. The new structure is a 2,000 GSF, single floor building. This Work includes the construction of a 2,000 sf office building at 1606 Highway 25W South, Williamsburg, KY 40769. The building is slab-on-grade with wood framed walls, vinyl clad double hung wood windows, R-21 batt insulation, shop-fabricated wood trusses, asphalt shingle roofing, and fiber cement siding. Typical floor finish to be vinyl composition tile, typical wall finish to be painted gypsum board, typical ceiling to be suspended acoustical tiles. Typical ceiling height to be 8’-0”, typical bearing wall to be 10’-1”. The HVAC system is an electric heat pump. The building will accommodate an occupancy of 21 and house the following rooms and functions: a large workroom with kitchenette, four private offices, a small conference room, men’s and women’s restrooms, mechanical room, custodial room, communications room, and reception room. The Work also includes a small concrete parking area (1 space, accessible). Consult project documents for information regarding connecting to site utilities.

Project Location: Hopkinsville, Kentucky

Click Here for More Details

RFB-270-16 MSU Renovate Expand Student Services Facility

Morehead State University

Project Manager Name: Butch Hatcher
Phone: (502)782-0322
Email: Butch.Hatcher@ky.gov

Estimate: $35,813,516.00
Estimated Length of Project: 690 (Substantial Completion) + 45 (Final Completion)

Project consists of a renovation / expansion of Morehead State University Adron Doran University Center. Site preparation will include removal of curbs, utilities, sidewalks, steps, site walls and trees. Site protection will include storm water pollution prevention / erosion control, tree protection, site perimeter protection throughout construction. New site improvements include grading, installation of new storm drainage, site utilities, new asphalt pavement and asphalt surfaces, concrete curb and gutter, brick pavers and thin brick wall veneer, concrete walkways and stairs, pipe handrails, seeding, sodding and landscape installation. 189,208 S.F. Building Renovation / Expansion of existing Adron Doran University Center. Areas in the project include new national venue restaurants, campus wide catering kitchen, a plating kitchen on the third floor, large ballroom with folding wall partitions, campus data center, admissions center, theater, Student Government Offices, Dean of Student Offices, minor upgrades to Bookstore and office suites, additional meeting rooms on third floor. Building structure is concrete frame on existing building with concrete piles and grade beams. A new brick and limestone façade is being replaced on the existing building. The new building addition structure consists of concrete pile foundation with the building frame being concrete on first and second floors and steel frame with fireproofing at the third floor. Exterior walls will be light gage metal stud with masonry veneer. The roof assembly is a T.P.O. membrane roof with polyisocyanurate insulation. Exterior openings include aluminum windows, aluminum storefront and aluminum curtainwall. Interior is made up of light gage metal stud interior partitions. The finishes include carpet tile, luxury vinyl tile, rubber tile, porcelain tile and base, interior wood casework with solid surface counter tops, wood veneer wall covering in several lobby areas. Lighting in facility will be LED lighting throughout. The building HVAC will have a 4 pipe variable air volume system. It will consist of air cooled steam to hot water heat exchangers connected to the universities control steam system. The air handling units for the existing building will be located in the existing mechanical room and penthouses. All spaces will be provided with voice annunciated fire alarm system. A roof mounted transformer will provide back-up power

Project Location: Morehead, Kentucky

Click Here for More Details

Mount Sterling – Montgomery County Airport Runway 3-21 Crack Repair, Taxiway Rehab, and Airfield Lighting Project

Mount Sterling – Montgomery County Airport Runway 3-21 Crack Repair, Taxiway Rehab, and Airfield Lighting Project

PROJECT DESCRIPTION:
Furnishing all labor, materials and equipment and performing all work necessary to complete the lighting and pavement rehabilitation project

Project Location: Mt Sterling, Kentucky

Click Here for More Details

James E. Bazell Middle School Renovation – Phase 1 Switchgear

James E. Bazell Middle School Renovation – Phase 1 Switchgear

PROJECT DESCRIPTION:
Project consists of furnishing new switchgear that will replace the school’s existing switchgear in an upcoming renovation at the middle school. New switchgear will consist of 277/480V section, transformer, and 120/208V section.
Construction Contract: Bids will be received for the following Work:
1. Switchgear Equipment (Material Only)

Project Location: Scottsville, Kentucky

Click Here for More Details

RFB-267-16 Upgrade State Data Center Readiness-Switchgear

b>RFB-267-16 Upgrade State Data Center Readiness-Switchgear

Project Manager Name: Brian Cottongim
Phone: (502) 782-0317
Email: Brian.Cottongim@ky.gov

