Uncategorized

Mt. Sterling Water and Sewer System – Maysville Avenue Tipton Street & Jackson Place Water Line Project

Mt. Sterling Water and Sewer System – Maysville Avenue Tipton Street & Jackson Place Water Line Project

PROJECT DESCRIPTION:
This project consists of approximately 920 linear feet of 6″ water main services
along with related accessories.

Project Location: Mt Sterling, Kentucky

More Details

Richmond Utilities Board – Motel 6 Lift Station Replacement

Richmond Utilities Board – Motel 6 Lift Station Replacement

PROJECT DESCRIPTION:
The work to be bid is described as follows:
Furnish and installation of a suction lift pump station rated at 200 gpm at 53-
feet of total dynamic head.

Project Location: Richmond, Kentucky

More Details

Winchester Municipal Utilities – Hampton Manor Sanitary Sewer Improvements Project

Winchester Municipal Utilities – Hampton Manor Sanitary Sewer Improvements Project

PROJECT DESCRIPTION:
The project scope includes construction of 3,158 linear feet of 24-inch gravity sewer line, 153 linear feet of 8- and 12-inch gravity sewer, 322 linear feet of boring 42-inch encasement pipe, and appurtenances.

Project Location: Winchester, Kentucky

More Details

Portland CSO Basin

Portland CSO Basin


Addendum 2 has changed the Bid Date!

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty Street, Louisville, Kentucky 40203 for the construction of Portland CSO Basin Contract No. 15,688, Budget ID No. H09125, Drawing Record No. 15,688, Sheet No. 1-121, will be received at the office of MSD until 10:00 AM, Local Time, Thursday March 2, 2017, and will be publicly opened and read at that place and time.

Description and location of Project: Construction of a 6.7 Million Gallon (MG) below grade circular concrete storage basin with a central flushing system and associated electrical, mechanical, instrumentation and control systems. Site work will include the construction of a control building, access road/parking area, security fencing and landscaping.

All work shall be done in accordance to MSD’s Standard Specifications.

There will be a non-mandatory pre-bid meeting held for this project. The non-mandatory pre-bid meeting will be held at the Main Office Building, 700 West Liberty Street at 10:00 A.M. Local Time, Tuesday February 7, 2017. A site visit will be held immediately following the pre-bid meeting.

The Engineer’s Construction Cost Estimate for this project is between $ 40,000,000.00 to $ 50,000,000.00 .

The bid documents will be available on, Monday January 30, 2017, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.
Persons wishing to view the bid documents may do so online at www.msdbids.com or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.
The Project Manager for this Invitation to Bid is Jacob L. Mathis, P.E.. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Project Manager, Jacob Mathis E-mail: jacob.mathis@louisvillemsd.org. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, Angela Akridge, P.E.

IF THE ENGINEER’S CONSTRUCTION COST ESTIMATE IS $50,000 OR MORE, the Minority Business Enterprise and Woman Business Enterprise (MBE/WBE) participation goals shall be applicable to all contracts and comply with MSD’s Interim Supplier Diversity Policy and Guidelines (Interim Policy). The Interim Policy is considered as one of the elements of responsiveness in a bid. Bidders must subcontract at least 15.0% of the total amount of the Contract Bid price to a certified MBE and 6.0% to a certified WBE, or if the Contractor is unable to meet the goals, must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the Interim Policy. – (see MSD Construction Related MBE/WBE Documents and Forms at http://www.msdlouky.org/insidemsd/diverse ). Each bidder is responsible for careful review of the Interim Policy requirements contained in the bid documents. Failure to comply with the Interim Policy may be grounds for rejection of the bid as non-responsive.

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Project Manager, Jacob L. Mathis, P.E.

MSD Interim Supplier Diversity Policy and Guidelines for this project is as follows:

15% MBE and 6% WBE participation is required for this project.

