Southern Madison Water District – US 25/Richmond Road Water Line Relocation
Southern Madison Water District – US 25/Richmond Road Water Line Relocation
PROJECT DESCRIPTION:
This contract consists of relocation of approximately 690 L.F. of 8″ PVC waterline, 740 L.F. of 8″ Ductile Iron waterline, 295 L.F. of 8″ H.D.P.E. waterline, installing new master meter station, and all appurtenances. The engineer’s estimate is $239,000.
Middlesboro High School – New Baseball and Softball Press Boxes
Middlesboro High School – New Baseball and Softball Press Boxes
Please Note: Addendum 1 has changed the Bid Time
PROJECT DESCRIPTION: Project consists of (2) two-story press boxes on the existing
Middlesboro High School site; including one for baseball and one for softball. The
press boxes shall be masonry and wood stud construction with wood trusses and
metal roof. Will include one new restroom and (2) concession stands, including
rough-in for equipment.
Construction Contract: Bids will be received for the following Work:
1. Bid Packages
Bid Package 1 – General Trades Masonry – work in this package shall include
concrete footings, all site excavation associated with the new work, masonry wall
construction including all associated accessories, wood stud framing and all
associated accessories/attachments; wood trusses; all associated sheathing for
both wall and floor construction; doors and frames; door hardware; hollow metal
window frames including all necessary attachments and grout.
Bid Package 2 – Metal Wall/Roof Panels – work in this package shall include
metal wall panels and all necessary attachments and closure pieces. Also
included in this package is the metal roof system including all necessary sheathing,
insulation, roofing accessories, flashing and trim.
Bid Package 3 – Mechanical/Plumbing – work in this package shall include all
work associated with plumbing and mechanical systems in the project. This shall
include all piping, ducts, fixtures, diffusers, and rough-in.
Bid Package 4 – Electrical – work in this package shall include all work
associated with the electrical system in the project. This shall include all lighting,
power wiring, receptacles, panels, and rough-in.
CCK-2151-17 Taylor Education Building – Roof, Dormer and Gutter Renovation
CCK-2151-17 Taylor Education Building – Roof, Dormer and Gutter Renovation
PROJECT DESCRIPTION:
This project is to renovate and restore the following elements to renewed condition. It will include all specified work associated with the following:
Repair of the slate roofing system
Renovation of dormers
Re-lining of gutters and water table systems
Repair of soffits and such wooden elements
Project includes an Add Alternate to renovate the cupola/Tower
CALL 300 CONTRACT ID 161247 HENDERSON COUNTY FD04 SPP 051 0041 019-021 : BI-STATE VIETNAM GOLD STAR MEMORIAL BRIDGES (US 41) BRIDGE NAVIGATION LIGHTING ON THE US 41 BRIDGES OVER THE OHIO RIVER LIGHTING. SYP NO. 02-04900.00.
CALL 301 CONTRACT ID 161244 JEFFERSON COUNTY FD04 SPP 056 0031 000-001 : CLARK MEMORIAL BRIDGE (US 31) NAVIGATION LIGHTING ON CLARK MEMORIAL BRIDGE IN JEFFERSON COUNTY (US 31) LIGHTING. SYP NO. 05-04900.00.
CALL 302 CONTRACT ID 161246 MASON COUNTY FD39 SC 081 0062 017-019 : SIMON KENTON MEMORIAL BRIDGE (US 62) (MP 17.527) REPAIR/REPLACE DECORATIVE LIGHTING ON THE SIMON KENTON MEMORIAL BRIDGE IN MAYSVILLE (MP 18.021), A DISTANCE OF 0.50 MILES. LIGHTING. SYP NO. 09-01096.00.
CALL 102 CONTRACT ID 161245 JEFFERSON COUNTY NHPP IM 2653 (039) : I-265 INTERCHANGE AT OLD HENRY ROAD (KY 3084) REDUCE CONGESTION AND IMPROVE SAFETY AT THE KY 3084 (OLD HENRY ROAD) INTERCHANGE, A DISTANCE OF 0.82 MILES. JPC PAVEMENT WITH GRADE & DRAIN. SYP NO. 05-00474.00.
CALL 101 CONTRACT ID 161237 CLAY COUNTY STP BRZ 1103 (307) : BEECH CREEK ROAD (CR 1004) (MP 0.144) REPLACE BRIDGE ON BEECH CREEK RD (CR 1004) OVER GOOSE CREEK AT INTERSECTION WITH CHANDLER BRANCH RD (CR 1003) (MP 0.184), A DISTANCE OF 0.17 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 11-01091.00.
