RFB-230-18 Re-Ad of RFB-212-18 Parks – Gen Butler SRP Dam Emergency Spillway Replacement

RFB-230-18 Re-Ad of RFB-212-18 Parks – Gen Butler SRP Dam Emergency Spillway Replacement

Project Manager Name: Frank Phillips
Phone: (502) 782-0331
Email:
frank.phillips@ky.gov


Estimate:
$314,975.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

The Commonwealth of Kentucky, Division of Engineering and Contract Administration (DECA) and the Department of Parks (Parks) is planning to replace the emergency spillway and raise the inlet of the principal spillway for the General Butler State Park Dam.
The concrete emergency spillway was constructed in 1939 by the Civilian Conservation Corps and is in an advanced state of structural distress. The proposed emergency spillway replacement will consist of demolition of the existing 10 foot by 3 foot reinforced concrete box culvert, concrete drop structure, three (3) 48-inch CMP’s and concrete headwall. The new emergency spillway will be a reinforced concrete structure consisting of a 12 foot by 4 foot box culvert through the embankment, discharging to a chute spillway and stilling basin on the downstream side of the embankment. The overall length of the new emergency spillway structure is 133 feet. The stilling basin will discharge to a riprap channel.
In conjunction with demolition of the emergency spillway, the CCC inscription on the culvert headwall on the upstream side of the dam shall be removed intact by saw cutting and the resultant slab preserved for display. The Contractor shall submit a plan prior to demolition, approved by the Design Team and General Butler personnel, for preservation of the concrete slab. The plan shall also include design of a pedestal to support the slab.
The principal spillway for the dam was replaced in 2014 and the new inlet which was installed lowered the previous normal pool elevation of the lake. The principal spillway structure inlet will be raised approximately 1.4 feet by addition of a precast or cast-in-place concrete collar to the existing structure. The inlet raise will return the pool elevation of the lake to previous levels. Raising the inlet will also require raising the existing catwalk and either replacing or extending the slide gate controls, the Contractor shall submit a plan for approval to accomplish this work. The existing principal outlet headwall will be demolished and replaced with a new impact basin discharging to a riprap channel.
Construction of the new emergency spillway will require a substantial excavation of the existing embankment and existing roadway. The entire length of the embankment will be receive new asphalt pavement consisting full depth replacement over the excavation area and overlays elsewhere.
The project requires removal and replacement of an existing wooden walkway located
on the upstream side of the dam near the east abutment. The Contractor will be responsible for restoring the walkway to its current condition utilizing either salvaged existing or new materials. Any deviation from the current configuration will require prior approval by the Design Team and General Butler State Park personnel.
All slopes shall be regraded and disturbed areas will be seeded and mulched. Open areas of the new structures will receive fencing as shown on the Construction Drawings.

Project Location: Carroll

More Details

18-66 / Parkridge Tank Coatings Renovation

18-66 / Parkridge Tank Coatings Renovation

Louisville Water Company is requesting Bids for services to perform complete coatings renovation of the Parkridge water storage tank, including surface preparation, coating application, and miscellaneous tank accessories and site work.

Project Location: Louisville, Kentucky

More Details

Owsley County Schools – Elementary School & High School Facilities Upgrades

Owsley County Schools – Elementary School & High School Facilities Upgrades

PROJECT DESCRIPTION:
Furnish all labor and materials to complete the:
 Owsley County Schools Upgrades for Owsley Elementary School & Owsley High School

Project Location: Booneville, Kentucky

More Details

London – Laurel County Industrial Development Authority – Greer Industrial Park Phase 1 Sewer Extensions

London – Laurel County Industrial Development Authority – Greer Industrial Park Phase 1 Sewer Extensions

PROJECT DESCRIPTION:
The work consists of approximately 872 l.f. of 8”, PVC sewer line and related construction.

