Author Archive

111323 Christian County Call 103

CALL 103 CONTRACT ID 111323
CHRISTIAN COUNTY
PLHD 8910 (004): COLE ROAD (CR 1150) WIDEN COLE ROAD (CR 1150) FROM FORT CAMPBELL
BOUNDARY GATE 7 TO US41A, A DISTANCE OF 1.11 MILES. GRADE & DRAIN WITH ASPHALT
SURFACE.
SYP NO. 02-00174.00.
Click Here to Order

111033 Hickman County Call 106

CALL 106 CONTRACT ID 111033
HICKMAN COUNTY
BRZ 0103(276): WATER STREET (CS 7959) REPLACE BRIDGE AND APPROACHES AT BRANCH OF
CANE CREEK ON WATER ST. 300 FT. SOUTH OF DEPOT ST. IN CLINTON. GRADE & DRAIN WITH
INCIDENTAL SURF.
SYP NO. 01-01007.00.
Click Here to Order

111032 Boone County Call 105

BOONE
CALL 105 CONTRACT ID 111032
BOONE COUNTY
STPM 8200(013): LIMABURG-HEBRON ROAD (KY 237) PAVEMENT REHABILITATION ON KY-237 IN
BOONE COUNTY FROM MP 6.635 TO MP 9.687. ASPHALT REHAB WITH GRADE & DRAIN.
SYP NO. 06-00405.00.
Click Here to Order

111030 Franklin County Call 305

FRANKLIN COUNTY
CALL 305 CONTRACT ID 111030
FRANKLIN COUNTY
BC61 037 FFT AIRPORT: CAPITAL CITY AIRPORT AIRPORT APRON EXPANSION AT THE CAPITAL
CITY AIRPORT. GRADE & DRAIN WITH ASPHALT SURFACE.
Click Here to Order

111029 Jefferson County Call 300

JEFFERSON COUNTY
CALL 300 CONTRACT ID 111029
JEFFERSON COUNTY
JL03 056 0264 005-008: SHAWNEE EXPRESSWAY (I-264) INSTALL SOUND BARRIER ON THE NORTH
SIDE OF I-264 FROM GARRS LANE TO DIXIE HIGHWAY. SOUND BARRIER WALL.
SYP NO. 05-08508.00.
Click Here to Order

City of Mt. Sterling Firestation

City of Mt. Sterling Firestation

Construction of the New Fire Station of City of Mt. Sterling, including, but not limited to: earthwork, rock and aggregate excavation, fill and compaction; masonry brick; sidewalks, concrete foundations, curbs and floor slabs; storm and subgrade drainage; pre-engineered structural frame and building construction; asphalt paving; landscaping; mechanical and electrical services and HVAC as set forth by the plans and specifications

Mt. Sterling, Kentucky

Click Here to Order

Robertson County School

Robertson County School

Construction of the new Robertson County School in Mount Olivet, Kentucky.

Mount Olivet, Kentucky

Click Here to Order

Lift Station Improvements Project Lakewood Lift Station and Tollgate Lift Station

Lift Station Improvements Project Lakewood Lift Station and Tollgate Lift Station

The project consists of approximately 525 feet of 6-inch PVC SDR 21 force main, replace one existing lift station and appurtenances.

Flemingsburg, Kentucky

Click Here to Order

Casey County Schools Parking Lot Additions

Casey County Schools Parking Lot Additions

Parking Lot Additions

Liberty, Kentucky

Click Here to Order

2239.71 PCF Phase 1C Pavillion A Data Center

2239.71 PCF Phase 1C Pavillion A Data Center

This pacakge invloves the Interior Fit-Out work for the new Patient Care Facility Pavillion A Data Center. The work will be performed under contract with the Construction Manager, Turner Construction Company.

Lexington, KY

Click Here to Order

Ramp Expansion Phase 1A Pickaway Co Airport

Ramp Expansion Phase 1A Pickaway Co Airport

Circleville, OH

Click Here to Order

Contract 44 Mill Street Water and Sewer Line Relocation

Contract 44 Mill Street Water and Sewer Line Relocation

This project consists of approximately 425 feet of 6″ water line, and 400 feet of 8″ sewer line, and related facilities, for the City of Stanford Water and Sewer Department.

Stanford KY

Click Here to order

Runway Painting Pickaway Co Airport

Runway Painting Pickaway Co Airport

Circleville, OH

Click Here to Order

Snow Removal Equipment Pickaway Co Airport

Snow Removal Equipment Pickaway Co Airport

Circleville, OH

Click Here to Order

Obstruction Removal/South Approach Pickaway Co Airport

Obstruction Removal/South Approach Pickaway Co Airport

Circileville, OH

Click Here to Order

Robert Ratliff & Mike DeLong (AML) Reclamation Pro, 29th Annual Construction Grant

