Housing Authority of Frankfort – Roofing Replacement
Housing Authority of Frankfort – Roofing Replacement
Addendum 02 has rebid the project.
PROJECT DESCRIPTION:
The project consists of:
Roofing Replacement
Project Location: Frankfort, Kentucky
Housing Authority of Frankfort – Roofing Replacement
Addendum 02 has rebid the project.
PROJECT DESCRIPTION:
The project consists of:
Roofing Replacement
Project Location: Frankfort, Kentucky
RFB-91-19 KYTC – Lincoln County Maintenance Garage Fire Repairs
Project Manager Name: Joseph Sandman
Phone: (502) 782-0329
Email:Joseph.Sandman@ky.gov
Estimate:
$115,000.00
Estimated Length of Project:
60 (Substantial Completion) + 15 (Final Completion)
The project provides repairs/remediation of fire damage to the Lincoln County maintenance garage for the Kentucky Transportation Cabinet, District 8. The work includes new structural steel support columns with concrete footings, new secondary roof framing, modifications to existing steel frames, new rubber roof coating, and painting. The existing building is a 7,200 +/- square feet, pre-engineered metal building with concrete floor slab, constructed in 1967. The Owner will perform cleaning of the existing facility. The Owner will provide electric power and lighting replacement, and replacement of overhead doors via separate contracts.
Project Location: Stanford
Leyton Ave Drainage Improvement Project
Please note this bid has been cancelled and will be reposted in the coming days.
Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty St., Louisville, Kentucky 40203 for the construction of
Leyton Ave Drainage Improvement Project, Contract No. 2019-013, Budget ID No. C19176, will be received at the office of MSD until 10:00 am, Local Time, October 9, 2018, and will be publicly opened and read at that place and time.
Description and location of Project: This unit based construction order is for the paved ditch along the rear property line of Lyndon Lake Place located in Metro Council District 18.
All work shall be done in accordance to MSD’s Standard Specifications.
There will be no pre-bid meeting held for this project.
The Engineer’s Construction Cost Estimate for this project is between $20,000.00 to $49,000.00.
The bid documents will be available on, September 18, 2018, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.
Persons wishing to view the bid documents may do so online at www.msdbids.com, or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.
The Project Manager for this Invitation to Bid is Joseph S Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer Kevin Schmidt E-mail: kevin.schmidt@louisvillemsd.org. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, Angela Akridge, P.E.
IF THE ENGINEER’S CONSTRUCTION COST ESTIMATE IS $50,000 OR MORE, the Minority Business Enterprise and Woman Business Enterprise (MBE/WBE) participation goals shall be applicable to all contracts and comply with MSD’s Interim Supplier Diversity Policy and Guidelines (Interim Policy). The Interim Policy is considered as one of the elements of responsiveness in a bid. Bidders must subcontract at least 15.0% of the total amount of the Contract Bid price to a certified MBE and 6.0% to a certified WBE, or if the Contractor is unable to meet the goals, must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the Interim Policy. See (MSD Construction-Related MBE/WBE Documents and Forms at http://www.msdlouky.org/insidemsd/diverse ). Each bidder is responsible for careful review of the Interim Policy requirements contained in the bid documents. Failure to comply with the Interim Policy may be grounds for rejection of the bid as non-responsive.
All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Kevin Schmidt at kevin.schmidt@louisvillemsd.org.
MSD Interim Supplier Diversity Policy and Guidelines for this project is as follows:
15% MBE and 6 % WBE participation is not required for this project
LOCAL LABOR PREFERENCE: NO
The Contract will be awarded on the basis of the lowest responsive, responsible bid, subject to the approval of the Board of MSD. MSD reserves the right to reject any or all bids or waive any informality in any bid.
LOUISVILLE AND JEFFERSON COUNTY
METROPOLITAN SEWER DISTRICT
Angela Akridge, P.E.