Project Location: London, Kentucky

More Details

Grayson County Schools – Oran P. Lawler Elementary School Reroof

Grayson County Schools – Oran P. Lawler Elementary School Reroof

PROJECT DESCRIPTION:
Removal of the existing shingle and single-ply roof systems, gutters and downspouts; and replacement with new shingle and single-ply membrane roofing
systems, and other Work indicated in the Contract Documents. Alternate Bids
include: 1. Roof truss reinforcement, 2. Metal roof system in lieu of shingles, 3.
Removal of existing Gymnasium pre-engineered metal building roof and trim and
replacement with new metal panel roof system and trim.

Project Location: Leitchfield, Kentucky

More Details

Grayson County Schools – H.W. Wilkey Elementary School Reroof

Grayson County Schools – H.W. Wilkey Elementary School Reroof

PROJECT DESCRIPTION:
Work consists of removal of the existing spray-applied foam roof system, metal
trim, gutters and downspouts; replacement with new single-ply membrane roofing
system, metal trim, gutters and downspouts; removal/infill of existing abandoned
curbs; providing new roof portals for rooftop HVAC equipment connections, and
other Work indicated in the Contract Documents. Alternate Bid to include: removal
of existing Gymnasium pre-engineered metal building roof and trim and
replacement with new metal panel roof system and trim.

Project Location: Leitchfield, Kentucky

More Details

CCK-2322-18 Polk-Dalton 142 Renovate Old Dentistry Space

CCK-2322-18 Polk-Dalton 142 Renovate Old Dentistry Space

PROJECT DESCRIPTION:
Renovation of old dentistry space at the Polk Dalton Clinic.

Project Location: Lexington, Kentucky

More Details

Robertson County Board of Education – Bus Garage, Softball Field & Baseball Field

Robertson County Board of Education – Bus Garage, Softball Field & Baseball Field


Please note: Addendum 5 has changed the Bid Date!

PROJECT DESCRIPTION:
Furnishing of the specified labor, materials, supplies, tools, and or services for the:
Robertson County Bus Garage, Softball and Baseball Field
BG#18-247

Project Location: Mt Olivet, Kentucky

More Details

RFB-219-18 KDFWR – KDV Flake Ice Machine Installation

RFB-219-18 KDFWR – KDV Flake Ice Machine Installation

Project Manager Name: Tony Yates
Phone: (502) 782-0338
Email:
Tony.Yates@ky.gov


Estimate:
$ 60,000.00
Estimated Length of Project:
28 (Substantial Completion) + 14 (Final Completion)

The work included consists of furnishing all labor, equipment, transportation, supplies, material, appurtenances and services necessary for the satisfactory installation of the complete project as specified in the Contract Documents.

Project Location: Gilbertsville

More Details

EKU Powell Student Center Renovation – Bid Package 1C – Colonnade Repairs

EKU Powell Student Center Renovation – Bid Package 1C – Colonnade Repairs

PROJECT DESCRIPTION:

Project consists of renovation of the Powell Student Union. The Powell Student Union is a three-story, 133,000 sf building. Built in 1971 and located in the center of
campus. The Powell building serves as a student union, and recreation facility. There is a
cafeteria located on the upper level and several retail food outlets in the lower level. The middle level contains mostly offices and gathering spaces. The renovation project will include removal of the cafeteria on the upper level and repurposing of the spaces.

In addition to Student activities such as meeting rooms, conference space, offices, and general gathering areas, the Powell Student Union will house the University’s bookstore, operated Barnes and Noble, and two retail food locations, operated by Aramark. The plan is to vacate
the building in December 2017, and begin renovations to the space that will allow Aramark to
open and operate the two retail locations by the beginning of the Fall Semester 2018. Aramark
will provide some fit-up of these spaces, but the University will be responsible for providing a
white box.

