Work involves selective demolition, repairs and reconstruction to concrete slab areas in the Basement of the Capitol Building, and concrete repairs in utility tunnels below the Basement. Work includes new floor finishes in select areas where repairs occur.
Glasgow Regional Landfill – Construction of a Contained Landfill Liner System – Phase 6
Glasgow Regional Landfill – Construction of a Contained Landfill Liner System – Phase 6
The program of work for which bids are to be submitted consists of, but is not limited to, the following:
Construction of a Construction/Demolition Debris Landfill Liner System for Cell 6.
Renovations for the Daniel Boone Hotel will consist of: demolition and disposal of items, environmental mitigation.
clean up air and testing,
repair of damaged floors and walls,
stabilizing the structure, and roof replacement.
Mt. Sterling Water and Sewer System – South Queen Street and US Hwy No 460 Water Line Project
Mt. Sterling Water and Sewer System – South Queen Street and US Hwy No 460 Water Line Project
This project consists of
approximately 2,700 linear feet of 8″ water main, 100 linear feet of 6″
water main, services, and related accessories. Water Line Materials will
be supplied by the owner. Contractor shall be responsible for all final dressing, seeding, fertilizing, mulching, etc. of the disturbed area.
Contractor shall be responsible for repair of all disturbed and/or damaged areas of concrete or asphalt paving, or gravel areas such as streets, sidewalks, and driveways, and provision of materials for those repairs.
Description and location of Project: This unit base construction order is for the 12-inch pipe and drain installation along Woodbourne Ave. in Metro Council 8.
CCK-2388-19 Emergency Department Renovation UK Medical Center – PAV A
CCK-2388-19 Emergency Department Renovation UK Medical Center – PAV A
This Project encompasses the renovation of ~1,100 sf of the Emergency Department on the
Ground Floor of Pavilion A in the UK Albert B. Chandler Hospital.
Housing Authority of Middlesborough – Roof Replacements KY19-2 & KY19-4
Housing Authority of Middlesborough – Roof Replacements KY19-2 & KY19-4
The Housing Authority of Middlesborough will receive bids for the complete construction of the
project entitled Capital Funding Program KY36P019-501-18, Middlesboro, Kentucky.
Sealed proposals for furnishing all labor, materials and equipment and performing all
work necessary to complete the pavement rehabilitation on the t-hangar apron will be
received by Thomas Woosley at the Fleming – Mason Airport located at 7079 Airport Road
The project consists of the installation of approximately 2,350 linear feet of 12-inch gravity
sewers including a stream and roadway crossing, and related appurtenances.
Louisville Metro – Renovation of Louisville Metro Safe Call Center at the Central Government Center 7201 Outer Loop – 190141
Louisville Metro – Renovation of Louisville Metro Safe Call Center at the Central Government Center 7201 Outer Loop – 190141
Please Note: Add02 has changed the Bid Date.
Louisville Metro Government Department of Facilities Management is soliciting proposals for the
Renovation of Louisville Metro Safe Call Center at the Central Government Center 7201 Outer Loop.
Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire. Sealed Proposals must be uploaded,
submitted, and finalized prior to the closing at 03/14/19 3:00pm. The bid document and drawings
are available on Bonfire and Lynn Imaging, all other forms, documents and attachments are available
on (https://louisvilleky.bonfirehub.com/portal).
Derek R Guthrie WQTC Sodium Hypochlorite System Modifications
Derek R Guthrie WQTC Sodium Hypochlorite System Modifications
Please note: Addendum 01 has changed the Bid Date!
Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty Street, Louisville, Kentucky 40203 for the construction of Derek R Guthrie WQTC Sodium Hypochlorite System Modifications Contract No. 16,118, Budget ID No. D19045, Drawing Record No. 16118, Sheet No. 1-9, will be received at the office of MSD until 10:00 AM, Local Time, Tuesday March 12, 2019, and will be publicly opened and read at that place and time.
Description and location of Project: Modifications to the piping system and containment area in the Sodium Hypochlorite Building. MBE/WBE goals are waived for this project.
All work shall be done in accordance to MSD’s Standard Specifications.
There will be a Non Mandatory pre-bid meeting held for this project. Pre Bid meeting to be held at the DRGWQTC Administration Building located at 11601 Lower River Road Louisville, KY 40272 on Tuesday March 5, 2019 at 10:00 AM Local Time. Site visit immediately following. All visitors will be required to furnish their own PPE to visit the site.
