Replacement of 358 residential grinder pumps and related appurtenances in Fleming-Neon, KY.
Bids are requested for the following Contract: Sanitary Sewer Restoration Project – Grinder Pump
Replacement Contract
Replacement of brush aerators, various pumps, various valves, filter components, electrical
components, and associated appurtenances at the Fleming-Neon, KY wastewater treatment plant.
The scope of this project includes the replacement of five (5) split system air handlers. Ductwork will be cleaned and mostly reused except for what is required for connection to the new HVAC equipment. Also included in this project is, an upgrade to the electrical infrastructure and lighting of the building. A new main distribution panel will be provided and all panelboards and motor control center will be replaced. All lighting fixtures will be replaced with LED fixtures in accordance with Illuminating Engineering Society of North America (IESNA) Handbook, IESNA Recommended Practices, etc.
This invitation is for lighting upgrades in the Ravine as specified in the following bid at Eastern Kentucky University’s
Richmond, KY Campus. The work includes furnishing all labor, materials, equipment and services necessary to complete
the project outlined in the event and attachments including all items indicated throughout the event.
Work will begin immediately following an official Award of Contract and Purchase Order from Eastern Kentucky
University. A point of contact for EKU Project Management will be provided to the awarded vendor at time of award.
This project will include the improvements needed to building systems on the UK HealthCare
Chandler campus. The building systems improvements will include the following: Replacement of
air handler “OP1,” which services the second-floor operating rooms in the Chandler Medical Center
Hospital (Pavilion H). The existing air handler has exceeded its useful life and needs replacement.
The project will also add a modular air-cooled chiller to achieve lower operating room temperatures
and include a new, dedicated reverse osmosis water system and new unit controls that will tie into
the existing building automation system.
UK-3184.0-1-26 Construction Management Services for Construct West End Zone Suites RFP
UK-3184.0-1-26 Construction Management Services for Construct West End Zone Suites RFP
This project is for the design phase of enhancements to Kroger Field:
West End Zone Field Club. This space is envisioned to be an approximately 3,000 square foot interior club space with adjacent, exterior patio space. Revisions to the seating bowl and aisles
will be required. The interior space will include premium seating, restrooms, and limited food
service.
Back of seating bowl overbuild. Addition of terrace seats in the lower, west end zone corners to provide an enhanced seating experience.
Scoreboard patio clubs. Patio improvements below the scoreboards to provide a new seating area for loge-style seating with new restrooms and food service.
The Project includes the reconstruction of a portion of Taxiway B between Taxiway B3 and Taxiway B4. The
project includes PCC pavement, asphalt shoulders, new airfield lighting, and drainage improvements.
The project will re-grade, repave, and re-stripe the existing South Campus. New curbing and landscaping is to be provided to provide aesthetic upgrades to the site. The parking layouts are to be revised to provide additional parking capacity and additional ADA compliant spaces. ADA upgrades to site curbs and walkways are incorporated to the new design.
The existing electric and telecommunications utilities are to be relocated from overhead lines to underground. Existing parking lot pole mounted lighting is to be replaced with new.
The project consists of HVAC upgrades in Building #1 at Somerset Community College South Campus. HVAC scope includes demolition of existing aging HVAC systems and installation of new VAV RTU systems, boilers, pumps, ventilations systems, and HVAC Controls. Also included in the project is replacement of existing ceilings and lighting systems and modifications to fire alarm and sprinkler systems.
Mercer County Board of Education – Mercer County Athletic Improvements – Phase 2
Mercer County Board of Education – Mercer County Athletic Improvements – Phase 2
The Mercer County Athletic Improvements – Phase 2 project will be for a new artificial turf field with track at
Mercer County Senior High School, which will include earthwork, subdrainage, athletic equipment, new
Concessions/Restroom building (2,445 sq ft) and a new Athletics Building (5,611 sq ft) which will both be load
bearing masonry structure with brick veneer, pre-engineered wood trusses, and shingle roofing; new Tennis courts,
and new parking lot. Major systems include Mechanical, Plumbing, and Electrical.
Floyd County Board of Education – Floyd County Athletics – Betsy Layne Synthetic Turf Replacement
Floyd County Board of Education – Floyd County Athletics – Betsy Layne Synthetic Turf Replacement
Project scope occurs at the Betsy Layne High School. Work includes site
improvements for the replacement of the existing synthetic turf football field with a new synthetic
football field system. New football equipment including field goals, wall pads, and associated field
equipment are included.
26-195 Hardin County Water District No. 2 – Hardin County Fire Station Sanitary Sewer Extension
26-195 Hardin County Water District No. 2 – Hardin County Fire Station Sanitary Sewer Extension
Installation of approximately 1,000 L.F. of 8” SDR 26 PVC pipe, including 180 L.F. of restrained-joint pipe,
two 4’ diameter manholes (0′-5′ depth), two 4’ diameter manholes (10′-15′ depth), 125 L.F. of bored
encasement for 8” PVC carrier pipe in 20” steel casing, one core and seal connection to an existing
manhole, and all necessary appurtenances.
