CCK-2413-19 Improve Clinical/Ambulatory Services – Cancer Services – 2500.0
CCK-2413-19 Improve Clinical/Ambulatory Services – Cancer Services – 2500.0
Please note: Addendum 03 has changed the bid date.
Project consists of renovating the 1st and 2nd floors of Whitney Hendrickson Bldg. (Pavilion WH, Bldg #0098) for
use as an Infusion Clinic. Renovate a suite on the 2nd floor of Chandler Medical Center (Pavilion H, Bldg #0293) for use as an Infusion Clinic. Renovate the 2nd floor of Ben Roach Bldg. (Pavilion CC, Bldg #0093) for use as a medical clinic.
Mason County Board of Education – Mason County High School Steam Academy Activity Area Flooring Replacement Phase 7
Mason County Board of Education – Mason County High School Steam Academy Activity Area Flooring Replacement Phase 7
Please note: Addendum 02 has changed the bid date.
Sealed bids will be received by the Mason County Board of Education for the Mason County Phase 7 – Flooring Replacement at STEAM Activity Area in Maysville, Kentucky
Eastern Kentucky University – Telford Hall Sanitary Risers Replacement
Eastern Kentucky University – Telford Hall Sanitary Risers Replacement
The project involves replacing sanitary risers in Telford dormitory on Eastern Kentucky
University’s campus in Richmond, Kentucky. The contractor will be required to replace
existing cast iron sanitary piping with new PVC piping for fourteen risers on floors two through
thirteen. All penetrations through the floor must be fire stopped and inspected by a third-party
agency. The scope of work also includes replacement of two, domestic water gate valves with
new ball valves in each plumbing chase.
Mason County Board of Education – Mason County General Construction Miscellaneous Renovations
Mason County Board of Education – Mason County General Construction Miscellaneous Renovations
Sealed bids will be received by the Mason County Board of Education for the General Construction Renovation Project for Straub Elementary School, Mason Co Middle School, Mason Co High School, Jones Gym and Auditorium in Maysville, Kentucky
Louisville Water Company is requesting Bids for project consisting of the water main replacement on S. 41st Street, S. 40th Street and S. 39th Street. Design information indicates the supply and installation of 1,050 +/- linear feet of 24-inch Pressure Class 250 restrained joint ductile iron water main (using traditional trench installation techniques), the supply and installation of 40 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main and the supply and installation of 2,325 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main. Also included with the project is the installation of 4 fire hydrants and the transfer, renewal, relocation or discontinue of 49 +/- customer services
Please note: Addendum 03 has changed the bid date.
The work to be performed consists of: kitchen and bathroom upgrades, replacement of two plumbing risers,
HVAC installation, update of two elevator cabs and replacement of storefront.
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned
or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.
Fayette County Public Schools – Fayette County STEAM and Success Academies
Fayette County Public Schools – Fayette County STEAM and Success Academies
This project scope includes the renovation of an existing building at 1555 Georgetown Road in Lexington,
Kentucky, to house both Fayette County Public School’s STEAM Academy and Success Academy. The existing building was built in 2007 for Imani Baptist Church, but much of the interior was not completed when Fayette County Public Schools purchased the property in 2017. The project includes demolition of
existing structural steel, concrete slabs (elevated and on grade), and CMU stair shafts as well as interior non-load bearing items. It also includes a complete renovation of the interior space, except for the athletics portion, which includes a large gymnasium, running track, locker rooms, and exercise space,
which will largely remain. A new steel-framed second floor supported by new columns and shallow foundations punched through the existing slab on grade will be added to the previously unfinished
sanctuary space, to increase the second floor area. The total gross square footage of the building will be 134,221. Kitchen is to be full sized with a grab-n-go style food court serving area designed to
accommodate approximately 250 students per lunch period and 700 meals daily. Base bid exterior renovations include removal of the existing steeple, a limited number of new doors and windows, a limited area of new cladding, recoating the existing low-slope roofing, adding tubular skylights and premanufactured
aluminum canopies. Bid alternates provide for more extensive exterior renovations of the STEAM and Success Academy entrances. The project adapts the existing parking lot to meet KDE and
FCPS requirements by removing and altering sections to separate the parent/student drop off loop from
the bus loop. Existing wet pipe sprinkler system will be modified for new spaces. New plumbing fixtures, water heaters, domestic hot and cold water, and sanitary piping will be provided throughout. Some
sanitary piping will be reused. Roof leaders will be relocated. New natural gas piping will be provided. Existing service entrances will remain. HVAC shall consist of two-stage, water-source heat pumps served
by a fluid cooler and electric boilers. Dedicated outside air units with energy recovery will provide fresh, conditioned air to the building occupants. Direct digital HVAC controls shall be installed. A bid alternate will provide a geothermal well-field in lieu of the fluid cooler and boilers. New electrical and telecommunications service entrances will be provided. New electrical distribution switchboards and panelboards will be provided throughout to serve new receptacles and LED lighting. Other new electrical systems include fire alarm, security, sound, data/voice, public address, emergency generator, and lighting control systems.
