RFB-203-20 Johnson Co Landfill Leachate Force Main System

RFB-203-20 Johnson Co Landfill Leachate Force Main System

Estimate:
$2,543,874.00
Estimated Length of Project:
300 (Substantial Completion) + 30 (Final Completion)

Major Work items in this Contract include:
Installing pump stations, valve vault, and force main.
Installing gravity sewer piping, manholes, and accessories.
Contractor shall coordinate with local utility company for installation of electrical service drops. Contractor shall be responsible for providing all electrical connections from the utility company service drop as specified and as shown on the Drawings. The Contractor shall be responsible for all fees and inspections related to the electrical portion of this project.
Contractor shall coordinate with local utility company for tie-in and meter installation for meter service. Contractor shall be responsible for meeting all utility company requirements for connection and providing all equipment or other apparatus necessary for connections. The Contractor shall be responsible for all fees and inspections related to this portion of the project.
Project Field Office: The Contractor shall provide accommodations in the Contractor’s field office trailer for use by the Owner and Engineer throughout the duration of the project.

Project Location: Johnson

More Details

Franklin County Board of Education – Turf Field Installations at WHHS & FCHS

Franklin County Board of Education – Turf Field Installations at WHHS & FCHS

The work includes the construction of two (2) new artificial turf fields within the existing running tracks at
both High Schools. This scope of work for the construction project includes, but not limited to, the
underground improvements for the new turf fields, excavation of existing soils, grading, underground
drainage systems, fill materials, regrading of spoils on-site, relocation of a scoreboard, new flagpole and
installing empty electrical conduit. The Artificial turf field system and its installation will be purchased off
the State Term Contract by the District from The Motz Group. The contractor shall be required to
coordinate the contract work with the Turf Field System supplier/installer and any daily school activities.

Project Location: Frankfort, Kentucky

More Details

Caldwell County Board of Education – Butler Gymnasium Ph 2 – Window & Lighting Replacement

Caldwell County Board of Education – Butler Gymnasium Ph 2 – Window & Lighting Replacement

Project consists of furnishing all labor, materials, equipment and services for the Butler Gymnasium Phase-2

Project Location: Princeton, Kentucky

More Details

EKU 139-20 Powell Student Life Storefront

EKU 139-20 Powell Student Life Storefront

Eastern Kentucky University (EKU) hereby requests sealed bids for the materials, supplies,
equipment or services set forth herein, subject to all conditions outlined in this Bid Package

Project Location: Richmond, Kentucky

More Details

Warren County Board of Education – Greenwood High School Reroof

Warren County Board of Education – Greenwood High School Reroof

Project consists of the installation of a retrofit roof system over the
existing metal roof system on perlins and steel framing. Scope to include demolition and
replacement of any existing low slope membrane roofing, down to existing metal deck
and installation of new insulation and a TPO roof system. Select locations of metal panel
removal and replacement is also included.

Project Location: Bowling Green, Kentucky

More Details

Warren County Board of Education – Drakes Creek Middle School Reroof

Warren County Board of Education – Drakes Creek Middle School Reroof

Project consists of the installation of a retrofit roof system over the
existing metal roof system on perlins and steel framing. Scope to include demolition and
replacement of any existing low slope membrane roofing, down to existing metal deck
and installation of new insulation and a TPO roof system. Select locations of metal panel
removal and replacement is also included.

Project Location: Bowling Green, Kentucky

More Details

Warren County Board of Education – Alvaton Elementary Reroof

Warren County Board of Education – Alvaton Elementary Reroof

Project consists of removal of the existing metal roof panels, currently
installed over a sandwich panel insulation system. All existing vents, and penetrations
through the existing system are to receive backer rod and sealant for a watertight
installation. Scope to include demolition and replacement of any existing low slope
membrane roofing, down to existing metal deck and installation of new insulation and a
TPO roof system. Select locations of metal panel removal and replacement is also
included.

Project Location: Bowling Green, Kentucky

More Details

CCK-2482-20 UK Steam and Chilled Water Crossing Avenue of Champions

CCK-2482-20 UK Steam and Chilled Water Crossing Avenue of Champions

This project consists of installing steam and chilled water lines across the Avenue of
Champions located on the campus of the University of Kentucky. All existing utility lines have
been identified as accurately as possible using available information but should be considered
approximations. The successful contractor is responsible for locating all existing underground
utilities prior to excavating. Should existing utilities require relocation or rerouting, owner should
be contacted for approval, coordination and implementation. If any charted, uncharted or mislocated
utility service is interrupted for any reason, the contractor will work continuously to
restore service to satisfaction of the owner.

Project Location: Lexington, Kentucky

More Details

Jiffy Lube – Georgetown, Kentucky

Jiffy Lube – Georgetown, Kentucky

Project consists of Site work, Grading, Asphalt Paving,
curbs, Landscaping & Irrigation, Utilities; Concrete
Ftg’s/Slab-on-Grade, CIP Walls @ Oil Change pit, EIFS
Exterior veneer, CMU Trash Enclosure, Structural & Misc.
Steel, Wood Frame Structure, Wood Trusses, Single Ply
Roofing, OH Doors, Hollow Metal Doors, Frames &
Hardware, Glass and Aluminum storefront, Drywall,
Paint, Insulation, Hard tile, Caulking, Toilet Acc., HVAC,
Plumbing, Electrical.