PREVAILING WAGE CONTRACT: No

LOCAL LABOR PREFERENCE: Yes

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

Angela Akridge, P.E.
Chief Engineer

Rene’ Thomas
Director of Procurement & Supplier Diversity
MSD Procurement Department

Project Location: Louisville, Kentucky

More Details

CCK-2194-17 Sanders Brown Fire Pump Replacement

CCK-2194-17 Sanders Brown Fire Pump Replacement

PROJECT DESCRIPTION:
This project is to replace the Fire Pump in the Sanders Brown Building

Project Location: Lexington, Kentucky

More Details

Southern Water & Sewer District – Contract 3 – Water Treatment Plant Improvements

Southern Water & Sewer District – Contract 3 – Water Treatment Plant Improvements

PROJECT DESCRIPTION:
Construction of Contract 3 – Water Treatment Plant Improvements
including new grit removal system, replacement of one (1) raw water pump, one (1) high service
pump, one (backwash pump), replacement of tube setter system for two (2) sedimentation basins,
piping, electrical and all related appurtenances

Project Location: McDowell, Kentucky

More Details

Town of Clarksville – Ettel Lane Extension Through Gateway Crossing Development

Town of Clarksville – Ettel Lane Extension Through Gateway Crossing Development

PROJECT DESCRIPTION:
This project includes construction of approximately 1,100 feet of new roadway, curb, storm sewers, utility conduit, sidewalk, landscaping, lighting, traffic signal and all other
items necessary for construction of a complete project.

Project Location: Clarksville, Indiana

More Details

Berea Municipal Utilities – Walnut Meadow – Sanitary Sewer Rehabilitation Project

Berea Municipal Utilities – Walnut Meadow – Sanitary Sewer Rehabilitation Project

PROJECT DESCRIPTION:
The work to be bid is described as follows:
Sanitary sewer rehabilitation by means of trenchless technologies and related proven techniques, as described in the specifications, at the collection system locations shown on the project map. Approximately 8,361 LF of sewer line and 30 manholes are included in the scope of this sanitary sewer rehabilitation project. The bids will include all provisions of the project including all associated work necessary to provide a finished product that meets the requirements set forth in the Contract Documents.

Project Location: Berea, Kentucky

More Details

RFB-164-17 Ashland Career Center HVAC Replacement

RFB-164-17 Ashland Career Center HVAC Replacement

Project Manager Name: David
Boggess
Phone: (502) 782-0313
Email: David.Boggess@ky.gov

Estimate:
$264,200.00
Estimated Length of Project:
133 (Substantial Completion) + 30 (Final Completion)

The Ashland Career Center HVAC Replacement is an HVAC renovation to replace the existing Central Air Handling Units and remote condenser with new HVAC equipment and Controls. The existing HW coil in the AHU is served by an existing gas fired boiler located in the basement. The two AHUs and Boiler will be demolished. All of the existing hydronic piping, pumps, expansion tanks, and valves will be demolished. With no exterior door directly to basement, the access to basement is limited. The new AHU for first floor will be located on first floor storage room space for easier access and maintainability. The new HVAC system will consists of two new Split System Air Handling Units and new Direct Digital Controls. Each AHU will have a base furnace module, a cooling coil module and also a Mixing box with full size dampers for Economizer mode. The DX cooling coil will each have their own Condenser located on existing concrete pad outside of Mechanical room. The condenser units will provide 3 stages of cooling capacity. All of the equipment will be DDC and tied into a new Building Automation System. The points will be integrated into the BAS with graphics and sequences.

Project Location: Ashland

More Details

Blue Grass Airport – Integrated Operations & Coordination Center – Dispatch Console Replacement

Blue Grass Airport – Integrated Operations & Coordination Center – Dispatch Console Replacement

PROJECT DESCRIPTION:
Consisting of removal of the current dispatch console and
installation of a new dispatch console and associated components

Project Location: Lexington, Kentucky

More Details

RFB-163-17 FILO Goose Creek Stream Restoration

RFB-163-17 FILO Goose Creek Stream Restoration

Project Manager Name: Josh Morgan
Phone: (502) 564-3155
Email: josh.morgan@ky.gov

Estimate:
$2,195,273.00
Estimated Length of Project:
360 (Substantial Completion) + 60 (Final Completion)