RFB-6-12
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on :
The Ratliff site consists of a large slide behind the Robert Ratliff and Ronnie Ratliff residences as well as small slide in front of the Ronnie Ratliff residence and three abandoned mine adits on the bench above the Ratliff residences. The large slide will be excavated and stabilized with four separate retaining walls. The walls will consist of one pile and lagging wall, one gabion wall and two free standing block walls. The small slide will be stabilized with a reinforced concrete wall. The three mine adits will be closed with 8¿ pipes and drained to a constructed subdrain with a 12¿ pipe. The subdrain will be constructed from the adits down the slope and under the pile and lagging wall to an installed dropbox below the pile and lagging wall. Drainage from the dropbox will flow into a new HPDE pipe which will carry runoff away from the residence. The road from the residences to the top of the bench will need to be upgraded with roadway stone and a guardrail.The DeLong site consists of drainage issues affecting the DeLong property. The drainage will be corrected by excavating the affected hillside and constructing a gabion retaining wall with a subdrain behind the wall as well as a rockcore subdrain in front of the wall. The drainage will be carried to an existing ditch in front of the property. For continued project description see Special Conditions

Johnson County, Kentucky

Click Here to Order

Caudill, Adams, Meade Group (AML) Reclamation Proj, 29th Annual Construction Grant

RFB-5-12
AML wishes to receive bids for the following areas:
1. Roger Caudill Slide and Portals: To arrive at this site, from Isom travel south on S.R. 15 to Rt. 1811. Turn left on Rt. 1811 and travel 1.4 miles to Cinnamon Road. Turn right on Cinnamon Road and travel 1.2 miles to the Caudill residence. N 37ºd 10¿ 30.3¿ W 82º 50¿ 17.0.
2. Kelvin Adams: To arrive at this site, from Isom take Rt. 15 south to a left turn onto Rt. 1148. Travel 1.5 miles and turn right on to Rt. 1811. Turn left on to Edgewood Drive. Take first driveway on the left to the first house. N 37º 10¿ 47¿ W 82º 51¿ 56¿.
3. Peggy Meade: To arrive at this site take Rt. 119 from Whitesburg to a left turn onto Rt. 805. Travel 3.0 miles to a left turn onto Rt. 317. Go 3.6 miles, the driveway is on the left. N 37º 13¿ 32.1¿ W 82º 42¿ 43.5¿.
For continued project description see Special Conditions.

Letcher County, Kentucky

Click Here to Order

Engineer Section Office ( Henderson), Transportation Cabinet

RFB-3-12
The work consists of a new one story, 2000 square foot office facility with reception room, large work room, private offices, toilets, mechanical and custodial rooms.

The building is slab-on-grade with wood framed walls. Materials include metal siding, asphalt shingles, double hung windows, hollow metal doors and frames, flush wood solid core doors, gypsum board, vinyl composition tile and acoustical lay-in ceiling panels.

Henderson, Kentucky

Click Here to Order

City Of Jackson Contract 2 Water Storage Tank

City Of Jackson Contract 2 Water Storage Tank

Water Storage Tank

Jackson, KY

Click Here to Order

City Of Jackson Water Storage Tank Contract 3 Waterline Pump Station

City Of Jackson Water Storage Tank Contract 3 Waterline Pump Station

City Of Jackson Water Storage Tank Contract 3 Waterline Pump Station.

Jackson, KY

Click Here To Order

#2430 Riverside Farnsley Moremen Roadway Project

#2430 Riverside Farnsley Moremen Roadway Project

To Furnish all labor, material, and necessary equipment for the Riverside Farnsley Moremen Roadway Project.

Louisville, KY

Click Here to Order

Franklin County Career & Techincal Center Addition and Renovation

Franklin County Career & Techincal Center Addition and Renovation

Sealed proposals are requested for a General Construction Contract for the new Additions and Renovations of the Franklin County Career and Technical Center.

Frankfort, KY

Click Here to Order

Bourbon County High School Improvements BP 2 Auditorium Addition

Bourbon County High School Improvements BP 2 Auditorium Addition

The project scope for this bid package consists of new 12,900 square foot auditorium addition to the existing Bourbon County High School.

Paris KY

Click Here to Order

CCK-1778-12 Bradley Hall Elevator Addition & Renovation

CCK-1778-12 Bradley Hall Elevator Addition & Renovation

The intent of the project is to remove the existing metal stairs with conctret landings from the basement to the fourth floor to create a shaft fpr a new six stop elevator. The work will require penetration through the existing wood framed shingle roof for an elevator penthouse. A 5′ deep elevator pit and associated sump pit will be required at the basement level. The first step is to install a new door/frame at the first floor between the corridor and the south stair for egress. The existing north and south stairs will remain open at all times for building occupant egress. Asbestos abatement by UK. Relocation of fire alarm panels by UK. Staging area to be determined at Pre-Construction meeting.

Lexington KY

Click here to order

Bourbon County High School Improvements BP 3 Auditorium Seating

Bourbon County High School Improvements BP 3 Auditorium Seating

The project scope for this bid package consists of auditorium seating to be installed in the new auditorium addition at Bourbon County High School.

Paris, KY

click here to order

Subscribe