Project Location: Georgetown, Kentucky

More Details

RFB-198-20 DMA – KYANG Response Forces Facility

RFB-198-20 DMA – KYANG Response Forces Facility

Estimate:
$7,714,037.00
Estimated Length of Project:
490 (Substantial Completion) + 30 (Final Completion)

The work includes the construction and renovation of two buildings. A new, 28,000 square foot two story, Response Forces (RF) Building will house the 123rd Airlift Wing (AW) and requires properly sized and configured facilities, which includes Security Forces Squadron (SFS), Force Support Squadron (FSS), the Emergency Medical Consequence Management (EMEDS-CM)ADMIN, and the Contingency Response Group (CRG). in addition to the space requirements above this building will have a main entry vestibule, secured access, two stair wells, an elevator, locker rooms (on both floors) an arms vault, and warehouse/storage space. In addition, the 123 AW will need to alter/renovate the SVS/FSRT administration space (4,211 square feet) and the base dining facility (1532 square feet) which are currently located in Building 100 which is immediately adjacent to the new Response Forces Facility.
The supporting elements for this project for both facilities include: Utilities, Site Improvements, Pavement, Communications Support, Sustainability and Energy Efficiency Measures. These facilities will be designed as permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements. The facility shall be compatible with applicable DoD, Air Force, and base standards.

Project Location: Louisville

More Details

City of New Albany – 2020 Annual Street Paving & Repairs Project

City of New Albany – 2020 Annual Street Paving & Repairs Project

The project consist of milling, pavement patching, pavement placement, curb ramp
replacement, curb, sidewalk and driveway replacement, pavement striping, and other appurtenant work
associated with pavement improvements to various streets throughout the City.

Project Location: New Albany, Indiana

More Details

Mt. Sterling Water & Sewer – WTP Effluent Rehabilitation Project

Mt. Sterling Water & Sewer – WTP Effluent Rehabilitation Project

Mt. Sterling Water and Sewer (Mt. Sterling) is accepting bids to repair a soil slide near the
Howard’s Mill Water Treatment Plant (Mt. Sterling) along Slate Creek. This project consists of
soil remediation, installation of gabion baskets, replacement of a head wall, reconstruction of a
decantdrain, etc.

Project Location: Mt. Sterling, Kentucky

More Details

RFB-207-20 Jefferson Davis Monument Elevator Repairs Ph 2

RFB-207-20 Jefferson Davis Monument Elevator Repairs Ph 2

Estimate:
$357,475.00
Estimated Length of Project:
112 (Substantial Completion) + 21 (Final Completion)

The project will include renovations/replacement to elevator equipment at the Jefferson Davis Memorial in Fairview, KY, including but not limited to replacement of the elevator controller, motor, hoisting machine, and associated wiring and connections to the existing car. Structural steel framing will be added to support an elevated slab and miscellaneous steel supports will support elevator equipment. New electrical work to support the elevator renovations and temporary removal/reinstallation of mechanical HVAC split-systems that serve the elevator machine room space is also included in the project.

Project Location: Fairview

More Details

Georgetown Municipal Water and Sewer Service – WWTP #2 Sludge Processing Upgrades

Georgetown Municipal Water and Sewer Service – WWTP #2 Sludge Processing Upgrades

Project consists of upgrades to the sludge processing building
including but not limited to 2 new screw presses, 3 new macerators, 3 new sludge pumps, building
modifications, process piping, electrical, instrumentation/control work and all related
appurtenances

Project Location: Georgetown, Kentucky

More Details

City of Bardstown – Parkway Drive Water Main Extension Phase 1

City of Bardstown – Parkway Drive Water Main Extension Phase 1

The City of Bardstown will be accepting bids to install approximately 795 linear feet of 16’’ waterline and approximately 386 linear feet of 8’’ waterline, including a 264 feet bore across the
Bluegrass Parkway.

Project Location: Bardstown, Kentucky

More Details

Edmonson County Board of Education – Various Projects – Phase 2

Edmonson County Board of Education – Various Projects – Phase 2

The project scope includes access control, surveillance, and intercom upgrades at
South Edmonson and Kyrock Elementary Schools, Edmonson County 5-6 Center, Edmonson County
Middle School and Edmonson County High School, as well as upgrades to the High School site
lighting. Additionally, the project includes roof top mechanical unit replacement and repairs at
Edmonson County High School and exterior unit replacement at Edmonson County 5-6 Center. Water
fountains and bottle filling stations are to be added to South Edmonson and Kyrock Elementary
Schools, Edmonson County 5-6 Center, Edmonson County Middle School and Edmonson County
High School as a bid alternate. Project also includes adding doors to existing frames at the 5-6 Center
gymnasium for security.

