Author Archive

Robinson Forest Land Stabilization Project

Robinson Forest Land Stabilization Project

The construction of the gabion retaining wall and soil retaining wall and soil re-compaction in Robinson Forest, Clayhole KY.

Clayhole, KY

Click Here to View

Red River Wastewater Treatment Plant

Red River Wastewater Treatment Plant

Contract 584-09-02 Expansion of the Staton (to become Red River Wastewater Authority) wastewater treatment plant from a capacity of .045 million gallons per day to a capacity of 1.4 million gallons per day. the construction will include a new and upgraded influent pump station, new grit and screening facilities, new aeration basins, new clarifiers, new UV disinfection, new post aeration building, new sludge handling building with sludge press and a new administration building.

Powell Co, KY

Click Here to Order

Red River Wastewater Conveyance System

Red River Wastewater Conveyance System

Red River Wastewater Conveyance System Clay City to Stanton
Contract 584-09-01

Furnishing and installation of approximately 28,100 LF of 12-ince PVC force main and accessories.
Furnishing and installation, at various locations, of 20-inch steel cover pipe, bore, and accessories.

Powell Co, KY

Click Here to Order

Stonewall Elementary School

Stonewall Elementary School

The work includes the renovation of the existing school with new additions for a total of 78,176 SF. Teh existing school has approximately 60,588 SF and the additions have 17,588 SF – all part of a one-story building, though the existing Gymnasium flor is 3′-9″ lower than the main building floor elevations. Stonewall Elementary School was originally built in 1960 with major building additions in 1962, 1965, 1974, and 1979. The scope of work for this current major construction project includes, but is not limited to: selective and building demolition, removal and replacement of mechanical systems including installation of variable refrigerant volume systems, replacment of existing electrical systems, fire protection, fire alarm systems, interior finishes (walls, ceilings, floors, and base), door hardware, site improvements and paving, replacement of kitchen equipment and the addition of 17,588 SF of new administrative area, stage, interior ramped corridor connection to Gym, media center, classrooms and secondary entry vestibules. The work effort will be executed in four principal phases beginning in April/May 2012 and ending in December 2013. The building will be occupied during all phases of construction work.

Lexington, KY

Click Here to View

City of Munfordville Foodland Sewer Project

City of Munfordville Foodland Sewer Project

The work consists of installing 715 linear feet of 8-inch sewer, 7 property service connections, 4 manholes with castings, 1 drop manhole with casting and associated appurtenances. 78 linear feet of the 8-inch sewer pipe is to be installed in an existing steel casing pipe previously installed by another contract. This contract will provide the necessary spacers, bulk head, and appurtenant items necessary to complete the crossing

Munfordville, KY

Click Here to Order

RFB-169-12 HVAC Repairs White Hall State Historic Site

RFB-169-12
This project involves the removal of the seven (7) water source heat pumps and installing new units, installing a new salt free water softener, installing new DDC controls on new heat pumps and making an interface to existing electrical controls on existing heat pumps. Add to the existing DDC controls so Frankfort can see new heat pumps that are being installed and to interface with the existing heat pump systems.

Richmond, Kentucky

Click here to order

Colonnade Repairs

Colonnade Repairs

This project is repair of the Colonnade with will require expertise in stone/limestone repairs, concrete repairs, urethane membranes, and sealants.

Bowling Green, KY

Click Here to Order

Morgan Co Elementary School

Morgan Co Elementary School

The project scope includes a new elementary school approximately 65,000 square feet of new construction. The work must be substantially complete no later than June 30,2013.

West Liberty, KY

Click Here to View

RFB-168-12 Demolition and Site Utility Relocation

RFB-168-12
The project consists of the prepatory work to accommodate the new construction including the demolition of the existing Brockton Apartments, relocation of the storm line, relocation of the sanitary line and construction of new parking.

Richmond, Kentucky

Click here to order

Kroger A448

Kroger A448

This is for Sub-Contractors Only

This is for a “With-In-The-Wall” remodel.

Mason, OH

Click Here to Order

First Street Streetscape Renovation Phase 1 Re-Bid

First Street Streetscape Renovation Phase 1 Re-Bid

New sidewalks, curbs, drainage and landscaping and lighting from Bridge Street west to Anglin Avenue. The distance is approximately 0.18 miles. The City of Morehead will be performing the demolition work and the successful contractor will be required to coordinate thhese efforts with the city work forces.

Morehead, KY

Click Here to View

Pump Station Rehab City of Wurtland

Pump Station Rehab City of Wurtland

Rehabilitation of the Uhlens Branch and Virginia Street Sewer Pump Stations, including the removal of existing pumps and piping, installation of submersible pumps, guide rails, valve vault, piping, electrical work, controls, cleaning, by-pass plumbing and other incedental and related work necessary for completion.

Wurtland, KY

Click Here to View

UK Ben Roach Building Elevator #1 Jack Replacement

UK Ben Roach Building Elevator #1 Jack Replacement

Contractor to furnish labor and materials to replace the jack assembly on Elevator #1 in Ben Roach Buidling.

Lexington, KY

Click Here to View

Morehead Wastewater Treatment Plant Sludge Thickening Facility

Morehead Wastewater Treatment Plant Sludge Thickening Facility

The scope of work involves the construction of a metal building to house a pre-purchased rotary drum thickener system, sludge pump, polymer feed system, and related electrical and communications systems.