The proposed work consists of the restoration and enhancement, using Natural Channel Design techniques, of approximately 15,680 linear feet of existing stream including Goose Creek and five (5) unnamed tributaries (Tributaries A, B, C, and D).
Tasks to be performed include installing construction access roads, reshaping of existing channels; re-establishment of new channels with stable dimensions; construction of in-stream structures; installation of bio-engineered bank protections, preparation of soil for seeding; native seeding and pasture seeding; installation of erosion control fabric and mulch; installing, and maintaining live stake and vegetative materials, installation of woven wire fence, installation of barbed wire fence, repairs of barbed wire fencing, removal of portions of existing fencing, installation of gates and cattle guards, installation of low water crossing, installation of culverts, wetland enhancement, pasture clearing and repairing driveway upon demobilization of the site.

Project Location: Dunnville

More Details

LFUCG – West Hickman Waste Water Treatment Plant – Zone 2 Aeration Improvements

LFUCG – West Hickman Waste Water Treatment Plant – Zone 2 Aeration Improvements

Please Note: Addendum 2 has changed the Bid Date

PROJECT DESCRIPITON:
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for West Hickman WWTP Zone 2
Aeration Improvements. The works includes demolition of all PVC aeration grid system in 6 aeration tanks and replacement with new; electrical demolition and reconfiguration; and air piping expansion joints replacement.

Project Location: Lexington, Kentucky

More Details

Barren County Schools – Career & Technical Education Building – Athletic Field Replacement- Phase 2

Barren County Schools – Career & Technical Education Building – Athletic Field Replacement- Phase 2

Addendum 4 has rebid the project.

The following Bids are requested:
BID PACKAGE 015 – Demolition and Earthwork
BID PACKAGE 020 – Asphalt Paving
BID PACKAGE 028 – Chain Link Fences and Gates
BID PACKAGE 029 – Polyresign Track Surface
BID PACKAGE 031 – Concrete and General Trades
BID PACKAGE 032 – Synthetic Turf System
BID PACKAGE 040 – Masonry
BID PACKAGE 050 – Structural Steel and Miscellaneous Steel
BID PACKAGE 064 – Interior Architectural Woodwork
BID PACKAGE 075 – Thermoplastic Membrane Roofing and Metal Roofing
BID PACKAGE 080 – Steel Doors, Frames, Flush Wood Doors and Finish Hardware
BID PACKAGE 084 – Aluminum Entrances and Storefronts, Aluminum Windows and Glazing
BID PACKAGE 092 – Gypsum Board Assemblies and EIFS
BID PACKAGE 093 – Ceramic Tile
BID PACKAGE 095 – Acoustical Panel Ceilings
BID PACKAGE 096 – Resilient Tile Flooring and Carpet Tile
BID PACKAGE 099 – Painting and Joint Sealants
BID PACKAGE 100 – Miscellaneous Specialties
BID PACKAGE 105 – Metal Lockers
BID PACKAGE 114 – Food Service Equipment
BID PACKAGE 127 – Grandstand Seating System
BID PACKAGE 150 – Plumbing and HVAC
BID PACKAGE 155 – Fire Protection
BID PACKAGE 160 – Electrical and Systems
BID PACKAGE 170 – Communications

Project Location: Glasgow, Kentucky

More Details

Baptist Health Floyd – Pain Management Addition & Renovation

Baptist Health Floyd – Pain Management Addition & Renovation

*Accepting Bids from Subcontractors & Suppliers ONLY*

PROJECT DESCRIPTION:
Construction of the Pain Management Addition & Renovation at Baptist Health Floyd located at 1850 State
Street in New Albany, Indiana.

Project Location: New Albany, Indiana

More Details

Baptist Health Floyd – Endoscopy Renovations

Baptist Health Floyd – Endoscopy Renovations

*Accepting Bids from Subcontractors & Suppliers ONLY*

PROJECT DESCRIPTION:
Construction of the Endoscopy Renovation at Baptist Health Floyd located at 1850 State
Street in New Albany, Indiana.