Chief Engineer
Rene’ Thomas
Director of Procurement &
Supplier Diversity
MSD Procurement Department
Project Location:
RFB-29-19 KDFWR – Pecan Grove Waterfowl Habitat Enchancement Project
Project Manager Name: Josh Morgan
Phone: (502) 564-3155
Email: josh.morgan@ky.gov
Estimate:
$141,636.00
Estimated Length of Project:
60 (Substantial Completion) + 15 (Final Completion)
This project is broken down into four units as described by the engineering plans. Refer to the engineering design for all elevations and estimated quantities, dike profiles, water control structure and pipe specs, construction notes and invasive species requirements. The work consists of preparing the area for treatment; furnishing and placing seed, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
Project Location: LaCenter
Henry County Judicial Center – Phase 1 Demolition
PROJECT DESCRIPTION:
Furnishing of all
labor, materials, supplies, tools, equipment, services, etc. necessary for the construction of The New Henry County
Judicial Center
Project Location: New Castle, Kentucky
WKU-10167 Construct WKU Golf Practice Facility
Please Note: Addendum 01 has changed the Bid Date
WKU invites you to bid on CONSTRUCT WKU GOLF PRACTICE FACILITY
The project consists of a 4168 square foot brick building. This building is a practice facility for the WKU golf teams. This building will be located at the WKU Intramural property just south of the existing tennis courts. Interior will include a conference room, putting area, 2 golf bays, and 2 restrooms.
CONTRACTORS PLEASE NOTE: Questions regarding this bid may be posted at this link: https://supplier.unimarket.com/app/supplier/bid-request/view/rfq-uuid/0c75b1b4-f8fe-4af6-a169-a07cdca3fe84
This link is WKU TopShop (Unimarket) sourcing. All questions and answers will be posted on this link. You will need
to join WKU TopShop in order to post questions or see answers. If you have any questions regarding this new
process, please contact Marci Morehead, Purchasing Agent, 270-745-6365 or Doris Hayes at 270-745-5355.
Project Location: Bowling Green, Kentucky
CCK-2361-19 W.T. Young Library Condensate Lane Replacement
PROJECT DESCRIPTION:
Contractor to supply labor and equipment and materials as required for the installation of a new 4” condensate-return piping system from the Boone Center Steam vault to the W.T. Young Library Mechanical Room.
Project Location: Lexington, Kentucky
CCK-2357-19 Installation of Magnetic Drive Chiller Cooling Plant #2
PROJECT DESCRIPTION:
This project consists of replacing an existing 1,000 ton chiller with a new 1,000 chiller.
The existing electrical feed, pumps, tower piping… will be reused. Make connections
as shown on the plans.
Project Location: Lexington, Kentucky
CCK-2360-19 Bradley Hall Copper Roof and 4th Floor Interior Repairs
Please Note: Addendum 02 has changed the Bid Date
PROJECT DESCRIPTION:
Bradley Hall is part of the historic quadrangle of buildings located at the University of Kentucky. The
intent of this project is to remove the existing asphalt shingle roof on Bradley Hall, repair the deck and
roof structure as needed, install a complete functioning and leak-proof standing seam copper-roof system, repair interior plaster damages in the fourth floor rooms, and lighting replacements in the fourth
floor rooms. The project includes, but is not necessarily limited to:
1. Removing all existing asphalt roofing and disposing of properly
2. Repairing roof decking, rafters and purlins
3. Installing new standing seam copper-roof system on the building and dormers
4. Installing new copper valleys on main roof, dormers, and attic vents
5. Installing new copper flat-seam roofs on attic vents
6. Installing new standing-seam copper roofs on the dormer gable-roofs
7. Installing new flat-seam copper roofs on the bridging between joined dormers
8. Installing a roof hatch
9. Installing copper drip edges on the dormer rakes and eaves
10 Installing snow guard with copper rail system (snow and ice retainers) on main roof eaves
11 Fourth Floor interior wall and ceiling plaster repairs
12. Priming and painting the repaired plaster walls, ceilings and wood work
13. Replacing the interior room lighting fixtures with LED fixtures
Project Location: Lexington, Kentucky
City of Lancaster – Lancaster Dam Rehabilitation Project
PROJECT DESCRIPTION:
The work includes construction of 65 LF of 72-in. Corrugated Metal Pipe and related work to serve as an overflow pipe in the dam of the Lancaster Reservoir (East).