Construction Contract: Bids will be received for the following Work:

1.  BID PACKAGE 1C – COLONNADE REVISIONS
 WC01-A1 – DEMO (FOR INFORMATIONAL PURPOSES ONLY-NOT FOR BID)
 WC01-B1 – GENERAL TRADES (FOR INFORMATIONAL PURPOSES ONLY-NOT
FOR BID)
 WC01-G1 – MECHANICAL (FOR INFORMATIONAL PURPOSES ONLY-NOT FOR
BID)

 WC01-J – MEMBRANE ROOFING
 WC01-K – PAVERS

Project Location: Richmond, Kentucky

More Details

Bowling Green High School Addition/Renovation – Phase 1 – BP031 Concrete REBID

Bowling Green High School Addition/Renovation – Phase 1 – BP031 Concrete REBID

Please Note: Post Bid Add01 Rebids BP 031 Concrete ONLY

PROJECT DESCRIPTION:
The Bowling Green Independent Schools Board of Education will receive sealed bids for the Bid Package listed for the Bowling Green High School project.
No combination of Bid Packages will be accepted.

Project Location: Bowling Green, Kentucky

More Details

Housing Authority of Prestonsburg – Modernization Project

Housing Authority of Prestonsburg – Modernization Project

PROJECT DESCRIPTION:
Tree Removal, Tree Planting, Concrete Replacement, Flooring & Underlayment, and Electrical
Upgrades

Project Location: Prestonsburg, Kentucky

More Details

Martin County Fiscal Court – Contract No. 2 – Hollybush Water Storage Tank

Martin County Fiscal Court – Contract No. 2 – Hollybush Water Storage Tank

PROJECT DESCRIPTION:
MARTIN COUNTY FISCAL COURT
Contract No.2 – Hollybush Water Storage Tank
Project No. 16038

Project Location: Inez, Kentucky

More Details

Martin County Fiscal Court – Contract No. 1 – Hollybush Water & Sanitary Sewer Extensions

Martin County Fiscal Court – Contract No. 1 – Hollybush Water & Sanitary Sewer Extensions

PROJECT DESCRIPTION:
Contract No.1
HOLLYBUSH WATER AND SANITARY
SEWER EXTENSIONS
Project No. 16038

Project Location: Inez, Kentucky

More Details

RFB-226-18 DVA – Radcliff Veteran’s Center Overflow Parking

RFB-226-18 DVA – Radcliff Veteran’s Center Overflow Parking

Project Manager Name: Butch Hatcher
Phone: (502) 782-0322
Email:
Butch.Hatcher@ky.gov


Estimate:
$316,435.00
Estimated Length of Project:
60 (Substantial Completion) + 30 (Final Completion)

The Radcliff Veterans Center Overflow Parking Lot is located along the entry drive of the Veterans Nursing Home in Radcliff, Kentucky at 100 Veterans Drive. The existing gravel lot will be overlaid with asphalt pavement and striped providing additional permanent parking for the facility. The concrete sidewalk provides an accessible route from the parking lot to the Administration Building. Work associated with this project consists of earthwork to establish finish grades, asphalt and concrete pavement, storm drainage, lighting and landscaping.

Project Location: Radcliff

More Details

Webster County Fiscal Court – Webster County Senior Center Project

Webster County Fiscal Court – Webster County Senior Center Project

PROJECT DESCRIPTION:
The project consists of the renovation / revitalization of the existing Webster County
EMS facility located at 68 North College Street, Dixon, Kentucky into a new senior center. The existing building area to be renovated is 2,596 sq. ft. and will also include a 1,840 sq. ft. building addition for a total building area of 4,398 sq. ft. In addition, the building will also feature a 326 sq. ft. covered drop off with canopy and a 399 sq. ft.
covered porch.

New mechanical, electrical and plumbing systems will be provided throughout both the
existing building renovation as well as the new addition. The existing asphalt entrance
apron / parking area and associated trench drain will be removed and contours modified
to grass and a sidewalk allowing access to the Senior Center and Audubon entrances
from the new ADA accessible parking spaces that will be added adjacent to the new
covered drop off area. The four existing overhead doors will be removed and replaced
with new aluminum storefront windows and wall construction. The existing roof trusses
and sheathing will remain and new roof construction will align with existing. A new metal
roof system will be installed over the entire building area including the new addition, drop
off canopy and covered porch.

The exterior veneer for the building will be a combination of fiber cement siding and
associated fiber cement trim boards with a manufactured stone wainscot and wainscot
cap. The covered porch will have a concrete slab with light broom finish and aluminum
guardrail system.