Estimate: $1,328,930.00

Estimated Length of Project: 260 (Substantial Completion) + 21 (Final Completion)

Project Location: Frankfort, Kentucky

Click Here for More Details

EKU Athletics Complex Baseball Softball Stadiums

EKU Athletics Complex Baseball Softball Stadiums

PROJECT DESCRIPTION:
Furnish all labor and materials to complete the:
EKU ATHLETIC FACILITIES: BASEBALL AND SOFTBALL

The following bids are requested:
1 GENERAL TRADES
2 MASONRY
3 ROOFING
4 PAINTING
5 GRANDSTANDS / PRESSBOX
6 MECHANICAL
7 ELECTRICAL
8 COMBINATION

Project Location: Richmond, Kentucky
Click Here for More Details

TARC – NIA Center Exterior Improvements

TARC – NIA Center Exterior Improvements

PROJECT DESCRIPTION:
Furnishing of all labor and materials and the performance of all work required for the NIA Center, Customer Service Area Renovations

Project Location: Louisville, Kentucky

Click Here for More Details

RFB-266-16 KSU Hazardous Material Abatement

RFB-266-16 KSU Hazardous Material Abatement

Project Manager Name: Maziar Torabi
Phone: (502) 782-0335
Email: Maziar.Torabi@ky.gov

Estimate: $ 81,650.00
Estimated Length of Project: 45 (Substantial Completion) + 15 (Final Completion)

Furnish all labor, materials, services, insurance, appliances, permits, patents, decontamination facilities, and equipment in accordance with the most stringent requirements of EPA, OSHA, these specifications, and/or all other applicable regulatory agencies to complete asbestos abatement and hazardous materials removal and disposal within certain areas effected by the scope of mechanical renovations at the facilities on the campus of Kentucky State University at 400 East Main Street Frankfort, Kentucky prior to renovation/modernization activities.

Project Location: Frankfort, Kentucky
Click Here for More Details

NKCC-14d-16 Emergency Generator Units with Transfer Switches

NKCC-14d-16 Emergency Generator Units with Transfer Switches

PROJECT DESCRIPTION:
The project is generally described as the Northern Kentucky University, Health Innovation Center (HIC) Founders Hall Renovation. The project is located in Highland Heights, Kentucky, on approximately 3.0 acre site on the NKU campus, east of Kenton Drive, west of Nunn Hall and directly north of Griffin Hall. The project will include the construction of the new Health Innovation Center (HIC) building and renovation of the existing Founders Hall Building. The HIC building will consist of a new 95,000 sf four-story steel frame building with the option to shell a 5th floor of approximately 12,000 sf. The Founders Hall renovation is a 106,000 sf complete interior gut and renovation of the existing 5 story concrete-structured building.

Project Location: Highland Heights, Kentucky

Click Here for More Details

NKCC-14c-16 DOAS AHU (AHU-04)

NKCC-14c-16 DOAS AHU (AHU-04)

PROJECT DESCRIPTION:
The project is generally described as the Northern Kentucky University, Health Innovation Center (HIC) Founders Hall Renovation. The project is located in Highland Heights, Kentucky, on approximately 3.0 acre site on the NKU campus, east of Kenton Drive, west of Nunn Hall and directly north of Griffin Hall. The project will include the construction of the new Health Innovation Center (HIC) building and renovation of the existing Founders Hall Building. The HIC building will consist of a new 95,000 sf four-story steel frame building with the option to shell a 5th floor of approximately 12,000 sf. The Founders Hall renovation is a 106,000 sf complete interior gut and renovation of the existing 5 story concrete-structured building.

Project Location: Highland Heights, Kentucky

Click Here for More Details

NKCC-14b-16 Atrium AHU and Founders Hall AHU (AHU-02 and 03)

NKCC-14b-16 Atrium AHU and Founders Hall AHU (AHU-02 and 03)

PROJECT DESCRIPTION:
The project is generally described as the Northern Kentucky University, Health Innovation Center (HIC) Founders Hall Renovation. The project is located in Highland Heights, Kentucky, on approximately 3.0 acre site on the NKU campus, east of Kenton Drive, west of Nunn Hall and directly north of Griffin Hall. The project will include the construction of the new Health Innovation Center (HIC) building and renovation of the existing Founders Hall Building. The HIC building will consist of a new 95,000 sf four-story steel frame building with the option to shell a 5th floor of approximately 12,000 sf. The Founders Hall renovation is a 106,000 sf complete interior gut and renovation of the existing 5 story concrete-structured building.

