RFB-166-18 KRA – Renovation of Kentucky River Lock & Dam #10

RFB-166-18 KRA – Renovation of Kentucky River Lock & Dam #10

Project Manager Name: Frank Phillips
Phone: (502) 782-0331
Email:
frank.phillips@ky.gov


Estimate:
$23,090,000.00
Estimated Length of Project:
944 (Substantial Completion) + 30 (Final Completion)

The Work shall include construction of eight 56.4 ft. diameters, concrete-filled, steel sheet pile cellular structures, and connecting arc cells. The steel sheet pile cellular structures shall be constructed along a baseline running parallel to the existing Lock and Dam No. 10, and located approximately 72.2 ft. upstream of the existing Main Dam and 222.0 ft. upstream of the existing Auxiliary Dam. The Work will also consist of site preparation, erosion control, water control with fluctuating river levels, east and west abutment tie-ins, lock wall tie-ins, concrete bulkhead wall construction across the upper lock approach, water conveyance system installation, removal of existing lock miter gates, slope construction and protection, access road improvements, selective demolition, dredging, earthwork (cut/fill) operations, site grading and restoration, tree planting, and vegetation seeding.
The west abutment features include slope regrading upstream and downstream of the new Auxiliary Dam, construction of a sheet pile cellular structure (Cell 1), an earth retaining sheet pile cutoff wall, access road improvements, and earthwork and regrading. Part of the work is on Kentucky Department of Parks’ property, which is adjacent to the subject property. As such, the OWNER has secured agreements to allow certain construction activities and permanent features on the property.
East abutment features include slope reshaping upstream and downstream of the new Main Dam, construction of a rectangular East Closure Cell, a sheet pile cellular structure (Cell 8), and a sheet pile cutoff wall.
Modifications to the upper lock approach consist of constructing an extension to the existing lock needle dam sill (including rock anchors for stability), installation of a stop log dewatering system, and a new concrete bulkhead wall with a sluice gate water conveyance system.
Demolition Work shall include full or partial demolition of the following existing structures: Auxiliary Dam, West Abutment features, Upper Guide Wall, Upper Guard Wall, Upper and Lower Lock Wingwall. The CONTRACTOR may use the area within the Work Limits shown on the Drawings for laydown, equipment storage, personnel parking, and construction activities. However, activities must adhere to the requirements within the Drawings and Specifications, and certain activities may be restricted. The CONTRACTOR shall refer to the SPECIAL CONDITIONS for access requirements. The CONTRACTOR shall maintain access to Lock and Dam No. 10 throughout construction and is responsible for repair of any damage due to CONTRACTOR activities on roads leading to the project site. It is assumed that work on the east side of the river can be performed with access only from the river. Should the CONTRACTOR desire access via land on the east side of the river, agreements for such provisions with other stakeholders are the responsibility of the CONTRACTOR.
The CONTRACTOR’S Work shall include site safety, maintenance of local traffic, water control, site security, and site cleanup.
The estimated quantities for the Work are listed on the Drawings, and are estimates only. This list is not intended to be exhaustive, but is a general list of significant aspects of the Work. The CONTRACTOR shall be solely responsible for performing its own quantity computations for bidding and construction purposes.
The OWNER has secured the land to the west of the west abutment for on-site fill placement. As such, the designed capacity of the fill placement area was developed to accommodate a significant amount of the estimated quantity of dredged, demolished, and/or excavated material during construction. It is the CONTRACTOR’S responsibility to perform its own quantity computations and identify and secure off-site disposal area(s) if needed. Certain materials are not acceptable for placement within the fill area. In particular, trash, timber cribbing debris, lead paint, or other deleterious materials will not be allowed in the fill area and shall be disposed off-site in an approved location suitable for such materials.

Project Location: Madison

More Details

Repair 24 Inch Brick Sewer at 416 W. Muhammad Ali Blvd

Repair 24 Inch Brick Sewer at 416 W. Muhammad Ali Blvd

Description and location of Project: Replace approximately 45 LF of brick sewer with 21″SDR18 PVC Pipe and all appurtenances located at 416 W. Muhammad Ali Blvd.

