Hwy 1882 & Hwy 144 Water Transmission Main Replacement
Hwy 1882 & Hwy 144 Water Transmission Main Replacement
PROJECT DESCRIPTION:
The Project consists of constructing 8,050 linear feet (LF) of 16-inch ductile
iron water line, 1,280 LF of 6-inch PVC water line, and all associated valves, services, and
appurtenances.
Estimate:
$252,081.00 Estimated Length of Project:
(Substantial Completion) + 120 Calendar Days (Final Completion)
The project is located on KY30, 2.6 miles west of Jackson at the Department of Juvenile Justice Breathitt County facility. The project is the result of a slide located between the two buildings and an open portal. The slide has taken out a portion of an access road. Also, some of the cracks and breaks from the unstable area are located above a greenhouse.
The project area is 3.48 acres and the construction area is 2.50 acres. The project consists of construction of a non-reinforced concrete block wall- type II, drainage controls, and a wildlife accessible portal closure. Silt control measures at the site shall be a silt fence, installed and remaining in effect until construction is completed at the site. No trees will be cut as part of this project.
Drainage controls for these sites shall consist variously of Class II/III ditches, ECB ditch, Class II/No. 2 Stone backfill, Subdrains etc. Bituminous repair, including roadway stone, has been factored into the contract. Revegetation of the site, including agricultural limestone, fertilizer, mulch and seed will be done according to standard AML design specifications.
PROJECT DESCRIPTION:
North Fork Valley Community Health Center’s (NFV) Health Infrastructure Investment Program (HIIP) project proposes to provide many needed repairs and upgrades to the now forty-two-year-old facility that is home to the June Buchanan Medical Clinic (JBMC) site. Reconfiguration of the patient registration and pharmacy areas will provide much needed improvements to patient flow and compliance with the Americans with Disabilities Act (ADA). Conversion of space will create two new exam rooms and upgrades to the flooring will be installed in the entire facility to replace the old and worn vinyl flooring currently installed. Restrooms will be renovated to provide better accessibility to patients and compliance with the ADA as well. Also in the interest of patient accessibility, the entry way doors will be removed and replaced with automatic open and close doors. Safety and security upgrades are also planned with the installation of a new security system to provide monitoring of activities both inside and outside of the clinic and the installation of a new sprinkler system. Upgrades to the exterior include EIFS trim to the building façade. Lastly, the roof which has experienced leaking issues will be replaced with a new Thermoplastic polyolefin roof.
The scope of this project is to repair the cast in place concrete and the precast concrete elements that are supporting the guard rails. The guard rails are required to be cutoff and reinstalled. Over drill the existing core holes to remove embedded portion of the guard rails. Remove any loose, partially spalled or delaminated pieces of the cast in place concrete or the precast panels and patch these areas. Epoxy pressure inject any remaining cracks in the concrete or precast elements. The guard rails are then to be reset. Replace the failed expansion joint.
There is one alternate in the project which is clean out and reseal the joints between the precast and the cast in place concrete.
Work of the Project includes replacement of certain HVAC equipment serving areas of the CPTU Building at the Kentucky State Reformatory located at 3001 West Hwy 146, LaGrange, Oldham County, Kentucky. Demolition of existing HVAC systems (by Owner). Installation of packaged air cooled chiller, cooling coils and piping. Modifications to existing air handling systems. Installation of temperature control systems. Electrical wiring of HVAC equipment.
PROJECT DESCRIPTION: Consisting of the construction and/or furnishing of items for the Government
Center Parking Garage Repairs, 200 E Main St, Lexington-Fayette County, Kentucky.
The project includes the construction of a 1,500+/- square foot patio picnic shelter next to the existing Paddock
Café concessions building. The proposed structure is an open air type building with stone veneer columns on a
concrete slab. The roof is constructed of pre- engineered wood trusses on LVL beams spanning the columns.
The work includes limited site work, excavation, concrete footings, masonry foundation walls, stone veneer
columns and wood framed roof system. The electrical lighting and power systems are rough-in only. The exterior
finishes include cement panel board and batten ceiling and asphalt shingles with cement panel soffits and trim.
LFUCG – LFD Facilities Maintenance Building Phase II
LFUCG – LFD Facilities Maintenance Building Phase II
PROJECT DESCRIPTION: Consisting or the construction and/or furnishing of items for the LFD Facilities
Maintenance Building Phase II, 221 E Second Street. Lexington-Fayette County, Kentucky
PROJECT DESCRIPTION:
CALL 300 CONTRACT ID 171005 JOHNSON COUNTY FD51 058 1559 002-003 : SITKA-STAMBAUGH ROAD(KY-1559) EMERGENCY BRIDGE REPLACEMENT ON KY-1559 OVER TOM’S CREEK NEAR STAMBAUGH. BRIDGE REPLACEMENT. SYP NO. 12-0000.00.
PROJECT DESCRIPTION:
CALL 106 CONTRACT ID 171002 PERRY COUNTY HSIP 0805(026) : JUSTICE DRIVE(CR-1863) INTERSECTION IMPROVEMENTS AT KY-80 AND JUSTICE DRIVE(CR-1863) INTERSECTION AT HAZARD, KENTUCKY IN PERRY COUNTY. ASPHALT REHAB WITH GRADE & DRAIN. SYP NO. 10-00925.00.