Woodford County Board of Education – Woodford County High School Cooling Tower Replacement
Woodford County Board of Education – Woodford County High School Cooling Tower Replacement
The project scope includes all associated work to replace the existing cooling
tower at Woodford County High School to include new cooling tower, turbine pump replacement,
controls and associated electrical demolition and connections. Existing cooling tower is to be
dismantled and removed from site.
Louisville Water Company is requesting Bids for the Phase One (1) renovation of the Crescent Hill Filter Plant Chemical Building located at 3018 Frankfort Avenue. Phase One (1) project renovations shall address the lower level and first floor of the Chemical Building, including relocating all functioning Treatment Plant services in conflict with the improvements. The existing Plant services are critical to the daily treatment of water and will remain in-service during construction. The improvements shall consist, but not limited to, pouring a concrete pad footing in the lower level, steel structural supports, installing a concrete first floor, constructing the bases of two new fire rated stairwells, and abatement of all existing lead paint within the limits of the project, including all labor, rigging, equipment and materials.
A pre-bid meeting to discuss the Project and to tour the work site will be held on Thursday, May 30, 2019 at 9:00 AM EST at Crescent Hill Pump Station Building, 201 Stilz Avenue, Louisville, KY 40206 in the Crescent Hill Training Room. Attendees must check in with the Security Building guard located at the Stilz Avenue entrance and park in the lot behind the Pump Station Building. Attendance at this meeting is MANDATORY.
Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Robin Heitz, email at rheitz@lwcky.com.
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $1,000,001 – $3,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.
Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This bid requires prequalification in the following prequalification categories: Prime Contractor must be prequalified in either Heavy Construction or Building category. Subcontractors must be prequalified in Electrical, HVAC, Painting and/or Plumbing categories. For information about pre-qualification, contact the Buyer listed above.
Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.
Marion-Crittenden County Airport – 3-Unit Box Hangar
Marion-Crittenden County Airport – 3-Unit Box Hangar
Project consists of furnishing all labor, materials and equipment and performing all work necessary for 3-Unit Box Hangar at the Marion-Crittenden County Airport
Fayette County Public Schools – Bryan Station High School New Softball Fieldhouse
Fayette County Public Schools – Bryan Station High School New Softball Fieldhouse
The Scope of Work intent of the project is to construct a new Softball Fieldhouse on the existing grounds of Bryan Station High School. This work includes excavation, concrete foundations, concrete
slabs, masonry, wood trusses, asphalt shingle roofing, painting, toilet partitions, toilet accessories, plumbing, mechanical systems, power, light fixtures and other miscellaneous related work to complete the project.
CALL 302 CONTRACT ID 191025 HARDIN COUNTY BR2 047 0361 000-001 : CARDINAL DRIVE(KY-361) RELOCATE INTERSECTION OF WOODLAND DRIVE AT US-31W, A DISTANCE OF 0.46 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 04-07020.00.
CALL 300 CONTRACT ID 191023 LAUREL COUNTY FD04 SPP 063 0363 009-010 : KEAVY-LONDON ROAD(KY-363) ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENT ON KY-363 FROM KY-1006 TO KY-192, A DISTANCE OF 0.33 MILES. GRADE & DRAIN WITH ASPHALT SURFACE. SYP NO. 11-00147.10.
CALL 205 CONTRACT ID 195106 CLAY, HARLAN, LESLIE COUNTIES 121GR19D106- STP BRZ CR-1255-KY 219-CR 1212 CLAY COUNTY STP BRZ 9030 (047) : CR-1255 (MP .074) ADDRESS DEFICIENCIES OF CR-1255 BRIDGE OVER HORSE CREEK (026C00070N), FROM MP .074 TO MP .08 (MP .08), A DISTANCE OF 0.01 MILES. BRIDGE REPLACEMENT. SYP NO. 11-10008.00. HARLAN COUNTY STP BRZ 9030 (069) : KY 219 (MP .325) ADDRESS DEFICIENCIES OF KY-219 BRIDGE OVER WALLINS CREEK (048B00048N), FROM MP .325 TO MP .333. (MP .333), A DISTANCE OF 0.01 MILES. BRIDGE REPLACEMENT. SYP NO. 11-10011.00. LESLIE COUNTY STP BRZ 9030(090) : CR 1212 (MP .056) ADDRESS DEFICIENCIES OF CR-1271 BRIDGE OVER MIDDLE FK KENTUCKY RVR (066C00023N), FROM MP .056 TO MP .066. (MP .066), A DISTANCE OF 0.01 MILES. BRIDGE REPLACEMENT. SYP NO. 11-10031.00.