Project Location: Louisville, Kentucky

More Details

City of Monticello – South Main Streetscape Phase 1

City of Monticello – South Main Streetscape Phase 1

PROJECT DESCRIPTION:
Construction of approximately 1,500 square feet of concrete sidewalk and 610 square feet of brick pavers to replace existing sidewalk and asphalt surface. Install approximately 220 l.F. of curb and gutter and 160 L.F. of header curb. Install approximately 365 L.F. of 1·1/4 inch electric conduit and 8 light pole bases and
fixtures.

Project Location: Monticello, Kentucky

More Details

Arbor Youth Services – Rehabilitation and Mechanical System Upgrades

Arbor Youth Services – Rehabilitation and Mechanical System Upgrades

PROJECT DESCRIPTION:
Arbor Youth Services, as a recipient of Community Development Block Grant project (CDGB) funded through the Lexington-Fayette Urban County Government, is seeking bids for two separate projects for their buildings at 536 & 540 W Third Street, Lexington KY 40508.

#1: Rehabilitation and Building Improvements
Pre-Bid Time: 1:30 PM EST
Bid Time: 3:30 PM EST

#2: Installation of New HVAC System
Pre-Bid Time: 1:00 PM EST
Bid Time: 3:00 PM EST

Project Location: Lexington, Kentucky

More Details

CCK-2290-18 Good Samaritan Hospital AHU #24 & #54 – 2462.0

CCK-2290-18 Good Samaritan Hospital AHU #24 & #54 – 2462.0

PROJECT DESCRIPTION:
Project consists of combining existing AHU-23 and AHU-24 into a single unit and replacing
AHU-54 with a new unit in the existing penthouse on top of A-wing for Good Samaritan
Hospital.

Project Location: Lexington, Kentucky

More Details

West Laurel Water Association – KY 312 Waterline Relocation

West Laurel Water Association – KY 312 Waterline Relocation


Please note: Addendum 1 has changed the Bid Date!

PROJECT DESCRIPTION
This contract consists of replacing a total of approximately
1,060 feet of 10-inch water line at two (2) lengths and appurtenances such as,
gate valves, blow-off assemblies, etc.

The engineer’s estimate is $71,000.

Project Location: London, Kentucky

More Details

RFB-165-18 DOW – Scenic Lake Dam Modifications John James Audubon State Park

RFB-165-18 DOW – Scenic Lake Dam Modifications John James Audubon State Park

Project Manager Name: Frank Phillips
Phone: (502) 782-0331
Email:
frank.phillips@ky.gov


Estimate:
$1,500,830.00
Estimated Length of Project:
105 (Substantial Completion) + 30 (Final Completion)

The project consists of the following main activities:
1) Demolition of existing concrete and other structures; 2) Site preparation/clearing and working platform construction; 3) Construction of Deep Mixing Method (DMM) zone; 4) Pre- and post-construction DMM testing and verification; 5) Stockpiling of spoil materials; 6) Erosion protection and sediment control; 7) Reservoir control; 8) Construction of temporary trapezoidal channel for spillway overflow until Phase II work commences

Project Location: Henderson

More Details

Salyersville Water Works – Salyersville Water Tank Project

Salyersville Water Works – Salyersville Water Tank Project

PROJECT DESCRIPTION:
This project consists of the providing of all materials, labor, and equipment for the construction of one 500,000
gallon water storage tank.

Project Location: Salyersville, Kentucky

More Details

181005 Union Co. Call 200

Kentucky Transportation Cabinet

CALL 200 CONTRACT ID 181005 UNION COUNTY 113GR18D005-STP BRO MORGANFIELD-SMITH MILLS ROAD(KY-359) UNION COUNTY STP BRO 5050(008) : MORGANFIELD-SMITH MILLS ROAD(KY-359) REPLACE BRIDGE ON KY-359 (MP 1.193) OVER SINKING CREEK 1.1 MILE NORTHEAST OF JCT US-60, A DISTANCE OF 0.17 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 02-01074.00. UNION COUNTY STP BRO 5050(009) : MORGANFIELD-SMITH MILLS ROAD(KY-359) REPLACE BRIDGE ON KY-359(MP 0.971) OVER LOST CREEK 0.95 MILE NORTHEAST OF JCT US-60, A DISTANCE OF 0.13 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 02-01073.00.