PROJECT DESCRIPTION:
CALL 105 CONTRACT ID 171003 LIVINGSTON COUNTY STP BRZ 0103(374) : CUTOFF ROAD(KY-937) REPLACE EXISTING BRIDGE LOCATED ON KY-937 MP 0.872 JUST EAST OF US-60. BRIDGE REPLACEMENT. SYP NO. 01-01162.00.
PROJECT DESCRIPTION:
CALL 104 CONTRACT ID 171201 MAGOFFIN COUNTY STP BRO 5353 (008) : LICK CREEK ROAD (KY 2019) (MP 5.497) REPLACE BRIDGE ON KY 2019 OVER RACCOON CREEK 0.039 OF KY 1081 (MP 5.537), A DISTANCE OF 0.18 MILES. GRADE, DRAIN & SURFACE WITH BRIDGE. SYP NO. 10-01099.00.
PROJECT DESCRIPTION:
CALL 103 CONTRACT ID 171006 JEFFERSON COUNTY STP BRO 8800(008) : EASTERN PARKWAY(US-60A) REPLACE BRIDGE ON EASTERN PARKWAY(US-60A) OVER SOUTH FORK OF BEARGRASS CREEK 0.2 MILE NORTHEAST OF POPLAR LEVEL ROAD(KY-864). BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 05-01064.00
PROJECT DESCRIPTION:
CALL 100 CONTRACT ID 171001 FRANKLIN COUNTY STP 4201(085) : BALD KNOB ROAD(US-421) REPLACE BRIDGE ON US-421 OVER FLAT CREEK. CULVERT REPLACEMENT. SYP NO. 05-01083.00.
LFUCG – Construction Services for Jacobson Park Sprayground & Masterson Station Park Sprayground
LFUCG – Construction Services for Jacobson Park Sprayground & Masterson Station Park Sprayground
Please Note: Addendum 3 has changed the Bid Date
PROJECT DESCRIPTION: Consisting of the construction and/or furnishing of items for the Jacobson Park
Sprayground & Masterson Station Park Sprayground, Lexington-Fayette County, Kentucky.
Housing Authority of Danville – Roof Siding & Demolition Work
Housing Authority of Danville – Roof Siding & Demolition Work
PROJECT DESCRIPTION:
Work will include the following:
HOUSING AUTHORITY OF DANVILLE – CFP 501-16
ROOF, SIDING, AND DEMOLITION WORK
AMP 101 – BURCKLEY HOMES KY 14-09
AMP 201 – McINTYRE CIRCLE KY 14-01
Estimate:
$129,210.00 Estimated Length of Project:
(Substantial Completion) + 60 Calendar Days (Final Completion)
This project will address drainage problems caused by drainage from the coal seam behind the property located at N37.58426º, W82.25032°. The site is adjacent to the Jessica Hackney Drainage AMLRP.
Install an 18” RCP culvert under the county road and concrete headwall into the stream bank. Bed the RCP in flowable fill and install the concrete headwall recessed into the stream bank and below the existing grade. On the upstream end, install a concrete dropbox. There is a gas line running along the county road. Place the concrete dropbox between the gas line and the county road if possible. From the concrete dropbox back to the hillside, install a perforated subdrain ending in a plastic dropbox. Geo-grid and filter fabric are included to construct a temporary access to the backyard. Across the backyard, construct a combination ECB ditch and subdrain tied together at the plastic dropbox. Excavate the wet muck along the hillside behind the subdrain. Excavate and attempt to open a reported closed and covered mine entry. Install subdrain into the entry area (regardless if open or collapsed) and backfill with class II. Tie the portal drainage into the backyard subdrain via a plastic dropbox. Construct a 2:1 gabion wall and backfill with class II. Set the gabions on a class II backfill and bi-axial geo-grid pad.
The project waste area is the former Johnny Coleman project waste area along US 119. The earthwork bid item includes equipment necessary to transport and spread the material at the waste area. Use haybales prior to onsite disturbance to establish silt control. Landscape allowance, utility relocation/repair, and structure removal/replacement allowances are included for disturbance to items pre-approved by the ENGINEER.
City of Marion – West Carlisle Street Sanitary Sewer Improvements
City of Marion – West Carlisle Street Sanitary Sewer Improvements
PROJECT DESCRIPTION: The primary scope of work includes the installation of approximately 800 LF of 8-inch PVC gravity sewer, 7 sanitary sewer manholes, approximately 270 square yards of bituminous
pavement replacement, and related appurtenances.
LFD Hose Shop & Vehicle Storage Pre-Fabricated Building
LFD Hose Shop & Vehicle Storage Pre-Fabricated Building
PROJECT DESCRIPTION: Consisting of the construction and/or furnishing of items for the LFD Hose Shop
and Vehicle Storage Pre-Fabricated Building, 1128 Finney Drive, Lexington-Fayette
County, Kentucky