Project Location: New Albany, Indiana

More Details

LFUCG – Bluegrass Regional Transfer Station – Pump Station Improvements

LFUCG – Bluegrass Regional Transfer Station – Pump Station Improvements

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items for the Bluegrass
Regional Transfer Station Pump Station Improvements, Lexington-Fayette County,
Kentucky.

Project Location: Lexington, Kentucky

More Details

5103 Red Oak Lane Drainage Improvement Project

5103 Red Oak Lane Drainage Improvement Project

PROJECT DESCRIPTION:
This unit based construction order is for a paved ditch drainage system along the easement in the rear yards of the 5100 block of Red Oak Lane, in Metro Council District 2.

Project Location: Louisville, Kentucky

More Details

Blue Grass Airport – Phase II Westside Hangars

Blue Grass Airport – Phase II Westside Hangars

Please Note: Addendum 3 has changed the Bid Date

PROJECT DESCRIPTION:
The scope of work, at a minimum, will include all work required for the two hangar buildings and
all site development, providing overall management, temporary facilities, final Architectural
design, Civil, Landscape, MEP design, permitting, comprehensive construction services, PEMB
erection, site infrastructure installation, project closeout and startup. The goal will be to deliver a
project, in compliance with the aforementioned Westside Architectural Design
Guidelines/Schematic Design documents, that is fully functional for all users, including the
Owner and end users of the facilities.

Project Location: Lexington, Kentucky

More Details

CCK-2193-17 Construct, Expand, & Renovate Ambulatory Care Facility – 2433.0

CCK-2193-17 Construct, Expand, & Renovate Ambulatory Care Facility – 2433.0

Please Note: Addendum 04 has changed the Bid Date

PROJECT DESCRIPTION:
Project shall be bid to single prime General Contractor and consists of renovation and refresh of approximately 10,400 SF of existing interior ambulatory care space located on the first floor of the Kentucky Clinic. The project is considered a major renovation, with approximately 80 percent of interior partitions removed for new layout and nearly all interior finishes, fixtures and hardware being updated. New plumbing, HVAC, systems piping and electric branch systems shall be installed, utilizing existing mains. Construction shall be sequenced to accommodate pre-phasing areas prior to full demolition to maximize Owner access to existing operational Physical Therapy and X-Ray functions.

The project includes two (2) Alternates:
ALTERNATE #1: FAN ARRAY
If accepted by the Owner, contractor shall schedule this work in a normal and acceptable sequence to ensure that the AHUs are fully operational with little or no downtime to the Owner. All sequencing and duration of work will be clearly communicated to and approved by the Owner prior to beginning any of the work in this alternate.

ALTERNATE #2 – Redundant VFDs
If accepted by the Owner, contractor shall schedule this work in a normal and acceptable sequence to ensure that the AHUs are fully operational with little or no downtime to the Owner. All sequencing and duration of work will be clearly communicated to and approved by the Owner prior to beginning any of the work in this alternate.

Project Location: Lexington, Kentucky

More Details

RFB-162-17 LLCC Segregation Unit Security Upgrade

RFB-162-17 LLCC Segregation Unit Security Upgrade

Project Manager Name: David
Guffey
Phone: (502) 782-0353
Email: David.Guffey@ky.gov

Estimate:
$188,750.00
Estimated Length of Project:
180 (Substantial Completion) + 15 (Final Completion)

The work consists of: Upgrades of the existing security control system to a mouse driven Graphical User Interface (GUI) computer workstation and Programmable Logic Controller (PLC) based security control system. The system will include interface with existing lighting control relays and analog CCTV system. The system will include new control console (millwork), new locking control system, new digital intercom/paging system and interface with the same and new lighting control interposing relay interface. Three control workstations will be provided, two in the Restrictive Housing Unit control room and one in Tower 11A. The work will result in a fully operational security control system including all demolition, materials, installation, testing, training and warranty as provided in the contract documents.