Project Location: Union County, Kentucky

More Details

CCK-2289-18 Erikson Hall Room 007 Renovation

CCK-2289-18 Erikson Hall Room 007 Renovation

PROJECT DESCRIPTION:
This project renovates room 7 for use as classroom space. Improvements will include new flooring, paint, doors and hardware, HVAC and lighting upgrades and installation of AV components.

Project Location: Lexington, Kentucky

More Details

LFUCG – Black and Williams Neighborhood Center Window Replacement REBID

LFUCG – Black and Williams Neighborhood Center Window Replacement REBID

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items for the Black and
Williams Neighborhood Center Window Replacement Reissued, Lexington-Fayette County,
Kentucky.

Project Location: Lexington, Kentucky

More Details

Vendor Qualifications – Kentucky Center for African-American Heritage Building Improvements-180151

Vendor Qualifications – Kentucky Center for African-American Heritage Building Improvements-180151

PROJECT DESCRIPTION:
Through this RFQ the Louisville Metro Government is now accepting qualifications from vendors for the
Kentucky Center for African American Heritage Building Improvement project. An RFP will be broadcast
to the vendors qualified through this RFQ.

Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire.

Sealed Proposals must be uploaded,
submitted, and finalized prior to the closing at 2/19/2018 3:00pm. The bid document and drawings
are available on Bonfire and Lynn Imaging, all other forms, documents and attachments are available
on (https://louisvilleky.bonfirehub.com/portal).

Project Location: Louisville, Kentucky

More Details

Frankfort Sewer Department – Rolling Acres Sanitary Sewer Rehabilitation Phase 2

Frankfort Sewer Department – Rolling Acres Sanitary Sewer Rehabilitation Phase 2

PROJECT DESCRIPTION:
The Work includes approximately 7,820 feet of cured-in-place pipe installed in existing 8-inch vitrified
clay pipe, approximately 6,020 feet of open excavation replacement of 8-inch sewer pipe,
approximately 9 open excavation repairs of existing 8-inch vitrified clay pipe, and rehabilitation of
approximately 43 manholes.

Project Location: Frankfort, Kentucky

More Details

RFB-164-18 KCTCS – JCTC Advanced Manufacturing Center Phase 1.5 Traffic

RFB-164-18 KCTCS – JCTC Advanced Manufacturing Center Phase 1.5 Traffic

Project Manager Name: Anne Saint-Aignan
Phone: (502) 782-0337
Email:anne.saintaignan@ky.gov

Estimate:
$ 81,000.00
Estimated Length of Project:
30 (Substantial Completion) + 14 (Final Completion)

The Work of the Project is defined by the Contract Documents and consists of, but not limited to, the following Phase 1.5 work:
Implementation of traffic control devices includes jersey barriers, signage, and First Street temporary lane re-striping. As a result of closing the existing First Street sidewalk, jersey barriers are to be installed that are intended for safe, temporary pedestrian traffic for the duration of Phase 1 and Phase 2 work. Location of the jersey barriers will require the existing First Street vehicle lanes to be temporarily restriped as part of this project.
Work for this project to begin March 1, 2018. Removal of jersey barriers and signage to occur on March 1, 2020. Upon completion of Phase 2 construction and after all jersey barriers and signage have been removed, First Street will be restriped as part of Phase 2 Building Construction work. Jersey barriers to be maintained for the duration as indicated above.
All work to be coordinated with City Officials and authorities having jurisdiction.
All Phase 1.5 Traffic Control work to be coordinated with the Phase 1 Site Demolition General Contractor. All work of this contract must be executed prior to Phase 1 Site Demolition work can begin.

Project Location: Louisville

More Details

Mt Sterling Water & Sewer System – South Sycamore Street Water Line Project

Mt Sterling Water & Sewer System – South Sycamore Street Water Line Project

PROJECT DESCRIPTION:
This project consists of approximately 1000 linear feet of 8″ water main, services, and related accessories. Water Line Materials will be
supplied by the owner. Contractor shall be responsible for all final
dressing, seeding, fertilizing, mulching, etc. of the disturbed area.
Contractor shall be responsible for repair of all disturbed and/or damaged
areas of concrete or asphalt paving, or gravel areas such as streets, sidewalks, and driveways, and provision of materials for those repairs.

