HSIP 5160 (014): WADDY-PEYTONA ROAD (KY 395) AT I-64 REALIGN AND CONSTRUCT LEFT TURN
LANE AT THE ENTRANCE OF FLYING J TRUCK STOP, A DISTANCE OF 0.37 MILES. GRADE &
DRAIN WITH ASPHALT SURFACE.
SYP NO. 05-00997.00.
HPP 0142 (009): MASON GAP ROAD (KY 698) CURVE REALIGNMENT, WIDENING AND
RECONSTRUCTION OF KY 698 JUST SOUTH OF STANFORD, A DISTANCE OF 0.14 MILES. GRADE &
DRAIN WITH ASPHALT SURFACE.
SYP NO. 08-00141.00.
APD 0806 (033): PIKEVILLE-VIRGINIA STATE LINE ROAD (US 460) US 460-KY80 FROM BEAVER
CREEK STATION TO THE VIRGINIA STATE LINE (SECTION 8B), A DISTANCE OF 1.84 MILES.
GRADE & DRAIN.
SYP NO. 12-00263.82.
CM 8120(39): DIXIE HIGHWAY (US 25) CONSTRUCT A RIGHT TURN LANE ON US25(DIXIE
HIGHWAY) AT THE DUDLEY ROAD INTERSECTION TO IMPROVE TRAFFIC FLOW. ASPHALT SURFACING
NEW CONSTRUCTION.
SYP NO. 06-00363.00.
STPR 4601(030): GEORGETOWN ROAD (US 460) RECONSTRUCT US 460 WEST OF GEORGETOWN TO
ELIMINATE ‘S’ CURVE 0.2 MILES WEST OF CANE RUN ROAD. GRADE, DRAIN & SURFACE WITH
BRIDGE.
SYP NO. 07-00344.00.
Program Modifications Hager Hill Campus, Big Sandy Community & Technical College
RFB-196-11
Prestonsburg, Kentucky
The scope of this project is to install HVAC shop equipment in the new Hager Hill shop location. The Owner will move existing equipment, as scheduled on the drawings, from their existing shop to their new shop location on the Hager Hill Campus. The Contractor will move the equipment within the room into locations shown on the drawings and provide utility connections to the equipment, as indicated on the contract documents, to make it operational. Existing building utilities will be used.
RE-AD OF RFB-153-11 HVAC Upgrades Building, BG Tech College Leestown Campus, 164 Opportunity W
RFB-195-11
Lexington, Kentucky
HVAC and controls upgrade and replacement for Building C of Bluegrass Community and Technical College – Leestown Campus. HVAC scope includes replacement and addition of air handling units, sheet metal and piping as well as start-up and training. Controls scope includes controllers, control devices, and instrumentation as well as wiring, programming, start-up and training.
This project consists of Drainage, tree trimming/removal, additional parking, water valves, hose bibs, TV & Cable outlets, gutter guards, and exterior stair replacement.
Sealed Bids in triplicate for furnishing all labor and materials and performing all work complete for New Cooling Tower Support for Medical Center Stream & Chilled Water Plant
The project involves the development of approximately 150 acres for recreational use, including baseball, softball, soccer, and football fields and their associated utilities, building and roadways. The project is being procurred in multiple phases. The construction manager on the project is Jenkins-Essex Construction, contact Danna Monroe 270-765-6301. Bid Phase 5 B packages: 21) synthetic infill turf system; 35) Building specialities (Supplier Only); and 38) Grandstands, Press Boxes and Bleachers.
The program of work for which bids are to bids are to be submitted consists of approximately 6200 L.F. of 10-inch & 8-inch gravity sewer by pipe bursting method, including all related appurtenances as shown on the drawings and specifications for th Contract No. 4 Sanitary Sewer System Rehabilitation for the City of Hardinsburg, Kentucky.
Site KY 72 001 Hillview 1. Removal and Replacement/Reinstallation of existing entry doors 2. Paint, caulk, trim and installation of new Hardware 3. Install new sewer line Site KY 72 002 Hyacinth Village Bid Alternate No 1 1. New entry doors and hardware
Base bid Site KY 099 001 A. New HVAC Units, B. New poured in place concrete pads for condensing units, C. New GFIC outlet installed near condensing units. D. New duct work installed iwth new air returns. E. Cosntruct chase from teh first floor to the second floor for the return air. F. Infill existing floor diffusers, G. Install new Konecto flooring over existing VCT. H. Install new quarter round at existing wood base Alternate no 1 site ky 099 001 Unit Conversion a. convert 5 Bedroom unit to a 1 bedroom unit and a 2 bedroom unit new entry door and porch, new kitchen for 2 bedroom unit, rework mechanical, plumbing and electrical systems, new doors and walls as needed, new second floor deck, new mechanical system, new window in kitchen area, new roof on builidng and porch, new knoecto flooring in both units, paint units.