Orchard Grass WWTP Decommissioning Phase 1B 1C

Orchard Grass WWTP Decommissioning Phase 1B 1C

PROJECT DESCRIPTION:
The project generally consists of: The construction of a new 3.9 MGD sanitary pump station, complete with wet well, valve vault, flowmeter vault, emergency pump connection manholes, control building, generator pad, transformer pad and installation of approximately 4,200 feet of 10″ PVC force main with ductile iron fittings, air release valves, connection to an existing force main, rerouting of approximately 165 feet of existing 15″ gravity sewer and 230′ of existing 4″ force main, and all other items shown on the plans and mentioned in the specifications for a complete project, ready for continuous operations.

Project Location: LaGrange, Kentucky

Click Here for More Details

Sims Road Landfill – Removal of Sediment Ponds 1 and 2

Sims Road Landfill – Removal of Sediment Ponds 1 and 2

PROJECT DESCRIPTION
The work primarily consists of the removal of two (2) sediment ponds. The work includes all related excavation, embankment, temporary erosion control, grading, seeding, and other items incidental to the project.

Project Location: Georgetown, Kentucky

Click Here for More Details

RFB-265-16 Abatement of Asbestos Materials Henderson CTC

RFB-265-16 Abatement of Asbestos Materials Henderson CTC

Project Manager Name: Maziar Torabi
Phone: (502) 782-0335
Email: Maziar.Torabi@ky.gov

Estimate: $ 62,235.00
Estimated Length of Project: 35 (Substantial Completion) + 10 (Final Completion)

The Scope of Work for this project is the removal and disposal of asbestos containing materials (ACMs) from designated areas of the Administration Building and the Arts & Sciences Building at Henderson Community College.

Project Location: Henderson, Kentucky

Click Here for More Details

16-94 / Kenwood Area Cured In Place Pipe Project

16-94 / Kenwood Area Cured In Place Pipe Project

Louisville Water Company is requesting Bids for the rehabilitation of the following existing main utilizing cured in place pipe (CIPP): 630 +/- linear feet of 12-inch DI water, 1,570 +/- linear feet of 12-inch CLD water, 1,420 +/- linear feet of 8-inch CLD water, 1,400 +/- linear feet of 6-inch CLD water, 320 +/- linear feet of 6-inch DI water. Also included with the project is the installation of 6 +/- fire hydrants and the transfer, renewal, relocation or discontinue of 116 +/- customer services.

Project Location: Louisville, Kentucky

Click Here for More Details

CCK-2123-16 Sanders Brown Elevator Upgrade

CCK-2123-16 Sanders Brown Elevator Upgrade

PROJECT DESCRIPTION:
Furnish labor and materials for the Elevator Upgrade in Sanders Brown Building.

Project Location: Lexington, Kentucky

Click Here for More Details

MCTC/MSU Postsecondary Center of Excellence – Phase 1

MCTC/MSU Postsecondary Center of Excellence – Phase 1

PROJECT DESCRIPTION:
The new building will be a 2-story building which will contain classrooms, offices, Nursing laboratories and Center for Advanced Manufacturing laboratories. The building has been designed in compliance with the 2013 Kentucky Building Code and according to ADA Standards for Accessible Design. It will also be constructed to the standards of the Division of Engineering and Contract Administration, and Maysville Community and Technical College System. This project has been registered with the US Green Building Council and will attempt to achieve LEED Silver Certification. The building’s occupancy classification is Education per the Kentucky Building Code. The construction type for the building is 2B. Site development associated with the building includes building identification signage and drop off entry plaza.

F. Construction Contract: Individual bid package bids will be received by Trace Creek Construction, Inc. for the following Work:

1. Multiple Individual Bid Package Contracts consisting of the following bid packages:

01 Paving
02 General Trades
03 Masonry
04 Structural Steel
05 Roofing and Insulated Wall Panel System
06 Aluminum Curtain wall, Storefront & Windows
07 Gypsum Board Systems & Acoustical Ceilings
08 Resilient Tile flooring & Carpeting
09 Tile
10 Painting
11 Elevator
12 Mechanical
13 Fire Suppression
14 Electrical

Project Location: Morehead, Kentucky

Click Here for More Details

TARC – NIA Center Customer Service Area Renovations

TARC – NIA Center Customer Service Area Renovations

PROJECT DESCRIPTION:
Furnishing of all labor and materials and the performance of all work required for the: Transit Authority of River City – NIA Center, Customer Service Area Renovations

Project Location: Louisville, Kentucky
Click Here for More Details

RFB-258-16 Group IV LON 16

RFB-258-16 Group IV LON 16

Estimate: $ 64,815.75
Estimated Length of Project: (Substantial Completion) + September 30, 2016 (Final Completion)

The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 10 acres of mine land in Letcher county to do reclamation earthwork, pond removals, install ditches and culverts, apply roadway stone to access road as needed, and revegetation on 1 bond forfeiture permit(s). Please see spec book for full project description

