Hardin County Water District #1 – Knox Street Water Improvements Project
Hardin County Water District #1 – Knox Street Water Improvements Project
Project Location: Fort Knox, Kentucky
Hardin County Water District #1 – Knox Street Water Improvements Project
Project Location: Fort Knox, Kentucky
Kentucky Center for African-American Heritage – Building Improvements – 180064
PROJECT DESCRIPTION:
This project consist primarily of interior improvements such as acoustical treatments, finishes, audio system, lighting, HVAC & control modifications for a 1- story building “A” & Pavilion “P”.
Proposed use is for Public Gatherings and events such as meetings, dinners, receptions, art displays and ceremonies.
Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire.
Sealed Proposals must be uploaded,
submitted, and finalized prior to the closing at 11/3/17 3:00pm. The bid document and drawings
are available on Bonfire and Lynn Imaging, all other forms, documents and attachments are available
on (https://louisvilleky.bonfirehub.com/portal).
Project Location: Louisville, Kentucky
Kentucky Transportation Cabinet
CALL 100 CONTRACT ID 171245 ROCKCASTLE COUNTY NHPP IM 0752 (095) : I-75 (ROCKCASTLE COUNTY) (MP 60.100) TENNESSEE STATE LINE – LEXINGTON; WIDEN I-75 TO 6 LANES FROM 1.1 MILES N US 25 INTERCHANGE AT MT. VERNON N TO 1.85 MILES N GREEN HILL ROAD OVERPASS (MP 64.500), A DISTANCE OF 4.42 MILES. ASPHALT REHAB INTERSTATE/PARKWAY. SYP NO. 08-00006.20.
PROJECT LOCATION: Rockcastle County, Kentucky
Kentucky Transportation Cabinet
CALL 101 CONTRACT ID 171244 NELSON COUNTY STP 1501 (116) : BARDSTOWN – SPRINGFIELD ROAD (US 150) (MP 1.697) WIDEN US 150 INCLUDING BRIDGE RECONSTRUCTION BETWEEN THE INTERCHANGE RAMPS AT THE BLUEGRASS PARKWAY (MP 2.285), A DISTANCE OF 0.18 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 04-08309.11.
PROJECT LOCATION: Nelson County, Kentucky
Kentucky Transportation Cabinet
CALL 302 CONTRACT ID 171029 MORGAN COUNTY FD04 SPP 088 0007 003-004 : WEST LIBERTY-SANDY HOOK ROAD(KY-7) IMPROVE SAFETY ON KY-7 BY ELIMINATING ROCK OVERHANG AND ADDING SHOULDERS 1000 FT. SOUTH OF KY-1161 TO 1000 FT. NORTH OF KY-1161., A DISTANCE OF 0.72 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 10-00160.00.
PROJECT LOCATION: Morgan County, Kentucky
Kentucky Transportation Cabinet
CALL 103 CONTRACT ID 171242 GRANT COUNTY STP 5206 (010) : JONESVILLE ROAD (KY 36) (MP 13.700) ROADWAY IMPROVEMENTS AT KY 36 FROM US 25 AT WILLIAMSTOWN TO APPROXIMATELY 1 MILE EAST OF HEEKIN CLARKS ROAD (MP 14.761), A DISTANCE OF 2.90 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 06-00411.00.
PROJECT LOCATION: Grant County, Kentucky
Kentucky Transportation Cabinet
CALL 105 CONTRACT ID 171243 LESLIE COUNTY STP BRO 5271 (044) : HYDEN – WOOTON ROAD (KY 80) (MP 5.142) REPLACE BRIDGE ON KY 80 OVER CUTSHIN CREEK AT INTERSECTION WITH BUSY HOLLOW DRIVE (CR 1063) (MP 5.182), A DISTANCE OF 0.22 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 11-01089.00.
PROJECT LOCATION: Leslie County, Kentucky
Kentucky Transportation Cabinet
CALL 106 CONTRACT ID 171038 JEFFERSON COUNTY STP BRZ 0503 (248) : FAIRMOUNT ROAD (CR-1004N) / CEDAR CREEK BRIDGE DEMOLITION ON FAIRMOUNT ROAD (CR-1004N) OVER CEDAR CREEK 0.2 MILE WEST OF FARMERS WAY., A DISTANCE OF 0.10 MILES. BRIDGE DEMOLITION. SYP NO. 05-01068.00.
