University’s Richmond Campus. The work includes furnishing all labor, materials, equipment and services necessary for
the complete project including all items as indicated.
Louisville Water Company is requesting Bids for the supply and install of a total of 510 LF of water main, including supply and install of 440+/- linear feet of eight (8)-inch DR-18 C900 PVC water main water main and 70+/- linear feet of eight (8)-inch Pressure Class 350 ductile iron water main using traditional trench installation techniques. Fire hydrant removal, main cut and plugs, and restoration on and along Project Limits as stated above shall be included. Contractor shall supply and install all materials required for the completion of this project.
Questions or inquiries relating to this project must be submitted through the Louisville Water Company web-based portal by the date and time indicated for this bid.
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $100,001 – $250,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is not required.
Bids will only be accepted from Bidders who are Louisville Water Small Business Equity (SBE) Program Participants and have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in all the following categories: 4″ – 16″ Ductile Iron Water Mains and 4″ – 16″ PVC Water Mains. For information about the Louisville Water SBE Program or pre-qualification, contact the Company through the designated bid portal.
Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com
The Department of Juvenile Justice owns and operates a 39,000 sq.ft. detention facility in Fayette County at 3475 Spurr Road. Since original construction in 2006, various HVAC replacements and repairs have occurred as needed, most recently an Energy Savings Performance Contract (ESPC) project by Noresco. An additional repair replaced approximately half of the VAV box controller with Bacnet devices, leaving the other half requiring an integrator and beyond the expected operating life.
The main building controller, a Tridium Niagara JACE is a model and version that is no longer supported by the manufacturer and will be replaced under this project. The JACE is located in the mechanical room office. This project will provide a new JACE of a supported model and version of Tridium Niagara and replace the 25 proprietary VAV controllers to a BACnet-type device.
Green County Board of Education – ATC Welding Lab Expansion
Green County Board of Education – ATC Welding Lab Expansion
Separate sealed bids for the construction of: General contract work for interior renovation to expand existing welding lab into adjacent storage room including: demolition, masonry, electrical/power, lighting, HVAC, fume hood with duct, and finishes,
A general summary of work includes restoration of existing masonry, replacement of exterior windows with new windows meeting Unified Facilities Criteria for Anti-Terrorism Force Protection measures along with reinforcement and strengthening of window openings, and new mechanical, electrical and plumbing systems. A partial reroofing of existing SBS Modified Bitumen Roof System performed by Owner’s Roofing Contractor.
LaRue County Board of Education – Hodgenville Elementary School ARP ESSER HVAC Renovation
LaRue County Board of Education – Hodgenville Elementary School ARP ESSER HVAC Renovation
The project scope includes replacement of a water source heat pump HVAC
system including cooling tower, electric boilers, heat pumps throughout the building, hydronic loop
pumps and associated mechanical equipment. The project scope also includes updating the DDC
controls system.
This project is intended to provide new interior finishes to the cafeteria space and west corridor of the existing Chestnut Hall building on the JCTC campus in downtown Louisville. The expected outcomes of these changes are as follows:
1. New resilient flooring and wall base in the cafeteria, adjacent atrium space and adjoining west corridor of Chestnut Hall. This west corridor connects the main traffic flow from the cafeteria space to the existing Multi-Cultural Center.
2. New ceiling grid and tile, new lighting and new paint finish in the corridor space.
3. The existing ceiling grid and tile to be removed in the cafeteria space in lieu of exposed (painted) structure with selective areas to have “floating”ceiling treatments to creative distinctive and more intimate spatial zones of the cafeteria area.
4. The existing fire sprinkler and HVAC ductwork in the cafeteria area will be re-worked as required to adhere to fire protection codes and to install new HVAC diffusers more appropriate to the new design. New lighting will be installed in the cafeteria space.
5. In addition to new paint finishes on walls in the project area, select areas designated for painted murals to be completed in collaboration with JCTC staff and administration.
The project consists of an interior renovation of the existing building. The renovation will include the
demolition and reconstruction of new latrines. A portion of exterior wall will be demolished and rebuilt
up with similar type construction for stability. Blast rated storefront, all doors and windows throughout
the building are to be replaced. Roller window shades will also be installed in occupied window spaces
(offices, classrooms). New hollow metal doors, frames, and new door hardware. Interior finishes
including ceiling grids, wall paint, ceramic tile, and carpet are to be replaced as well as concrete floors
to be polished and refinished. Spaces will be renovated and placed into existing spaces ie. Computer
lab, classroom, platoon leader office, and recruiter office to accommodate needs of the unit. Structural
repairs and remediations will occur throughout the building. Installation of storage lockers is included
in the project. Improvements to building mechanical systems including plumbing, heating, ventilation,
and air conditioning. Renovations to building electrical systems including power, lighting,
communications, safety, and overall security systems. Project includes the replacement of (3) existing
HVAC split systems with the addition of a new split system. Air handlers shall have new controls
installed. All plumbing fixtures in the main restrooms will be replaced and a new natural gas fired
water heater will be added to serve the new showers. The building will receive new data wiring
throughout due to the relocation of the existing I.T. room. LED light fixtures will take the place of
existing fixtures in a one-for-one replacement renovation throughout the entire building, including
exterior lighting. New light fixtures will be installed in the new restrooms and computer lab areas.
Replace the existing condensing boilers with new condensing boilers. Includes new combustion air ducts, and flue ducts, and boiler circulating pumps.
New boilers to be monitored/enabled via the existing Automated Logic Building Management System.
Mayfield Graves County Airport Board – Airfield Overlay and Apron Expansion Project
Mayfield Graves County Airport Board – Airfield Overlay and Apron Expansion Project
Project consists of furnishing all labor, materials and equipment and performing all work necessary for Airfield Overlay and Apron Expansion Project at the Mayfield Graves County
Airport
West Shelby Water District – Ardmore Crossing Phase 4A Waterline Extension
West Shelby Water District – Ardmore Crossing Phase 4A Waterline Extension
This contract consists of installing approximately 550 L.F. of 8” PVC, SDR-21 waterline,
1,950 L.F. of 6” PVC, SDR-21 waterline, and all other necessary appurtenances.
Jackson Independent Board of Education – Jackson Independent Schools – Miscellaneous Renovations & Addition
Jackson Independent Board of Education – Jackson Independent Schools – Miscellaneous Renovations & Addition
This project consists of the replacement of rooftop HVAC units serving the
Gymnasium and Gym Lobby, renovation of the current FMD classroom into the Administrative
Offices. An addition will be constructed on the front of the school to accommodate a secure vestibule,
waiting area and reception office.
Louisville Water Company is requesting Bids for the supply and installation of air release valve assembly and vault on 20″ PCCP plant residuals line. Requires PCCP Wet-Tap. Contractor shall supply and install all materials required for a complete project.
Questions or inquiries relating to this project must be submitted through the Louisville Water Company web-based portal by the date and time indicated for this bid.
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $50,001 – $100,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is not required.
Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in 24” – 60” Prestressed Concrete Water Mains or Heavy Construction – Plant Work Categories. For information about pre-qualification, contact the Buyer listed above.
Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.