Uncategorized

RFB-78-21 Russellville Armory Roof Replacement

RFB-78-21 Russellville Armory Roof Replacement

Estimate:
$307,900.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

Project includes the demolition of the existing built-up-roof membrane, copings, flashings, scupper boxes, downspouts, and accessories and the new installation of a SBS Modified Bitumen Roof with replacement copings, flashings, scupper boxes, downspouts and accessories for a complete roofing system.

Project Location: Russellville

More Details

City of Winchester – Lincoln Street Public Facilities Project

City of Winchester – Lincoln Street Public Facilities Project

The scope of work includes construction of asphalt roadway, curb and gutter, sidewalk, drainage, sanitary sewer, water, and temporary erosion control. The project is located along Lincoln Street from Hickman Street to Flanagan Street

Project Location: Winchester, Kentucky

More Details

RFB-77-21 WHFRTC Fire Station Addition

RFB-77-21 WHFRTC Fire Station Addition

Estimate:
$1,624,700.00
Estimated Length of Project:
240 (Substantial Completion) + 30 (Final Completion)

The project is the construction of a fire station and apparatus bay to an existing apparatus bay for use of the Wendell H. Ford Regional Training Center Fire/Rescue Department. The work is the construction of 4,357 square feet, single-story masonry building for the business and residential uses and the construction of 2,668 square feet, single-story masonry building for apparatus storage. The new construction will be constructed adjacent to the existing apparatus bay. The project materials include concrete, masonry, structural steel, steel trusses, metal roofing panels, doors and windows, finishes, specialties, plumbing, mechanical, electrical and site work.

Project Location: Greenville

More Details

RFB-76-21 MATES Bldg HVAC Repairs

RFB-76-21 MATES Bldg HVAC Repairs

Estimate:
$215,430.00
Estimated Length of Project:
90 (Substantial Completion) + 30 (Final Completion)

The project involves the complete removal of the four existing rooftop units and installing four new rooftop HVAC units with adaptive roof curbs, adding the four new units to the existing DDC control system. This project will also change the existing monition detection systems in the restrooms to control the room lights and exhaust fans thru the existing DDC control system. Electrical contractor to furnish and install the new monition detector, power supplies, relays and cabling back to the existing DDC control panel. This project has an allowance of $36,000.00 to expand the existing DDC control system to add the controls of the four new rooftop units, the existing Break Room rooftop unit and the restroom lights and exhaust fans control with graphics.

Project Location: Fort Knox

More Details

London Utility Commission – Waterworks Road and KY 1006 Waterline Replacement

London Utility Commission – Waterworks Road and KY 1006 Waterline Replacement

The scope of work includes the installation of approximately 4,632 LF of 6-inch DI waterline,
1,124 LF of 3-inch HDPE waterline (directional drill), 386 LF of 2-inch PVC waterline, 35 LF of
16-inch encasement pipe (bore and jack), 5 fire hydrant assemblies, and related appurtenances.

Engineer’s Estimate = $375,000

Project Location: London, Kentucky

More Details

Housing Authority of Elizabethtown – Gutters

Housing Authority of Elizabethtown – Gutters

The project consists of:
Gutters

Project Location: Elizabethtown, Kentucky

More Details

5029 Lea Ann Way Bank Repair Project

5029 Lea Ann Way Bank Repair Project

Be Advised that the Bid Opening Date has been changed to October 1, 2020 at 10:30

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty Street, Louisville, Kentucky 40203 for the construction of the 5029 Lea Ann Way Bank Repair Project Contract No. 2021-005, Budget ID No. C19099, will be received at the office of MSD until 10:00 a.m., Local Time, September 24, 2020, and will be publicly opened and read at that place and time.

Description and location of Project: This project includes a modular wall installation along the creek bank located behind 5029 Lea Ann Way in Metro Council District 24. All work shall be done in accordance to MSD’s Standard Specifications.

There will be no pre-bid meeting held for this project.

The Engineer’s Construction Cost Estimate for this project is between $ 50,000.00 and $100,000.00.

The bid documents will be available on, September 3, 2020, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.

Persons wishing to view the bid documents may do so online at www.msdbids.com or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Joseph S Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer Barry Pickett at Barry.Pickett@louisvillemsd.org.. Questions received less than two days prior to the date for opening of bids will not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

The Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms).