All demolition All aggregate (Material only supplied by Owner), and site utility relocation
will be performed by the owner and will not be included in the construction contract.

Project Location: Dixon, Kentucky

More Details

Louisville Metro Housing Authority – Roof Replacement for Parkway Place Maintenance Facility

Louisville Metro Housing Authority – Roof Replacement for Parkway Place Maintenance Facility


Please note: Addendum 1 has changed the Bid Date!

PROJECT DESCRIPTION:
Work under this contract includes all labor, materials, equipment and related items of, removal of existing roof system, and providing a new roof system.

This work shall primarily
include, but is not limited to the following items;

 • Proposal No. 1461 – Roof replacement

Project Location: Louisville, Kentucky

More Details

Louisville Metro Housing Authority – Trash Compactor Replacement

Louisville Metro Housing Authority – Trash Compactor Replacement


Please note: Addendum 1 has changed the Bid Date!

PROJECT DESCRIPTION:
Work under this contract includes all labor, materials, equipment and related items required to removal and disposal of existing trash compactors, cleaning of floors and walls in compactor rooms down to sound
degreased substrate, painting cleaned surfaces; installation of new trash compactor systems matching style and
operation of existing systems International Dynetics 12TR (12 in Avenue Plaza, and Dosker Manor Band C,
and 8 in Dosker Manor A); connection of all systems including replacement of elbow connecting chute and
compactor in Avenue Plaza; and Installing new electrical systems.

This work shall primarily
include, but is not limited to the following items;

 • Proposal No. 1462 – Trash Compactor Replacement

Project Location: Louisville, Kentucky

More Details

Louisville Metro Housing Authority – 2914 Annie Avenue Renovation

Louisville Metro Housing Authority – 2914 Annie Avenue Renovation

PROJECT DESCRIPTION:
2914 ANNIE AVENUE RENOVATION
PROPOSAL #1465

Project Location: Louisville, Kentucky

More Details

RFB-225-18 Ross-Ferguson AML

RFB-225-18 Ross-Ferguson AML

Estimate:
$146,576.25
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

Deborah Ross: To arrive at this site in Boyd County, from Frankfort, take I-64 East to exit #179 (KY 67, Industrial Parkway, Wurtland/Greenup). Exit onto KY 67 heading north and go 0.8 mile. Turn left onto East Park Drive and go 0.5 mile. Turn left onto Straight Creek Road (unmarked, the turn is just before the Cintas parking lot) and go 1.5 miles. The Ross residence is on the hill on the left. It is a tan house with blue shutters. Lat. 38° 22’ 51.0”. Long. 82° 47’ 48.6”.
This complaint filed by Mrs. Ross on Oct 23, 2014, involves drainage problems that have developed over time from a previous AML slide reclamation project completed around 1985.
The drainage affecting the Ross home will be redirected into a newly constructed 8’ concrete block-tied mat ditch 640 feet in length to discharge the flow into the previously constructed gabion lined ditch leading down slope to the road side ditch along Straight Creek Road. There will be a 24” culvert 180 feet in length constructed to flow under the road and then discharge directly into Straight Creek. There will also be a 180 L.F. 8’ ECB ditch constructed to direct surface flow into a new 15” HDPE culvert to discharge into a natural ravine flowing down the slope on the north side of the Ross property.
Silt control methods (bales\fencing) will be installed along the slope parallel to these two ditches and also along the access road to be constructed from Straight Creek Road to the upper work area. Any tree removal required will follow the guidelines as stated on the drawings.
LARRY FERGUSON: To arrive at this site in Boyd County, from Frankfort, take I-64 East to exit #179 (KY 67, Industrial Parkway, Wurtland/Greenup). Exit onto KY 67 heading north and go 0.8 mile. Turn left onto East Park Drive and go 0.5 mile. Turn left onto Straight Creek Road (unmarked, the turn is just before the Cintas parking lot) and go approximately 2 miles. Turn left onto Moore Branch Road and travel 0.4 miles, Larry Ferguson residence will be on the left with slide area immediately behind the residence. N38° 23’ 9.8” W82° 48’ 9.2”.
Mr. Ferguson’s complaint involves a creeping slide located a short distance behind his home. This slide at times has restricted the flow in the small channel that exists between the residence and the slope, causing water to escape the channel and flow onto his property and under his home. Reclamation work at this site will be accomplished by constructing a gabion basket mat 12’ wide and 1’ thick in the channel bed with one basket 3’ high on the yard side, and two baskets 6’ high on the slope side for a length of 145 feet. A small amount of excavation on the slope will be done to accommodate the placement of the baskets, with Class II rock then placed between the baskets and the slope. Excavated material will be wasted on site or if necessary at the Ross project site located on Straight Creek Road nearby. There are two seepage areas on the slope that will be excavated to solid material and then filled with Class II rock. An 8 foot Concrete Block Tied Mat Ditch 64 feet in length will be constructed to catch water from these areas and direct the flow into a natural drain leading down to the stream channel below. Tree removal will follow guidelines as stated on the drawings. Silt control methods will be applied where needed throughout the project site. A temporary “low water crossing” will be constructed if needed.
A Boyd County Site Development Permit is required for the projects.