Project Location: Letcher Co, Kentucky

Click Here for More Details

2402.8 UK-1673-16 Pavillion A 11th & 12th Floor Curtain Wall

2402.8 UK-1673-16 Pavillion A 11th & 12th Floor Curtain Wall

TC-075 Curtainwall Upgrades

Project Location: Lexington, Kentucky

Click Here for More Details

Southern Water and Sewer District – Harold Sewer Project Phase 3

Southern Water and Sewer District – Harold Sewer Project Phase 3

PROJECT DESCRIPTION:
This project consists of the providing of all materials, labor, and equipment for the construction of:
A pressure sewer system including HDPE collector sewers, HDPE service line, 96 simplex residential grinder pump stations, and one conventional submersible pump station complete with odor control system.

Project Location: McDowell, Kentucky

Click Here for More Details

Winchester Municipal Utilities – Contract No. 80-Fire Hydrant Painting

Winchester Municipal Utilities – Contract No. 80-Fire Hydrant Painting

PROJECT DESCRIPTION:
Supply of paint, surface preparation, labor and paint coating of approximately 200 Fire Hydrants located throughout the water distribution system

Project Location: Winchester, Kentucky

Click Here for More Details

CCK-2118-16 Taylor Building Window Replacement Phase 2 REBID

CCK-2118-16 Taylor Building Window Replacement Phase 2 REBID

PROJECT DESCRIPTION:
Furnish and install Architectural compliant replacement windows in Taylor Building.

Project Location: Lexington, Kentucky

Click Here for More Details

Hazard High School Renovation Phase 2 BP2

Hazard High School Renovation Phase 2 BP2

PROJECT DESCRIPTION:
The Work includes major demolition of existing portions of the building and a new addition of approximately 10,500 SF. The new building is load bearing masonry and structural steel frame construction on structural concrete slab, grade beam and drilled concrete piers. The renovation portion of the work includes new finishes, casework, doors and hardware, electrical, plumbing and HVAC work.

Project Location: Hazard, Kentucky
Click Here for More Details

Hardin County Schools – Cecilia Valley Elementary School

Hardin County Schools – Cecilia Valley Elementary School

PROJECT DESCRIPTION:
Furnishing of all labor, materials, supplies, tools, services, etc., necessary for:
Cecilia Valley Elementary School
Hardin County, Kentucky
BG 13-017

Project Location: Elizabethtown, Kentucky

Click Here for More Details

CCK-2122-16 Chandler Bridge Replace Glazing REBID

CCK-2122-16 Chandler Bridge Replace Glazing REBID

PROJECT DESCRIPTION:
Furnish labor and materials for the repair of glazing on the Chandler Bridge.

Project Location: Lexington, Kentucky
Click Here for More Details

CCK-2120-16 Control Plant Boiler Installation – 2429.0

CCK-2120-16 Control Plant Boiler Installation – 2429.0

PROJECT DESCRIPTION
Remove two existing boilers and install two new owner furnished boilers. Work will include removal and reinstallation of existing front wall for installation in building, modifications of steel, re-piping of new boilers and startup. Contractor will also

Project Location: Lexington, Kentucky
Click Here for More Details

CCK-2121-16 Civil Site Infrastructure – Landscape Improvement – 2445.0

CCK-2121-16 Civil Site Infrastructure – Landscape Improvement – 2445.0

PROJECT DESCRIPTION:
The Work is located on the University of Kentucky Campus in the Woodland Glen Walkway.
Major work items in this Contract include:

• Removal of existing walkways, landscaping, lighting, and accessories.
• Furnish and install new walkways, seat walls, and retaining walls.
• Furnish and install new landscape materials, all sizes.
• Furnish and install new storm sewers and accessories, all sizes.
• Furnish and install new lighting and accessories.

Project Location: Lexington, Kentucky

Click Here for More Details

Morgan County High School Practice Day Locker Facility

Morgan County High School Practice Day Locker Facility

PROJECT DESCRIPTION:
The project will consist of a facility that contains home and away locker rooms, weight rooms, public restrooms, concessions area, new bleacher system, new turf (alternate bid), and new field lighting. If bidding any of the combination packages, the contractor must also bid the packages individually.

Bids Requested:
Bid Package 010 – Site Work (incl Site Demo, Asphalt Paving, Earthwork, Site Utilities)
Bid Package 030 – General Trades (incl Concrete and Masonry)
Bid Package 090 – Finishes
Bid Package 130 – Press Box & Grandstand Seating
Bid Package 220 – Plumbing
Bid Package 230 – HVAC
Bid Package 230 – Electrical
Bid Package 300 – Combo (BP 010 & 030)
Bid Package 310 – Combo (BP 220 & 230)
Bid Package 320 – Combo (ALL)

Project Location: West Liberty, Kentucky

Click Here for More Details

Salyersville Grinder Pump Replacement Project

Salyersville Grinder Pump Replacement Project

PROJECT DESCRIPTION:
This project consists of:
Contract 1: Furnish 320 grinder pump units and 5,000 LF HDPE pipe for sanitary sewer
Contract 2: Furnish and install two submersible pump units

Project Location: Salyersville, Kentucky

Click Here for More Details

Salyersville Parkway Lift Station Materials Project

Salyersville Parkway Lift Station Materials Project

PROJECT DESCRIPTION:
This project consists of the materials necessary to construct a new Parkway Lift Station.