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Barry Pickett at Barry.Pickett@louisvillemsd.org. Due to the current Coronavirus (COVID-19) pandemic measures, MSD will be hosting a Teleconference call in the place of a face-to-face public opening. MSD will also post the As-Read Bid Summary as soon as available. To take part in the Bid Opening Teleconference Call, please call 502-654-8113 and enter code 754901288.

MSD SUPPLIER DIVERSITY PROGRAM: No

The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If applicable, the goals are as follows:

18.0% MBE – African American, 2.0% MBE – Asian-Indian American and

15.0% WBE – Caucasian Female participation respectively required for this project.

MSD BID DISCOUNT: Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: X
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville

More Details

UK-2098-21 Design/Build Agriculture & Office Buildings for UK Poultry Research Farm

UK-2098-21 Design/Build Agriculture & Office Buildings for UK Poultry Research Farm

Design/Build Agriculture & Office Buildings for
UK Poultry Research Farm

Project Location: Lexington, Kentucky

More Details

CC-339B-21 Curris Center Boiler Replacement Project

CC-339B-21 Curris Center Boiler Replacement Project

The project consists of the replacement of two steam boilers and water heaters with two condensing boilers,
two instantaneous condensing water heaters, tanks and accessories. The project also includes the replacement
of kitchen kettles and a dish machine.

Project Location: Murray, Kentucky

More Details

Richmond Utilities Board – Silver Creek Pump Station and Force Main

Richmond Utilities Board – Silver Creek Pump Station and Force Main

The work to be bid is described as follows:

CONTRACT 170-20-104
Silver Creek Pump Station and Force Main—Perform work at the Silver Creek
Wastewater Treatment Plant site to decommission the treatment and discharge point.
Install a new 1,565 gpm pump station to discharge to the new Silver Creek Force Main.
Install approximately 14,500 L.F. of 18-inch PVC force main.

Project Location: Richmond, Kentucky

More Details

12610 Old Henry Road Restoration Project

12610 Old Henry Road Restoration Project

Description and location of Project: The scope of work shall include dirt removal and topsoil installation along the easement located at the rear of 12610 Old Henry Road, in Metro Council District 19. All work shall be done in accordance to MSD’s Standard Specifications.

Project Location: Louisville, Kentucky

More Details

Menifee County Board of Education – Menifee County High School Minor Renovations

Menifee County Board of Education – Menifee County High School Minor Renovations

Project consists of furnishing all labor and materials to complete the:
Menifee County High School Minor Renovations

Project Location: Frenchburg, Kentucky

More Details

Housing Authority of Versailles – Window Replacement

Housing Authority of Versailles – Window Replacement

The work to be performed consists of:

 A. Window Replacement

Project Location: Versailles, Kentucky

More Details

Housing Authority of Versailles – Concrete

Housing Authority of Versailles – Concrete

The work to be performed consists of:

 A. Concrete Sidewalk and Dri Replacement
 B. Handrail replacement at sidewalk stairs.

Work includes providing all items, articles, materials, operations or methods herein listed, mentioned
or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.

Project Location: Versailles, Kentucky

More Details

City of Bardstown – Peracetic Acid Disinfection System Improvements

City of Bardstown – Peracetic Acid Disinfection System Improvements

Project consists of improvements to its peracetic acid disinfection systems at the
Town Creek Wastewater Treatment Plant located on Gilkey Run Road and the Jerry L. Riley Wastewater
Treatment Plant located on Sutherland Lane.

Project Location: Bardstown, Kentucky

More Details

CCK-2095-21 Construction Management Services to Renew / Modernize Frazee Hall – 2511.8

CCK-2095-21 Construction Management Services to Renew / Modernize Frazee Hall – 2511.8

Project consists of Construction Management Services to Renew/Modernize Frazee Hall

Project Location: Lexington, Kentucky

More Details

WKU-10254 JOC – General Contractor

WKU-10254 JOC – General Contractor

Western Kentucky University is seeking Job Order Contract-General Contractor Firms for consideration
for multi-year agreement.