The Engineer’s Construction Cost Estimate for this project is between $20,000 to $250,000.
The bid documents will be available on, February 22, 2019, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.
Persons wishing to view the bid documents may do so online at www.msdbids.com or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.
The Project Manager for this Invitation to Bid is Steven Leong. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Project Manager, Steven Leong at: steven.leong@louisvillemsd.org. Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, Angela Akridge, P.E.
IF THE ENGINEER’S CONSTRUCTION COST ESTIMATE IS $50,000 OR MORE, the Minority Business Enterprise and Woman Business Enterprise (MBE/WBE) participation goals shall be applicable to all contracts and comply with MSD’s Interim Supplier Diversity Policy and Guidelines (Interim Policy). The Interim Policy is considered as one of the elements of responsiveness in a bid. Bidders must subcontract at least 15.0% of the total amount of the Contract Bid price to a certified MBE and 6.0% to a certified WBE, or if the Contractor is unable to meet the goals, must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the Interim Policy. – (see MSD Construction Related MBE/WBE Documents and Forms at http://www.msdlouky.org/insidemsd/diverse ). Each bidder is responsible for careful review of the Interim Policy requirements contained in the bid documents. Failure to comply with the Interim Policy may be grounds for rejection of the bid as non-responsive.
All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Project Manager.
MSD Interim Supplier Diversity Policy and Guidelines for this project is as follows:
15% MBE and 6% WBE participation is not required for this project.
LOCAL LABOR PREFERENCE: No
The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.
Knott County Water and Sewer District – Pippa Passes Sewer Rehabilitation Project Phase II
Knott County Water and Sewer District – Pippa Passes Sewer Rehabilitation Project Phase II
The work to be bid consists of:
Installation of approximately 6725 LF of 8” SDR 35 PVC folded/formed liner or alternate method of lining and
other rehabilitation services for a Gravity Sewer Collection System. Time of Completion for this contract shall
be 270 calendar days.
CCK-2387-19 CAER Re-Caulk Exterior Precast Stone Facade
CCK-2387-19 CAER Re-Caulk Exterior Precast Stone Facade
Please Note: Addendum 01 has changed the Bid Date
This Project is for cleaning and waterproofing the exterior of the building including replacing failed
insulated glass units. Project includes interior drywall damage repairs and repainting.
Scott County – Coppage Road Culvert Replacement Project
Scott County – Coppage Road Culvert Replacement Project
The purpose of this project is to replace the existing pipe culverts with a reinforced concrete box
culvert on Coppage Road 46 feet South Josephine Road in Scott County, Kentucky.
This project includes a new Field House for high school softball and soccer
training, renovations to the Concessions Building, and renovations or replacement of the Press Box
Building. The Field House is a pre-engineered metal building structure with masonry wainscoting and
includes a large multipurpose indoor training area, locker room, office and support spaces. Base bid
area of the Field House is 5,200 sf. The alternate area for an expanded Field House is 8,400 sf.
Renovations to the Concessions building include upgraded MEP items, new doors and hardware as
well as new finishes. Renovations to the Press Box include new finishes, new doors and hardware; or
total removal and replacement with a prefabricated unit if the alternate is accepted.
Project encompasses the complete interior renovation of 41,329 SF of an existing hotel to
convert it to new conference and office spaces for University of Kentucky Healthcare in
Lexington, KY.
Project consists of construction of a new site entry, and concrete
pad outside of new overhead doors. Interior work to include removal of existing
masonry walls for new overhead door installation, removal of existing 6” concrete floor
and installation of new concrete floor with floor drains.
Original documents have been revised for value engineering to reduce scope.
The project consists of complete tear-off of existing 4-ply smooth surface built-up roof and installation of new SBS Bituminous Membrane Roof System including insulation. A portion of the existing roof is gravel surface – refer to drawings.
City of Lancaster – Contract 1 New Water Treatment Plant
City of Lancaster – Contract 1 New Water Treatment Plant
Contract 1 – New Water Treatment Plant consisting of upgrades to the existing raw water pump station, and intermediate booster station; new flash
mix, flocculation/ sedimentation basins, filter building, clearwell, high service pump station, chemical feed building, electrical, instrumentation/control work and all related appurtenances.