Project Location: Boyd

More Details

181214 Hardin Co. Call 350

Kentucky Transportation Cabinet

CALL 350 CONTRACT ID 181214 HARDIN COUNTY JP02 047 0313 010-015 : JOE PRATHER HIGHWAY (KY 313) WIDEN KY 313 TO 4 LANES BETWEEN PATRIOT PARKWAY AND BULLION BOULEVARD CONNECTOR, A DISTANCE OF 4.46 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 04-00170.00.

Project Location: Hardin County, Kentucky

More Details

181016 Metcalfe Co. Call 348

Kentucky Transportation Cabinet

CALL 348 CONTRACT ID 181016 METCALFE COUNTY FD04 SPP 085 0163 006-008 : TOMPKINSVILLE ROAD(KY-163) REPLACE BRIDGE AND APPROACHES OVER ROGERS CREEK AT MP 7.307 ON KY-163, A DISTANCE OF 0.48 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 03-08506.20.

Project Location:

More Details

182907 Cumberland Co. Call 202

Kentucky Transportation Cabinet

CALL 202 CONTRACT ID 182907 CUMBERLAND COUNTY 029GR18M051-STP BRX CUMBERLAND COUNTY BRIDGE SUPERSTRUCTURE REHABS CUMBERLAND COUNTY STP 0901 (056) : KY 90 (MP 14.118). BRIDGE OVER CUMBERLAND RIVER BRIDGE SUPERSTRUCTURE REHAB. SYP NO. 8–1061. CUMBERLAND COUNTY STP 1611 (006) : KY 61 (MP 10.015). BRIDGE OVER CUMBERLAND RIVER. BRIDGE SUPERSTRUCTURE REHAB. SYP NO. 8–1060.

Project Location: Cumberland County, Kentucky

More Details

181017 Marshall Co. Call 105

Kentucky Transportation Cabinet

CALL 105 CONTRACT ID 181017 MARSHALL COUNTY STPE 6000(124) : US-62 US-62 ROADWAY AND BRIDGE IMPROVEMENTS AND CONSTRUCTION OF NEW MULTI-USE PATH AND MULTI-USE PATH BRIDGE, A DISTANCE OF 3.00 MILES. GRADE, DRAIN & SURFACE WITH BRIDGE. SYP NO. 01-03016.00.

Project Location: Marshall County, Kentucky

More Details

181018 Johnson Co. Call 104

KENTUCKY TRANSPORTATION CABINET

CALL 104 CONTRACT ID 181018 JOHNSON COUNTY STP BRO 5345 (043) : KY-40 REPLACE BRIDGE ON KY-40 OVER BRANCH OF LITTLE PAINT CREEK 0.38 MILES NORTHEAST OF THE JOHNSON/MAGOFFIN COUNTY LINE, A DISTANCE OF 0.10 MILES. BRIDGE REPLACEMENT. SYP NO. 12-01114.00.

Project Location: Johnson County, Kentucky

More Details