Project Location: LaGrange

More Details

RFB-157-17 Neil Ratliff AML

RFB-157-17 Neil Ratliff AML

Estimate:
$ 53,000.00
Estimated Length of Project:
(Substantial Completion) + 60 Calendar Days (Final Completion)

The Neil Ratliff AML Reclamation Project, approximately 1 acre total, is located in the Broad Bottom Quad, Pike County at coordinates N 37° 31’ 12”, W 82° 33’ 23.4”. Driving directions to the site are as follows: from the route 80/23 intersection in Prestonsburg, take Route 23 South for approximately 17.6 miles. Ratliff Branch is on the other side of a concrete road barrier and is only accessible from the north bound lane. Go to the red light near Kentucky Power, and make a U-turn. Drive back less than 0.1 mile to Ratliff Branch Road on the right. Go 0.3 mile to 364 Ratliff Branch Road. The residence is on the left.
There is an eligible mine pond approximately 150 feet above the residence. Drainage from the pond is more than the spillway pipe can handle causing runoff to erode the hillside and rut out the landowner’s driveway. The road side ditch along the driveway has silted up and water ponds in their yard. AML plans to remove the dam, draining the pond slowly, and then grade the dam material into the pond allowing for positive drainage. The drainage pipes in the yard and crossing the road will be replaced. All waste material will be used onsite to remove the pond.
Construction disturbances will be kept to a minimum through the use of a stringently formulated sediment and erosion control program. Silt Barrier – Bales & Fence, rock checks and a gabion weir will be installed and maintained at all disturbed areas. Agricultural Limestone is included to ensure water quality of the pond. All disturbed areas will be promptly re-vegetated at the end of construction. Traffic Control is included to advise motorist of the reclamation work. Trees over 3” in diameter at breast height will require removal to access the pond.
Access to the site is via the county road and an existing access route void of vegetation. This project will include pre- and/or post- project maintenance and repair of existing previously constructed public county roads utilized during the construction of this project, which are administered by the county or local road authority. This construction activity will be conducted under the authority and supervision of the local public road authority and will consist of standard road construction practices appropriate to mitigate impacts to the local community from potential degraded road conditions in order to maintain public traffic safety.

Project Location: Pike

More Details

RFB-161-17 MCTC Welding Program Upgrade

RFB-161-17 MCTC Welding Program Upgrade

Project Manager Name: David
Boggess
Phone: (502) 782-0313
Email: David.Boggess@ky.gov

Estimate:
$378,000.00
Estimated Length of Project:
102 (Substantial Completion) + 30 (Final Completion)

Project consists of installation of masonry welding booths, exhaust system ductwork and extraction arms, filtration equipment, and distributed compressed gas piping systems for new welding program. A storage area will be upgraded to include four new welding gas regulator stations with gas cylinder storage area. Project also includes installation of UV protective window film shops interior and exterior windows. Most work will be in an existing shop that will require minor demolition of compressed gas and electrical to make way for the new work.

Project Location: Maysville

More Details

RFB-156-17 Re-Ad of RFB-122-17 Mona Baker II

RFB-156-17 Re-Ad of RFB-122-17 Mona Baker II

Estimate:
$260,482.50
Estimated Length of Project:
(Substantial Completion) + 180 Calendar Days (Final Completion)