Project Location: Mt Sterling, Kentucky

More Details

3601 Rosemont Court Bank Stabilization Project

3601 Rosemont Court Bank Stabilization Project

Description and location of Project: This unit based construction order is for a bank stabilization along the bank of Beargrass Creek next to 3601 Rosemont Court, in Metro Council District 26.

Project Location: Louisville, Kentucky

More Details

City of Jeffersonville – Gateway Corridor Roadway Improvements

City of Jeffersonville – Gateway Corridor Roadway Improvements

PROJECT DESCRIPTION:
This project consists of widening and overlay of approximately 2,700 feet of mainline roadway with storm sewers, curb and gutter, sidewalks, pavement markings, decorative traffic signals, and all other items shown on the plans and mentioned in the specifications for a complete project.

Project Location: Jeffersonville, Indiana

More Details

18-25 / Eastern Parkway 48-Inch Transmission Main Rehabilitation Phase 2B

18-25 / Eastern Parkway 48-Inch Transmission Main Rehabilitation Phase 2B

Louisville Water Company is requesting Bids for the rehabilitation, replacement and relocation of the existing 48-inch cast iron main by sliplining and open trench methods. Pipeline installation includes sliplining 1,440 +/- LF of 42-inch welded steel pipe along a segment at the project beginning at Winkler Avenue and heading north along South 3rd Street and along a segment at the project ending at I-65 overpass and heading west along Eastern Parkway. In between these segments the pipeline installation includes 3,400 +/- LF of 42-inch ductile iron water main by open trench method traversing the UL campus across Floyd Street and Brook Street and then parallel to Norfolk Southern Railroad. Also included in the project: open trench installation of 466+/- LF of 12-inch ductile iron water main and appurtenances along South 3rd Street at Eastern Parkway to compete a grid tie; three (3) under crossings with 60″ steel casing/tunnel liner plate by bore and jack at CSX RR, Floyd Street and Norfolk Southern RR, totaling 250 +/- LF; eight (8) distribution and transmission connections; relocation of 160 +/-LF of 15″ through 24″ storm sewers; installation of retaining wall; and safeloading 2,410 +/- LF of 48″cast iron main to be abandoned with flowable fill. The bid also includes installation of three (3) 42-inch gate valves, two (2) 16-inch gate valves and two (2) 12-inch gate valves; implementation of MOT phases and EPSC measures and pavement and ground restoration.

Project Location: Louisville, Kentucky

More Details

18-20 / Southwestern Parkway Area Water Main Replacement Project

18-20 / Southwestern Parkway Area Water Main Replacement Project

Louisville Water Company is requesting Bids for the installation of 990 +/- linear feet of 12 – inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), and the installation of 1,500+/- linear feet of 12-inch DR-18 C900 PVC water main (using traditional trench installation techniques), and the installation of 1180+/- linear feet of 8-inch DR-18 C900 PVC water main (using traditional trench installation techniques), and installation of 995+/- linear feet of 6 – inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), and the installation of 985+/- linear feet of 6 -inch DR-18 C900 PVC water main (using traditional trench installation techniques). Also included with the project is the transfer, renewal, relocation or discontinue of 138 +/- customer services, includes Main Replacement, Fire Hydrant removal and installation, cut and plugs, restoration on and along Project Limits as stated above.

Project Location: Louisville, Kentucky

More Details

City of Hustonville – First Southern Emergency Response Station REBID

City of Hustonville – First Southern Emergency Response Station REBID

PROJECT DESCRIPTION:
Construction will include 4 bays to accommodate the fire apparatus, special response vehicle, and EMS apparatus. The Station will have rough ins for adequate office, storage space, male and
female bunk rooms and the required living quarters for EMS personnel.