This bid has been canceled and will be re-bid in the next few days. Thank you for your patience and interest in Western Kentucky University

Project Location: Bowling Green, Kentucky

More Details

RFB-71-21 Mobility Operations Urban Terrain (MOUT) Site Enhancement

RFB-71-21 Mobility Operations Urban Terrain (MOUT) Site Enhancement

Estimate:
$1,736,660.00
Estimated Length of Project:
390 (Substantial Completion) + 30 (Final Completion)

The primary scope of work includes complete construction of three (3) concrete masonry buildings, three (3) pre-engineered metal buildings and associated site improvements on one (1) site located on the Harold L. Disney Training Site (HLDTS) in Artemus, Knox County, Kentucky.
Site improvements include site striping, rough and finish grading to provide building pads and roadway within the project site. Roads are to be surfaced with DGA. Utilities are limited to minimal storm drainage, building associated improvements.
Building construction includes construction of one and two story concrete masonry buildings with poured concrete footings and foundations, ground supported slabs and precast concrete intermediate floor and roof decks. Roof construction is precast deck with elastomeric coating and concrete fill or wood truss with OSB sheathing and metal roofing panels as shown. Pre-engineered buildings are one story construction with metal siding and roofing. Framing members are girts or purlins as appropriate. Interior non-structural partitions are wood frame with OSB sheathing each side. Window openings are to be wrapped with treated wood or metal surrounds. No windows are to be installed. Doors are to be hollow core wood with field fabricated wood frames and grade 3 hardware. Building construction includes porches, stoops, handrails and guardrails as shown.

Project Location: Artemus

More Details

RFB-57-21 Scenic Lake Dam – Phase II

RFB-57-21 Scenic Lake Dam – Phase II

Estimate:
$3,033,560.00
Estimated Length of Project:
291 (Substantial Completion) + 30 (Final Completion)

The Work of Project is defined by the Contract Documents and consists of the following main activities:
1. Widening of the dam’s crest.
2. Construction of the downstream embankment blanket drain and toe drain systems.
3. Flattening of the dam’s downstream embankment.
4. Existing spillway modifications to new low level outlet.
5. Construction of new low level outlet gates and conduit grouted in existing 66” CMP.
6. Construction of new baffled chute spillway.
7. Grouting existing low level outlet pipe and backfill concrete in existing tower.
8. Installation of erosion prevention and sediment control measures

Project Location: Henderson

More Details

City of Jenkins – Left Fork Marshall Branch Waterline Extension

City of Jenkins – Left Fork Marshall Branch Waterline Extension

Work is to include the installation of 4″ & 3″ waterlines, a 2″ service meter and other water
appurtenances,

Project Location: Jenkins, Kentucky

More Details

Garrard County Board of Education – Camp Dick Robinson Elementary School Bus Canopy Additions

Garrard County Board of Education – Camp Dick Robinson Elementary School Bus Canopy Additions

Project consists of construction of a new pre-engineered metal canopy over
the bus drop off / pick up loop located on the north façade of Camp Dick Robinson Elementary
School.

Project Location: Lancaster, Kentucky

More Details

CCK-2502-21 Replacement of Steam and Condensate Piping to Pence Hall

CCK-2502-21 Replacement of Steam and Condensate Piping to Pence Hall

University of Kentucky – Pence Hall (Building# 0041). The contractor will be required to
demolish, remove and replace the existing steam and pumped discharge piping (and all
associated materials/equipment) entering Pence Hall Mechanical Room through the utility
tunnel to the manhole outside of Pence Hall.

Restore all existing site conditions back to their original condition. This includes plantings,
lights, asphalt, concrete, grass, etc.

Project Location: Lexington, Kentucky

More Details

City of Jenkins – Waterline Improvement Project Phase 5

City of Jenkins – Waterline Improvement Project Phase 5

Construction including but not limited to the installation of:
Approximately 8,550 LF of 6-inch, 10,000 LF of 4-inch and 2,500 LF of 2-inch waterlines
with 80 LF of 8″ HDPE directionally drilled creek/river crossings and other
appurtenances, and 159 water service connections.

Project Location: Jenkins, Kentucky

More Details

KCEOC – Work Ready Training Center – Phase I

KCEOC – Work Ready Training Center – Phase I

Project consists of furnishing all labor and materials to complete
Phase I Bid Packages for the KCEOC – WORK READY TRAINING CENTER

Project Location: Barbourville, Kentucky

More Details

City of Falmouth – Wet Weather Detention Basin – Contract 1

City of Falmouth – Wet Weather Detention Basin – Contract 1

The Project consists of constructing:

• Contract I – 2M Gallon Wet Weather Detention Basin including pump station, piping,
controls, integration and other miscellaneous items

Project Location: Falmouth, Kentucky

More Details

Subscribe