Project Location: Lancaster, Kentucky
Gate 111 Pipe and Gate Elimination and Gate 110 Elimination Project
Description and location of Project: The elimination and removal of flood gates 110 & 111 and the safeloading of pipe located at 1400 Southwestern Parkway, Louisville, KY.
Project Location: Louisville, Kentucky
Garrard County Board of Education – Lancaster Elementary Security Vestibule REBID
Please note: Post Bid Addendum 03 has rebid the project.
PROJECT DESCRIPTION:
Project consists of construction of a security vestibule out of storefront
framing and doors with door hardware to provide better security at the school main entry.
Project Location: Lancaster, Kentucky
Grayson County Detention Center Expansion
Please Note: Addendum 02 has changed the Bid Date
PROJECT DESCRIPTION:
Furnish all labor and materials to complete the
GRAYSON COUNTY DETENTION CENTER EXPANSION
Project Location: Leitchfield, Kentucky
Housing Authority of Harrodsburg – HVAC Upgrades
PROJECT DESCRIPTION:
The project consists of:
HVAC Upgrades
Project Location: Harrodsburg, Kentucky
Saint Andrew Orthodox Church
Please Note: Addendum 01 has changed the Bid Date
PROJECT DESCRIPTION:
Project consists of building and site work for a new Orthodox Church.
Project Location: Lexington, Kentucky
London-Laurel County Industrial Development Authority – Greer Industrial Park Build Ready Site Prep
PROJECT DESCRIPTION:
The work consists of earthwork for a 200,000 s.f. building pad at the Greer Industrial Park.
Project Location: London, Kentucky
Glasgow Middle School Security Vestibule & South Green Elementary School Security Vestibule – REBID
PROJECT DESCRIPTION:
Project consists of construction of a security vestibule within the existing building area of the school lobbies.
Bid Package No. 1 – Scope Description:
Bid package to include the following:
· All work, installation, materials, etc., as shown in Contract Documents for
aluminum storefront, framing, doors, glazing, door hardware and
miscellaneous accessories.
· All demolition, patch and repair as required for new work.
· Final wire mold and wiring for electronic strikes to access control / audio
intercom door controller above ceiling.
Bid Package No. 2 – Scope Description:
Bid package to include the following:
· All work, installation, materials, etc., as shown in Contract Documents for
access control / audio intercom system.
· All demolition, patch and repair of existing intercom system as required
for new system.
· Final connection of wiring from door hardware to access control door
controller located above ceiling.
Project Location: Glasgow, Kentucky
RFB-89-19 Parks – Lake Cumberland Lodge Sprinkler Head Replacement
Project Manager Name: David Marshall
Phone: (502) 782-0332
Email:
David.Marshall@ky.gov
Estimate:
$412,928.00
Estimated Length of Project:
150 (Substantial Completion) + 30 (Final Completion)
This Work includes the renovation to the interiors including the sprinkler system at Guest Unit Buildings B and C at the Lake Cumberland State Resort Park. Room furnishings will be removed by Contractor and stored on site. The existing gypsum board ceilings and fiberglass batt insulation will be removed from the second floor guests rooms only in both buildings (B and C). Contractor will install new closed cell foamed in place insulation at underside of roof deck to make the attic part of the conditioned space.
A new wood tile ceiling grid system will be installed at the second floor guest rooms after sprinkler work is complete. All gypsum board ceilings will be repaired and touched up as necessary after sprinkler head replacement. All gypsum board ceilings will be repainted entirely to ensure a consistent and even painted finish (excluding areas receiving wood tile ceiling).