RFP-26-011 Bluegrass CTC Construct Prison Education Program
RFP-26-011 Bluegrass CTC Construct Prison Education Program
Project Description:
The Kentucky Community and Technical College System, Office for Facilities Support Services, on behalf
of Bluegrass Community & Technical College (BCTC) desires to procure professional architectural led
services and associated project engineering team to accomplish the “Construct Prison Education
Program Building” at the Northpoint Training Center in Danville, Kentucky.
KCTCS/ BCTC is partnering with the Kentucky Department of Corrections (DOC) to build a national model
prison education program to reduce recidivism, accelerate workforce development and increase savings
to the society. The proposal builds upon KCTCS’s current work in 14 state prisons and several county
jails. Preliminary programs were selected based on feedback from employers that hire formerly
incarcerated individuals.
The project is contingent on funding from the Kentucky General Assembly that is expected to be
available on July 1, 2026. If funding is not made available by legislation, the project will be cancelled.
While the selection of the Design Team and Construction Manager / General Contractor will be
completed prior to the July 1 date, contract execution and the commencement of design and preconstruction work will not occur until that date. The Design Team’s work is expected to begin on July 1,
2026, and the pre-construction work of the Construction Manager / General Contractor will start before
or near the conclusion of Phase A design work – Mid-July 2026.
Responsible Vendors who have proper experience and qualifications are invited to submit
RFB-237-26 Re-Ad of RFB-176-26 EEC-AML-23117AMLBAML
RFB-237-26 Re-Ad of RFB-176-26 EEC-AML-23117AMLBAML
Estimated Length of Project:
(Substantial Completion) + 180 Calendar Days (Final Completion)
There is a significant amount of water that is draining from the mine bench causing problems (small slides, mold, drainage, etc.) the proposed plans is to control the water and get it into Frozen creek which is across the road. Access to the bench will be via the gravel driveway down the road from the residence, used to access another residence at the bench level. At this residence, there is drainage from behind the driveway from an old closed portal which is saturating the area and flowing along the driveway. Water has also caused a small slip on the hill adjacent to the drive. This material will be removed and a rock toe buttress installed to stabilize the hill above the road. Approximately 600LF of ditchline will be installed along this drive and up to the portal. Drainage controls will be installed on the bench and at the house level. A small block wall will be installed behind one home to stabilize a small slide and handle drainage.
Anchorage Independent School – Anchorage Independent School Misc – Roof Replacement
Anchorage Independent School – Anchorage Independent School Misc – Roof Replacement
Base Bid includes all labor and materials to install new modified bitumen roof over existing roof as marked. Provide new metal gutter, new roof access hatch, walk pads, and metal flashing as noted. Provide labor and materials to remove, store, and reinstall terra-cotta tile roof system.
Mountain Comprehensive Health Corporation – Hazard Medical Clinic Renovation
Mountain Comprehensive Health Corporation – Hazard Medical Clinic Renovation
Work to include, but not limited to:
Interior finishes, casework, new doors,
Electric, Plumbing, HVAC, Fire Alarm, Metal Stud Framing, Gypsum Sheathing and Acoustical
Ceilings.
Lincoln County Fiscal Court – Lincoln County Judicial Center Exterior Envelop Renovation
Lincoln County Fiscal Court – Lincoln County Judicial Center Exterior Envelop Renovation
1. Mold abatement, areas to be cleaned with solution.
2. Clean areas of carpet.
3. Repair and paint areas of drywall.
4. Repair / replace areas of vinyl and wood base cleaned of mold.
5. Portion of wall paneling to be repaired and refinished.
6. Portion of ceiling tiles and grid to be removed and replaced.
7. Demo exterior masonry, windows, doors and sheathing down to existing metal stud.
8. Remove and replace all exterior masonry and precast (precast can be reused at GC option).
9. Clean precast if reused and seal all exterior masonry and precast.
10. Remove and replace with new all exterior doors, windows and louvers.
11. Remove and replace portion of metal coping at roof.
Whitley County Board of Education – Whitley County High School Athletics Improvements – Phase 3
Whitley County Board of Education – Whitley County High School Athletics Improvements – Phase 3
This project is the renovation of the existing 6 tennis courts at Whitley County
High School. Scope includes asphalt, tennis court coating, tennis court equipment, concrete,
earthwork, storm, and fencing.
The project includes demolition of the existing lift station and construction of a new lift station with electrical improvements, construction of approximately 180-feet of gravity sewer and construction of approximately 1,430-feet of forcemain.
This invitation is for renovation in the Whitlock building 1st floor area as specified in the following bid at Eastern
Kentucky University’s Richmond Campus. The work includes furnishing all labor, materials, equipment and
services necessary for the complete renovation including all items as indicated throughout the attached event
specifications.
West Washington School District – WWTP Replacement
West Washington School District – WWTP Replacement
The demolition of two (2) existing package wastewater treatment plants (WWTP),
installation one (1) new package WWTP with a fence, gate, and gravel access drive,
installation of approximately 560 linear feet of 8-inch PVC gravity main sewer pipe, and
maintenance of flow, in addition to all equipment and services required to complete this
work.