Project Location: Salyersville, Kentucky

Click Here for More Details

Owen County Middle School / High School Campus Road Improvements

Owen County Middle School / High School Campus Road Improvements

PROJECT DESCRIPTION:
This project scope includes widening of the school access road, repaving and striping.

Project Location: Owenton, Kentucky

Click Here for More Details

Runway Overlay and Edge Light Replacement at Kyle Oakley Field

Murray-Calloway County Airport Board

PROJECT DESCRIPTION:
Furnishing all labor, materials and equipment and performing all work necessary for Runway Overlay and Edge Light Replacement at the Kyle Oakley Field

Project Location: Murray, Kentucky

Click Here for More Details

City of St. Matthews Fire District-Station 2 – Renovations & Addition

City of St. Matthews Fire District-Station 2 – Renovations & Addition

PROJECT DESCRIPTION:
St. Matthews Fire District seeks to expand and renovate their existing Station Two facility on Brownsboro Road. Station Two is approximately 8,100 SF and is sharing space with the Harrods Creek Fire District. The daily living space (approximately 3,900 SF); contains the dining and recreation area, kitchen functions, office, resident living quarters, and other support functions. The renovation will include expand the living quarters to twenty-four beds. Locker room, laundry, toilet and shower facilities, kitchen, dining and lounge space will also be renovated as a result of the increase in beds. The building addition (approximately 3,100 SF) includes a fitness area, office, laundry room, shop and general storage space, as well as a service bay for a pick-up truck. There is a partial second level to the addition which includes storage and future office space.

Project Location: Louisville, Kentucky

Click Here for More Details

RFB-261-16 KSU Repair Boilers and Aging Distribution Lines

RFB-261-16 KSU Repair Boilers and Aging Distribution Lines

Project Manager Name: Marc Avery
Phone: (502) 782-0312
Email: bruce.wilson@ky.gov

Estimate: $7,765,000.00
Estimated Length of Project: Aug. 1, 2017 (Substantial Completion) + Sept. 1, 2017 (Final Completion)

The scope of the project includes replacing the steam piping in approximately 2600 feet of utility tunnels with hot water piping to serve 11 different building heat exchangers. This project will remove the buildings from the central plant, and then connect them into two groups of buildings served by hot water boilers installed at Bell Gym and Blazer Library. Modifications to HVAC, electrical, and plumbing systems at the buildings used for the boilers as well as modifying and replacing some existing equipment at the other buildings will be necessary to support the project. In addition to the primary scope, two bid options have been proposed: (1) Modification of the HVAC units serving the open office (former pool space) at Bell Gym to improve temperature control and energy usage, and (2) Demolition of the existing, non-operational coal boiler at the Jordan Maintenance Building. Phasing for the two groups of boilers will be broken into three phases. Phase 1 will occur during the summer season of 2016 to get hot water to the Group 1 buildings. Group 1 consists of Blazer Library, Hunter Hall, Jackson Hall, Carver Annex, Combs Hall, and McCullen Hall. Work inside Blazer will be planned during an unoccupied portion of the summer with the exception of the existing mechanical rooms and the new boiler room. Building work inside the other Group 1 buildings is limited to the mechanical rooms, and the work will be completed when functioning hot water is brought to the building before October, 2016. Phase 2 will be an interim period of work over the heating season of Fall 2016 to Spring 2017. Tunnel demolition work will occur during this period, and some preparation work at Bell Gym for the Group 2 boiler plant will be done. A similar plan to Phase 1 will be developed for Phase 3 during the second summer (2017) of work for the Group 2 Bell Plant. Group 2 includes Bell Gym, Carver Hall, Hume Hall, Betty White, and Bradford Hall. Bell, Bradford, and Betty White have extensive inside piping work in non-mechanical spaces that will be planned during unoccupied (or lower usage) periods.

Project Location: Frankfort, Kentucky

Click Here for More Details

CCK-2119-16 RGAN Solar Improvements Phase 2

CCK-2119-16 RGAN Solar Improvements Phase 2

PROJECT DESCRIPTION:
Provide 26.16kW roof mounted PV system. System will be provided on each side of existing PV system. PV system will tie into existing electrical branch panel ‘SOLAR’ which was installed during first phase. Connect new inverters to existing SOLRENVIEW monitoring system.

Project Location: Lexington, Kentucky

Click Here for More Details