CALL 105 CONTRACT ID 161037 MONROE COUNTY STP BRZ 0303(282) : NEW SALEM ROAD(CR-1354) REPLACE BRIDGE ON NEW SALEM ROAD(CR-1354) OVER PETER CREEK 0.2 MILE EAST OF BETHLEHEM CHURCH ROAD(CR-1335). BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 03-01084.00.
CALL 107 CONTRACT ID 161036 PIKE COUNTY NHPP 0806(045) : PIKEVILLE-VIRGINIA STATE LINE ROAD(US-460) ASPHALT PAVEMENT SURFACING FROM BEAVER CREEK NEAR FLAT FORK TO BEAVER CREEK NEAR KY-1373. ASPHALT SURFACE WITH GUARDRAIL. SYP NO. 12-00263.89.
CALL 100 CONTRACT ID 161035 CLAY COUNTY STP BRO 4211 (039) : RICHMOND ROAD(US-421) REPLACE BRIDGE ON US-421 OVER ISLAND CREEK AT INTERSECTION OF US-421 AND BOWLING BRANCH ROAD(CR-1346). GRADE & DRAIN WITH BRIDGE. SYP NO. 11-01088.00.
PROJECT DESCRIPTION:
The project is generally described as the Northern Kentucky University, Health Innovation Center
(HIC) Founders Hall Renovation. The project is located in Highland Heights, Kentucky, on
approximately 3.0 acre site on the NKU campus, east of Kenton Drive, west of Nunn Hall and directly
north of Griffin Hall. The project will include the construction of the new Health Innovation Center
(HIC) building and renovation of the existing Founders Hall Building. The HIC building will consist of a
new 107,000 sf five-story steel frame building. The Founders Hall renovation is a 106,000 sf
complete interior gut and renovation of the existing 5 story concrete-structured building.
PROJECT DESCRIPTION: New construction of a 2 story 12,550 s.f. Data Center and for an 11,400 s.f. renovation construction of the 8th Floor Elliot Building for 15
beds
The projects will be bid in the following manner:
Bid for the Data Center
Bid for the 8th Floor Elliot
Bid that combines the Data Center and the 8th Floor Elliot
PROJECT DESCRIPTION:
New construction of a 2 story 12,550 s.f. Data Center and for an 11,400 s.f. renovation construction of the 8th Floor Elliot Building for 15
beds
The projects will be bid in the following manner:
Bid for the Data Center
Bid for the 8th Floor Elliot
Bid that combines the Data Center and the 8th Floor Elliot
Estimate: $ 95,865.00
Estimated Length of Project: (Substantial Completion) + 90 Calendar Days (Final Completion)
The site is located in Clay County, Kentucky. It is just beyond the northern right of way of US 421 in the Shephardstown community at coordinates N 37* 17’ 12”, W 83* 51’ 58.86”. The project will consist of “lump sum” site prep and “lump sum” demolition and disposal of an old “wooden structure” tipple facility, plus a small block scale house and another frame structure. Please see spec book for full project description.
The location of this project is 5 Highway 455, Sparta, Kentucky 41086.This project is for the construction of a package duplex grinder pump station, control panel, and 380 linear feet of 2 inch PVC force main. This proposed system connects the existing State Highway Maintenance Facility to an existing gravity sewer manhole by means of a bore under KY Highway 35.
Estimate: $ 55,000.00
Estimated Length of Project: (Substantial Completion) + 60 Calendar Days (Final Completion)
The Tina Smith Portals AML Reclamation Project includes the closure of six underground mine openings. Five of the openings will receive “bat-friendly” wildlife accessibleclosures, and one will receive a non-wildlife accessible closure. Accessing the portals forclosure will require the installation and removal of four temporary low-water stream crossings.Total project disturbance will be no greater than 0.75 acre. Revegetation will be via the standard AML General Reclamation Seed Mixture.
City of Hyden – 2015 Safe Routes to Schools Maple Street Sidewalk Project
City of Hyden – 2015 Safe Routes to Schools Maple Street Sidewalk Project
PROJECT DESCRIPTION:
The Project includes but is not limited to the following: 2016 Safe Routes to Schools Sidewalks Project
a.) 900 SY 48- Concrete Sidewalk
b.) 200 LF 18″ Corrugated Metal Drainage Pipe
c.) 2 EA Drop box inlet with frame and Lid
d.) 200 LF 6~ Concrete Curb
e.) 1 LS Painting and Striping