Project Location: Brownsville & Smiths Grove, Kentucky

More Details

EKU 138-20 Kit Carson Sewer Line

EKU 138-20 Kit Carson Sewer Line

Eastern Kentucky University (EKU) hereby requests sealed bids for the materials, supplies,
equipment or services set forth herein, subject to all conditions outlined in this Bid Package

Project Location: Richmond, Kentucky

More Details

UK-2069-20 PAV HA Elevators 14 & 15 Renovations

UK-2069-20 PAV HA Elevators 14 & 15 Renovations

This request for Proposal (RFP) is issued by University of Kentucky to select an offeror and product
for the renovation of Elevators #14 and 15 to support the Chandler Medical Center Main Hospital
and Critical Care Center located in Lexington, KY. This is a full renovation of the elevators as
described in the drawings and specifications provided. The offeror is responsible for providing the
University of Kentucky with a complete turnkey solution.

Project Location: Lexington, Kentucky

More Details

Spencer County Board of Education – Combination Bid-Bid Package C

Spencer County Board of Education – Combination Bid-Bid Package C

Bid Package C: SPENCER COUNTY BOARD OF EDUCATION

Project Location: Taylorsville, Kentucky

More Details

WKU-10243 JOC for HVAC

WKU-10243 JOC for HVAC

The Contractor shall be required to furnish all labor, materials, supplies, equipment, permit, bonds, and
supervision, and anything else required to complete the projects. The University reserves the right to
furnish materials, supplies, and/or equipment when evaluated to be in the best interest of the
University. It is the intent of this bid to establish a minimum of three (3) contracts which will provide for
everything required to perform work and related services as needed by WKU. There shall be no
guarantee of any quantities of work, only what shall be needed.

Project Location: Bowling Green, Kentucky

More Details

City of Bardstown – John Rowan Boulevard Sidewalk

City of Bardstown – John Rowan Boulevard Sidewalk

Construct a sidewalk along KY 245 (John Rowan Boulevard) beginning near the US 62
(Bloomfield Rd) intersection and extending west to the west side of the US 31E intersection, a
distance of 4837 feet. Project may include two (2) an ADD ALTERNATE BID segments to
extend the project from (1) the west side of the US31E intersection to the west side of Padget
Way and (2) west side of Padget Way to Chambers Boulevard.

GEOGRAPHIC COORDINATES:

  LATITUDE N37° 49′ 17.88″
  LONGITUDE: W85° 26′ 42.70″

Project Location: Bardstown, Kentucky

More Details

CCK-2480-20 Renovate Shell Space for UK Hospital Pharmacy

CCK-2480-20 Renovate Shell Space for UK Hospital Pharmacy

Project to renovate the existing UK Hospital PAV A Retail Pharmacy. Project will be multiple
phases and will consist of a total fit up a current shell space, repurposing an existing space
and modifying the front of the Pharmacy to better fit its needs. Trades included will consist of
finishes, mechanical, electrical, fire protection, etc. as per design and specification
documents. Project to be completed in coordination with UK Facilities and Project Managers
as well as any UK system(s) to be integrated.

Project Location: Lexington, Kentucky

More Details

RFB-202-20 KY Exposition Center Lot C

RFB-202-20 KY Exposition Center Lot C

Estimate:
$2,715,819.00
Estimated Length of Project:
60 (Substantial Completion) + 15 (Final Completion)

The project is to fill the existing turf Lot C at the Kentucky Exposition Center, to level the lot out for event use. There is an existing borrow site near Lot C to be used for fill material. The borrow site material is composed primarily of spoils from roadway and utility projects, with some minor rock and concrete material that may also be used as fill. The Owner will provide a Geotechnical Testing Agency to review material; however, the majority of the lot will be turf and it is anticipated that all material in the borrow site will be useable for this purpose.
The project scope includes site clearing and minor demolition, erosion control, storm drainage work, earthwork, asphalt paving, concrete paving, sod and hydroseeding.

Project Location: Louisville

More Details

CCK-2479-20 Improve Clinical / Ambulatory Services Cancer Services BP#3

CCK-2479-20 Improve Clinical / Ambulatory Services Cancer Services BP#3

Renovate 1st floor of the Ben Roach Building, Renovate Whitney Hendrickson 2nd floor
dipensing pharmacy, Renovate Pharmacy at PAV H 2nd Floor, Renovate/Installation of
PET/CT Suite in PAV H Basement
***ALTERNATE.

Project Location: Lexington, Kentucky

More Details

Stanton-Powell County Airport – Realignment of Perimeter Fence and Gate

Stanton-Powell County Airport – Realignment of Perimeter Fence and Gate

The scope of this project includes installation of approximately 540 lft of 6
ft tall chain link security fence, one 28 ft long by 6 ft tall electric slide gate with gate operating
system, electrical power and control to new slide gate, one 40 ft manual double swing vehicle
gate, removal and replacement of approximately 80 lft of damaged 6 ft tall chain link fencing,
removal and replacement of one damaged bollard, pavement marking of a revised
taxiway/taxilane centerline, site restoration, and miscellaneous incidental work items to provide
a complete and functional product .

Project Location: Stanton, Kentucky

More Details