The proposed Mona Baker II AML project (approximately 13.4 acres within the project limit, of which only a portion is expected to be disturbed) consists of regarding a slide area which has broken out below a drive that is upslope from the Baker residence. An existing pipe across the gravel drive will be removed and drainage improved by constructing a hoe ram ditch which will take water into a new pipe, with headwalls, put in place to replace a rusted existing pipe. Existing subdrain behind the upslope residence will be extended into the hoe-ram ditch. Gabion flat bottom ditch will be placed below the pipe outlet, and a gabion weir will be constructed below the outlet before water enters the existing concrete drain. Work below this level will consist of cleaning out existing drainage structures. Site preparation is intended to include the clean out of some existing ditches and traps.
Additional work upslope will include closing one (1) portal and constructing a concrete block tied-mat ditch to take drainage into the existing drain (to be cleaned out).
An additional six (6) portals will also be closed in an area further upslope. Combination Rock Ditch-Drain will be constructed, and a drop box will be constructed where necessary to maintain positive drainage. Pipe will take water from the drop box into an excavated rock ditch/concrete block tied-mat ditch into existing drainage. A temporary silt trap type B is anticipated in this drain.
To reach the project from I-75 at the London/Manchester exit, turn left onto KY 80/Russell Dyche Memorial Highway, which will become the Hal Rogers Parkway and continue for 44 miles. Take a slight right toward Hyden, and proceed for approximately 3.5 miles to a left onto KY 421/KY 80. Proceed for approximately 0.5 mile to Main Street/KY 421 and travel a short distance to Oak Street on the right, just beyond Frontier Nursing Services. Travel up Oak Street to the site at 37° 09’ 38” N; 83° 22’ 23” W.
Additional work to be included under the Mona Baker II project will be at the Frontier Nursing School, located nearby at 195 School Street. To reach the college from The Baker site (Oak Street), turn left onto Hwy. 421 and proceed a few tenths of a mile to a left onto Hickory Lane and continue to a switchback on the right onto School Street. The site is located approximately 37° 09’ 57.6” N; 83° 22’ 45.1” W. There is a total of 1.6 acres within the project limit, but it is assumed that less than one acre will in fact be disturbed. Work at the Frontier Nursing School will consist of regarding approximately one acre of slide, and adding a variety of ditches as well as subdrain to reduce saturation problems which have added to slope instability. In addition, seven (7) test borings will be drilled as indicated in the planview.
To reach the waste area, from Hyden, take Hwy. 421 (Main Street) south for about ½ mile and turn left onto Hwy. 80. Continue about 1 ¼ mile to the waste area on the right at N 37° 08’ 56.2”, W 83° 21’ 13.4”. Material is to be placed as directed by the Engineer, and none is to be placed closer than 10 feet to the top of the bank. Silt barrier is to be installed prior to placing any fill.
Materials resulting from any tree cutting are not to be placed in the waste area, but are to be chipped on site or otherwise disposed of per the property owner’s wishes. Additional roadway stone is included to maintain access to the waste area.
Utility relocation and replacement, landscape allowance, dense grade aggregate and roadway stone are included as may be needed.
A sediment and erosion control program, consisting of such measures as hay bales, silt fences, and prompt re-vegetation will be implemented on all areas disturbed by this project. All items related to erosion control must be properly installed and well maintained throughout the length of the project.

Project Location: Leslie

More Details

RFB-155-17 WSH Electrical Upgrades Phase I

RFB-155-17 WSH Electrical Upgrades Phase I

Project Manager Name: Brian
Cottongim
Phone: (502) 782-0317
Email: Brian.Cottongim@ky.gov

Estimate:
$ 4,013,869.00
Estimated Length of Project:
540 (Substantial Completion) + 60 (Final Completion)

The overhead electric and communication distribution systems serving the Western State Hospital
will be removed and replaced with underground systems consisting of manholes, duct-lines, and padmounted
transformers. Building electric services will be replaced with underground services. An
Electrical Services Building will be constructed at the Central Utility Plant and include
switchboards, panelboards, and distribution equipment; Patient Care Buildings will be served from
the Electrical Services Building. A generator will be installed at Building 20 to furnish backup upon
loss of normal power. Electric consumption will be monitored by a Central Monitoring System
included in the Electrical Services Building.
The Project will include the following add alternate bids –
a. Add Alternate #1. Repave the main drive between Building 20 and Building 63.
b. Add Alternate #2. Extend underground electric and communications services from the Campus
systems to Building 78/79.

Project Location: Hopkinsville

More Details

GMWSS Sanitary Sewer Rehabilitation – Fairfax Way & Whigg Court

GMWSS Sanitary Sewer Rehabilitation – Fairfax Way & Whigg Court

PROJECT DESCRIPTION:
The work to be bid is described as follows:
Sanitary sewer rehabilitation by means of fold and form or cured-in-place sewer
rehabilitation technologies. Approximately 1,989 L.F. of 8-inch to 1O-inch sanitary sewer rehabilitation. The bids will include all provisions of the Project, including all
associated work necessary to provide a finished product that meets the requirements
set forth in the Contract Documents.

Project Location: Georgetown, Kentucky

More Details

Subscribe