PROJECT LOCATION: Jefferson County, Kentucky
Kentucky Transportation Cabinet
CALL 107 CONTRACT ID 171247 TRIMBLE COUNTY STP BRZ 0503 (253) : CONNECTOR ROAD (KY 2871) (MP 0.228) REPLACE BRIDGE OVER LITTLE KENTUCKY RIVER ON KY 2871 150 NW OF KY 1335 (MP 0.268), A DISTANCE OF 0.08 MILES. BRIDGE REPLACEMENT. SYP NO. 05-01075.00.
PROJECT LOCATION: Trimble County, Kentucky
Kentucky Transportation Cabinet
CALL 108 CONTRACT ID 171249 LARUE COUNTY STP BRZ 0611 (070) : GREENSBURG ROAD (KY 61) (MP 1.471) REPLACE BRIDGE OVER SOUTH FORK BRANCH OF KY 61 0.5 MILE NORTH OF KY 1906 (MP 1.523), A DISTANCE OF 0.05 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 04-01087.00.
PROJECT LOCATION: Larue County, Kentucky
Kentucky Transportation Cabinet
CALL 109 CONTRACT ID 171039 LAWRENCE COUNTY STP BRZ 1203(406) : MATTIE ROAD(CR-1202) REPLACE BRIDGE ON MATTIE ROAD(CR-1202) OVER RIGHT FORK OF LITTLE BLAIN 0.38 MILE WEST OF ASH BRANCH ROAD(CR-1161)., A DISTANCE OF 0.10 MILES. GRADE, DRAIN & SURFACE WITH BRIDGE. SYP NO. 12-01118.00.
PROJECT LOCATION: Lawrence County, Kentucky
Kentucky Transportation Cabinet
CALL 111 CONTRACT ID 171043 BOONE COUNTY STPM 5138 (066) : US-42 AT RICE PIKE INTERSECTION IMPROVEMENT PROJECT AT US-42 AND RICE PIKE/HICKS PIKE, US-42 MP 8.4 TO MP 8.6., A DISTANCE OF 0.70 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 06-00412.00.
PROJECT LOCATION: Boone County, Kentucky
Kentucky Transportation Cabinet
CALL 300 CONTRACT ID 171040 ALLEN COUNTY FD04 SPP 002 0098 003-005 : BROWNSFORD ROAD(KY-98) IMPROVE THE SAFETY OF KY-98 NEAR DURHAM SPRINGS ROAD., A DISTANCE OF 1.40 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 03-00201.00.
PROJECT LOCATION: Allen County, Kentucky
Kentucky Transportation Cabinet
CALL 301 CONTRACT ID 171250 MARSHALL COUNTY FD04 SPP 079 0348 007-009 : SYMSONIA ROAD / 5TH STREET (KY 348) (MP 7.620) WIDEN KY 348 TO 4 LANES BETWEEN PURCHASE PARKWAY AND US 641 (MP 8.783), A DISTANCE OF 1.75 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 01-08002.00.
PROJECT LOCATION: Marshall County, Kentucky
Kentucky Transportation Cabinet
CALL 302 CONTRACT ID 171029 MORGAN COUNTY FD04 SPP 088 0007 003-004 : WEST LIBERTY-SANDY HOOK ROAD(KY-7) IMPROVE SAFETY ON KY-7 BY ELIMINATING ROCK OVERHANG AND ADDING SHOULDERS 1000 FT. SOUTH OF KY-1161 TO 1000 FT. NORTH OF KY-1161., A DISTANCE OF 0.72 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 10-00160.00.
PROJECT LOCATION: Morgan County, Kentucky
1906 Goldsmith Lane Drainage Improvement Project
Description and location of Project: This unit base construction order is for a 15-inch pipe and drain installation within the property of 1906 Goldsmith Lane in Metro Council District 10.
Project Location: Louisville, Kentucky
RFB-92-18 Lake Cumberland Convention Center Structural Repairs
Project Manager Name: Carl Kratzer
Phone: (502) 564-3155
Email: carl.kratzer@ky.gov
Estimate:
$185,000.00
Estimated Length of Project:
60 (Substantial Completion) + 15 (Final Completion)
The structural repair project is comprised of the following work.