Project Location: Hustonville, Kentucky

More Details

City of St. Matthews – Massie Avenue Sidewalk Improvements

City of St. Matthews – Massie Avenue Sidewalk Improvements

Please Note: Addendum 01 has changed the Pre-Bid Date & the Bid Date

PROJECT DESCRIPTION:
The project provides for all labor, materials, and equipment necessary to construct a new sidewalk along the south side of Massie Avenue, between Ridgeway Avenue and Hubbards Lane. The improvements include associated work such as tree removal and drainage and grading improvements.

Project Location: St. Matthews, Kentucky

More Details

Medford Lane RL Demolition Project

Medford Lane RL Demolition Project

Description and location of Project: the demolition and proper disposal of all primary and secondary structures, trash, rubbish, basement walls, slabs, foundations, sidewalks, steps, driveways, and all other hardscape improvements from the specified parcel as the parcels become available.

Project Location: Louisville, Kentucky

More Details

LFUCG – Winchester Road, East Seventh Street, Liberty Road Intersection Improvements

LFUCG – Winchester Road, East Seventh Street, Liberty Road Intersection Improvements

Please Note: Addendum 2 has changed the Bid Date.

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items plus incidentals necessary to
complete the work. The work entails removal of the existing traffic signals, poles, and pavement, construction of mast arms for two signalized intersections and approximately 450
square yards of concrete sidewalk, entrance pavement, and curb ramps along US 60
(Winchester Road).

Project Location: Lexington, Kentucky

More Details

WKU-PDC-2018-006 Raymond Cravens Library Curtain Wall Replacement

WKU-PDC-2018-006 Raymond Cravens Library Curtain Wall Replacement

Please note: Addendum 02 has been issued. Bid Date Has Changed

PROJECT DESCRIPTION:
You are invited to bid on furnishing the labor,
equipment, materials, permits, etc. needed to complete the Raymond Cravens Library Curtain Wall Replacement Project on the main campus of Western Kentucky University.
Mrs. Kerra Ogden, Project Managers shall be in charge of this project. Please contact
Warren Whitfield, Manager of Construction Purchasing at warren.whittield@wku.edu
for any information or clarifications you may need about the bid. As soon as an answer is available it will be e-mailed back to you. E-mail will is the preferred method of communication. If it affects the bid specifications, a written Advice of Change will be issued to all bid holders.

The project scope: This project is for removing the existing curtain walls on the Raymond Cravens
Library and replacing with new curtain walls in entirety. Raymond Cravens Library is a 9 story building
and successful contractor must be capable of completing a 9 story project.

There will be a mandatory pre-bid meeting scheduled with Mrs. Ogden in the conference
room of the Planning, Design & Construction Department in Parking Structure # 1 on the
WKU campus Tuesday, February 13, 2018 at 1:00PM CST. Anyone wishing to submit a bid must have representation at this meeting. Subcontractors are not required, but are
welcome.

Project Location: Bowling Green, Kentucky

More Details

RFB-160-18 KCH Campus Renovations Welding Shop

RFB-160-18 KCH Campus Renovations Welding Shop

Project Manager Name: Anne Saint-Aignan
Phone: (502) 782-0337
Email:anne.saintaignan@ky.gov


Estimate:
$155,947.00
Estimated Length of Project:
90 (Substantial Completion) + 30 (Final Completion)

This project will convert an existing maintenance building on the Kentucky Children’s Home campus to be used for welding classes for approximately 4 to 6 students and instructor. Work consists of upgrading existing electrical service to the building. The building will include interior painting, chain link fencing, plumbing and new welding booths furnished and installed by the Contractor. The Owner will furnish welding machines, moveable equipment (grinders, saws, drill press), etc. New electrical receptacles will be required. Existing lights to remain. There will be a new exhaust system. Contractor to construct small concrete pad and chain link enclosure for air compressor furnished by owner, located adjacent to the building.
The existing facilities was constructed in 2002 under Institutional 1-3 requirements. This 1,312 square foot building was constructed as a free standing maintenance building with one small office. The building has a fire suppression system and 3 exterior man doors.
The use group classification will remain Institutional.
The building Construction Type is 3B – Non-Combustible. There are no changes or modifications planned to existing walls or openings.

Project Location: Louisville

More Details