Project Location: Jamestown
LFUCG – West Hickman WWTP Solids Processing Building Boiler Plant Replacement Project – 122-2018
PROJECT DESCRIPTION:
The project includes providing all construction/installation supervision, labor, materials, tools, test equipment necessary for West Hickman WWTP Solids Processing Building Boiler Plant Replacement Project.
Primary work will include:
Demolition and disposal of the existing boilers, flu, combustion air damper, primary system pumps, boiler circulator pumps, 3-way mixing valves, solids building circulation pumps and associated piping, valves and other hardware.
Procurement, installation and testing of condensing boiler units, combustion and exhaust air piping, primary system pumps, solids building circulation pumps and associated pipping, valves and other hardware required to integrate the new boiler plant with the existing hot water supply and return piping.
The Bidder will also be responsible for furnishing all new process and safety controls and piping components necessary to ensure compliance with all applicable codes and to ensure operability of the hot water system.
Project Location: Lexington, Kentucky
Knox County Utility Commission – KY 904 – Coalstone Branch Water Line Extension
PROJECT DESCRIPTION:
KY 904 Coalstone Branch Water Line Extension consists of
installing approximately 2,400 L.F. of 3” PVC waterline, approximately 4,400 L.F.
of 4” PVC waterline and all necessary appurtenances.
Project Location: Barbourville, Kentucky
RFB-88-19 Testing and Balancing Services for Ag Health and Career Tech
Project Manager Name: Tony Yates
Phone: (502) 782-0338
Email:
Tony.Yates@ky.gov
Estimate:
$ 40,000.00
Estimated Length of Project:
(Substantial Completion) + March 19, 2019 (Final Completion)
The specifications describe the work to be done and the material to be provided for performing HVAC Testing, Adjusting and Balancing (TAB) services for the referenced project.
Project Location: Hopkinsville
1400 Bernheim Lane Drainage Improvement Project
Description and location of Project: This unit based construction order is for the installation of a underground storage area with a concrete basin next to 1400 Bernheim Lane in Metro Council Distict 3
Project Location: Louisville, Kentucky
RFB-85-19 KYTC – Rowan Bulk Salt Storage Structure
Project Manager Name: Joseph Sandman
Phone: (502) 782-0329
Email:Joseph.Sandman@ky.gov
Estimate:
$232,172.00
Estimated Length of Project:
80 (Substantial Completion) + 15 (Final Completion)
This project is for the construction of a 140’-3″ long x 60′-0″ wide x 10’ high concrete structure with a concrete pad and entrance apron for the purpose of bulk storage of roadway, deicing salt. Class “A” concrete reinforced with rebar & fiber will be used in the shallow, spread footings and walls. Class “AA” concrete modified with fiber will be used in interior pad and entrance apron. The Contractor shall be required to perform all excavation, filling, grading, & compaction of sub-grade necessary for the construction of footing, interior pad, and entrance apron.
Concrete walls will be ten (10) feet high, will be twelve (12) inches thick, will be constructed on the concrete footing, and will support a pre-engineered, membrane covered (roof) structure (PMCS). The roof structure is to be furnished and installed separately by Bulk Storage, Inc., per their current Master Agreement upon completion of the footing and walls under this contract. The (PMCS) is not a part of this Scope of Work.
A nine (9) inch thick concrete slab will be placed inside the footing and at the entrance on the exterior of the structure.
This project is to be bid LUMP SUM. This bid shall include all labor, equipment, materials, and any incidentals necessary to complete the items of work detailed in plans and herein.
Project Location: Rowan
Hardin County Water District No. 1 – Hwy 144 Water Transmission Improvements
PROJECT DESCRIPTION:
The Project consists of constructing approximately 5,900 linear feet (LF) of 6-inch ductile iron or PVC (alternate) water line, and all associated valves, services, and appurtenances.
Project Location: Radcliff, Kentucky
Martin County Board of Education – Martin County Area Technology Center
PROJECT DESCRIPTION:
Furnish all labor and materials to complete the MARTIN COUNTY AREA TECHNOLOGY CENTER
Project Location: Inez, Kentucky