Project Location: Highland Heights, Kentucky

Click Here for More Details

NKCC-14a-16 Vivarium AHU (AHU-01)

NKCC-14a-16 Vivarium AHU (AHU-01)

PROJECT DESCRIPTION:
The project is generally described as the Northern Kentucky University, Health Innovation Center (HIC) Founders Hall Renovation. The project is located in Highland Heights, Kentucky, on approximately 3.0 acre site on the NKU campus, east of Kenton Drive, west of Nunn Hall and directly north of Griffin Hall. The project will include the construction of the new Health Innovation Center (HIC) building and renovation of the existing Founders Hall Building. The HIC building will consist of a new 95,000 sf four-story steel frame building with the option to shell a 5th floor of approximately 12,000 sf. The Founders Hall renovation is a 106,000 sf complete interior gut and renovation of the existing 5 story concrete-structured building.

Project Location: Highland Heights, Kentucky

Click Here for More Details

Washington County High School Roof Replacement and Alterations REBID

Washington County High School Roof Replacement and Alterations REBID

PROJECT DESCRIPTION:
Furnishing of all labor, materials, supplies, tools, services, etc., necessary for:
ROOF REPLACEMENT & ALTERATIONS
WASHINGTON COUNTY HIGH SCHOOL – BG 16-074
601 LINCOLN PARK ROAD
SPRINGFIELD, KENTUCKY 40069

Project Location: Springfield, Kentucky

Click Here for More Details

Bath County Schools – Crossroads Elementary Phase II

Bath County Schools – Crossroads Elementary Phase II

PROJECT DESCRIPTION:
The project scope includes New drainage along the front parking lot of the school.

Project Location: Owingsville, Kentucky

Click Here for More Details

Mitchell Creek, Moren Road, and Tobacco Road Sanitary Sewer Replacement

Mitchell Creek, Moren Road, and Tobacco Road Sanitary Sewer Replacement

PROJECT DESCRIPTION:
The primary scope of work includes the installation of approximately 7,500 LF of 8-inch and 12- inch PVC and DI gravity sewer, 69 LF of 24-inch casing pipe (bore and jack), 27 sanitary sewer manholes, and related appurtenances.

Project Location: London, Kentucky

Click Here for More Details

LFUCG – Environmental Hazard Abatement at Historic Courthouse

LFUCG – Environmental Hazard Abatement at Historic Courthouse

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items for Environmental Hazard Abatement at Historic Courthouse, 215 West Main Street, Lexington-Fayette County, Kentucky.

Project Location: Lexington, Kentucky

Click Here for More Details

CCK-2127-16 Chandler Bridge HVAC Replacement

CCK-2127-16 Chandler Bridge HVAC Replacement

PROJECT DESCRIPTION:
Furnish labor and materials for the replacement of the HVAC on the Chandler Bridge.

Project Location: Lexington, Kentucky

Click Here for More Details

CCK-2126-16 UKGS Elevator D and Garage Elevator Refurbishment

CCK-2126-16 UKGS Elevator D and Garage Elevator Refurbishment

PROJECT DESCRIPTION:
Furnish labor and materials for the Elevator Refurbishments @ UKGS

Project Location: Lexington, Kentucky

Click Here for More Details

WKU-PDC-2016-007 High Voltage Underground Distribution Upgrade Phase IX

WKU-PDC-2016-007 High Voltage Underground Distribution Upgrade Phase IX

PROJEXT DESCRIPTION:
This project scope is to connect Meredeth Hall, Zacharias Hall, Preston Center, and PFT Food Court Building (Alternate #1) to the campus wide 12,470 volt electrical distribution system. This includes the excavation for an installation of new concrete encased duct banks, installation of 15kv cables, termination to existing switches and dual tap transformers, and site restoration.

Project Location: Bowling Green, Kentucky

Click Here for More Details

CCK-2124-16 Medical Science Penthouse AHU 1-10 Coil Replacement

CCK-2124-16 Medical Science Penthouse AHU 1-10 Coil Replacement

PROJECT DESCRIPTION:
Furnish labor and materials for the Replacement of AHU coils

Project Location: Lexington, Kentucky

Click Here for More Details