Morehead, KY

Click Here to View

122911 Jefferson County Call 200

CALL 200 CONTRACT ID 122911
JEFFERSON COUNTY
IM 0659(020)
JOHN F. KENNEDY MEMORIAL BRIDGE OVER OHIO RIVER
JEFFERSON COUNTY
FD52 056 0065 136-138: TENNESSEE- LOUISVILLE ROAD (I 65) BRIDGE OVER OHIO RIVER
(MP136.901) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00202N: I 64 EAST AND WEST TO I 65 NORTH BRIDGE OVER I 64 (MP5.444) .
BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00177N: NB EXIT RAMPS TO I-64 EB & WB BRIDGE OVER I-64 EB AND
WITHERSPOON ST. (MP5.459) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00176N: I 64 RAMP FROM I 65 SOUTH BOUND BRIDGE OVER I 64 (MP5.387) .
BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00178N: I 64 RAMP TO I 65 BRIDGE OVER I 64 EB & WITHERSPOON ST (MP5.
391) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0065 B00175N: TENNESSEE- LOUISVILLE ROAD (I 65) BRIDGE OVER I-64 EB& WB &
RIVER ROAD (MP136.506) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0065 4811-B: CLARKSVILLE- LOUISVILLE ROAD (I 65) BRIDGE OVER RIVERSIDE
DRIVE & MARKET ST. (MP0.108 INDIANA) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .

Click Here to Order

121302 Pike County Call 105

CALL 105 CONTRACT ID 121302
PIKE COUNTY
BRZ 1203 (340): BUCKFIELD ROAD (CR 1270) REPLACE BRIDGE OVER SHELBY CREEK 121 FEET
WEST OF KY 122, A DISTANCE OF 0.04 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE.
SYP NO. 12-01100.00.

Click Here to Order

121301 Pulaski County Call 101

CALL 101 CONTRACT ID 121301
PULASKI COUNTY
HSIP 0802 (002): KY 80 / KY 461 INTERSECTION RECONSTRUCTION OF KY 80 AND KY 461
INTERSECTION TO IMPROVE TRAFFIC FLOW FROM MP 27.82 TO MP 28.30, A DISTANCE OF 0.39
MILES. GRADE & DRAIN WITH ASPHALT SURFACE.
SYP NO. 08-00909.00.

Click Here to Order

121001 Pike County Call 102

CALL 102 CONTRACT ID 121001
PIKE COUNTY
APD 0806(040): PIKEVILLE-VIRGINIA STATE LINE ROAD(US-460) SURFACING ON US-460/KY-80
FROM GREASY CREEK TO KY-195. ASPHALT SURFACE WITH GRADE & DRAIN.
SYP NO. 12-00263.49.

Click Here to Order

Winchester Housing Authority

Winchester Housing Authority

Concrete Walks, Porch Canopies and Kitchen Upgrades

Winchester, KY

Click Here to View

UK Princeton Research Education Center Gas Line Piping

UK Princeton Research Education Center Gas Line Piping

Project base bid scope includes approximately 2,500 feet of buried medium pressue plastic natural gas piping. Open trenching and boring methods of installation are both required. Additive alternate work includes new plastic piping system or insertion of plastic pipe in existing system of underground steel gas piping, with new risers, house regulators, and connections at six existing buildings.

Princeton, KY

Click Here to View

UK Princeton Research Education Center Boiler Installation

UK Princeton Research Education Center Boiler Installation

Project base bid scope includes the installation of one (1) gas-fired, fire-tube condensing boiler and associated hydronic piping and accessories, and natural gas piping and accessories for a complete operating heating hot water system. New boiler equipment and piping shall be interconnected to the existing piping/pumping system as indicated on contract drawings. The existing electric boiler shall remain in place and operational as emergency back-up to the new gas-fired boiler. Natural gas service to the new boiler shall be extended from exterior of mechanical room with gas service main being provided under a seperate contract.

Princeton, KY

Click Here to View

Green Acres Stormwater Treatment Units

Green Acres Stormwater Treatment Units

The construction of two in-line stormwater treatment structures on existing stormwater pipes to provide for the removal of trash, debris and other pollutants from the stormwater, plus other incidentals required to complete the work in the Green Acres Neighborhood.

Lexington, KY

Click Here to View

City of Taylorsville Contract 3 Sewer Extensions REBID

City of Taylorsville Contract 3 Sewer Extensions REBID

The project includes but is not limited to the following: Contract No 3 S.R. 44 East – Sewer Extensions a. 3300 L.F. 8″ PVC Sewer Line b. 20 EA. Manholes c. 195 L.F. 12″ Steel Casing Bore and Jack

Taylorsville, KY

click here to order

RFB-165-12 Stream Restoration Crane’s Nest Creek

RFB-165-12
The work for this project consists of the restoration of 2,274 LF of Cranes Nest Branch, including but not limited to construction of in-stream structures, excavation of proposed channels and floodplains, reshaping of existing channels, native planting and seeding, preparation of soil for seeding, planting of trees and shrubs, installation of erosion control fabric and mulch, and harvesting, transporting, installing, and maintaining live stakes and rooted materials.

Knox County, Kentucky

Click here to order

Wilson Avenue & Wyandotte Avenue Sidewalk

Wilson Avenue & Wyandotte Avenue Sidewalk

To furnish all labor, material and necessary equipment for Wilson Avenue & Wyandotte
Avenue Sidewalks.

Louisville, KY

Click Here to Order

Subscribe