1. Remove and replace (2) existing pedestrian bridges with new bridges similar in construction. Provide shoring for bridges, existing convention center roofs, wall, etc. as necessary to complete work.
2. Repair vertical surface of existing concrete bridge headwall.
3. Construct new bridge support columns with spread footings.
4. Install new bridge handrails.
5. Repair existing steel cantilever bridge support beams at convention center.
6. Repair existing convention center masonry associated with bridge replacements.
7. Replace building entrance finishes within convention center associated with bridge replacements.
8. Apply pedestrian traffic waterproofing membrane and sealants on bridges.
9. Install expansion joints.
Project Location: Jamestown
Housing Authority of Versailles – 16 & 17
PROJECT DESCRIPTION:
The work to be performed consists of:
A. Construct storage buildings
1. Split face concrete block
2. Metal roofing
B. Asphalt paving and seal coat
C. Concrete sidewalks
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned
or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.
Project Location: Versailles, Kentucky
LFUCG – West Hickman 7 Contract No. 2 – Pump Station and Wet Weather Storage Tank
Please Note: Addendum 2 has changed the Bid Date
PROJECT DESCRIPTION:
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for the construction of the West Hickman 7 (WH7) Wet Weather Storage Facilities
improvements: Contract No. 2 – Pump Station and Wet Weather Storage Tank. The project
includes but is not limited to a LFUCG Class A pumping station with mechanical screening, screenings compactor, four (4) submersible sewage pumps, two (2) sump pumps, diversion
structure, building with screening room, dumpster room, odor control room, electrical room and emergency generator all on the Wet Weather Pump Station site. On the Wet Weather Storage
Tank site there will be a 5.0 MGD storage tank, flow control structure, mixing pump station, building with odor control room, chemical feed room, blower room, electrical room and emergency generator.
Project Location: Lexington, Kentucky
City of Russell Springs – KY 76 Waterline Relocation
PROJECT DESCRIPTION:
This contract consists of relocating approximately 150 L.F. of
6″ and 1,240 L.F. of 4″ PVC, SDR-17 and appurtenances.
The Engineer’s
Estimate is $42,000.
Project Location: Russell Springs, Kentucky
CCK-2259-18 Boone Center Window Renovation Replacement
PROJECT DESCRIPTION:
The objective of this project is to replace the deteriorating wood elements of the 46 transom windows
installed as part of the façade design of the Boone Center. The work includes, but is not necessarily
limited to:
a. Removal of each transom window
b. Removal of excess paint buildup on the existing transom window-framing
c. Replacing all damaged/deteriorating window framing
d. Recoating the windows prior to re-installation
e. Satisfactory and acceptable re-installation of the units
Project Location: Lexington, Kentucky
Harrison County Parks Board – Indian Creek Trail
PROJECT DESCRIPTION:
Bid Package 2017-01
Rehabilitation and Relocation of Harrison County Bridge #58 and Extension of Indian Creek Trail
Project Location: Corydon, Indiana
City of Jeffersontown – Veterans Memorial Park – Phase 1
Please Note: Addendum 02 has changed the Bid Date
PROJECT DESCRIPTION:
The project consists of construction of Veterans Memorial Park located between Ruckriegel Parkway, Taylorsville
Road, and Chenoweth Run in Jeffersontown, KY 40299.
The work to be performed and the bid to be submitted shall include sufficient and proper sums for the
construction, waste management, and disposal, labor, materials, permits, licenses, insurance, and so forth
incidental to and required for the park construction project.
Project Location: Jeffersontown, Kentucky
Lyndon Lakes Place Drainage Improvement Project
Description and location of Project: This unit base construction order is for the dual 24-inch pipe, and 18-inch pipe along Lyndon Lakes Place in Metro Council District 18.
Project Location: Louisville, Kentucky
5201 Downs Court Pipe Replacement Project
Description and location of Project: This unit base construction order is for the 24″ x 38″ pipe, and paved ditch installation along north property line of 5201 Downs Court located in Metro Council District 12.
Project Location: Louisville, Kentucky