Robinson Forest Land Stabilization Project
Robinson Forest Land Stabilization Project
The construction of the gabion retaining wall and soil retaining wall and soil re-compaction in Robinson Forest, Clayhole KY.
Clayhole, KY
Robinson Forest Land Stabilization Project
The construction of the gabion retaining wall and soil retaining wall and soil re-compaction in Robinson Forest, Clayhole KY.
Clayhole, KY
Red River Wastewater Treatment Plant
Contract 584-09-02 Expansion of the Staton (to become Red River Wastewater Authority) wastewater treatment plant from a capacity of .045 million gallons per day to a capacity of 1.4 million gallons per day. the construction will include a new and upgraded influent pump station, new grit and screening facilities, new aeration basins, new clarifiers, new UV disinfection, new post aeration building, new sludge handling building with sludge press and a new administration building.
Powell Co, KY
Red River Wastewater Conveyance System
Red River Wastewater Conveyance System Clay City to Stanton
Contract 584-09-01
Furnishing and installation of approximately 28,100 LF of 12-ince PVC force main and accessories.
Furnishing and installation, at various locations, of 20-inch steel cover pipe, bore, and accessories.
Powell Co, KY
Stonewall Elementary School
The work includes the renovation of the existing school with new additions for a total of 78,176 SF. Teh existing school has approximately 60,588 SF and the additions have 17,588 SF – all part of a one-story building, though the existing Gymnasium flor is 3′-9″ lower than the main building floor elevations. Stonewall Elementary School was originally built in 1960 with major building additions in 1962, 1965, 1974, and 1979. The scope of work for this current major construction project includes, but is not limited to: selective and building demolition, removal and replacement of mechanical systems including installation of variable refrigerant volume systems, replacment of existing electrical systems, fire protection, fire alarm systems, interior finishes (walls, ceilings, floors, and base), door hardware, site improvements and paving, replacement of kitchen equipment and the addition of 17,588 SF of new administrative area, stage, interior ramped corridor connection to Gym, media center, classrooms and secondary entry vestibules. The work effort will be executed in four principal phases beginning in April/May 2012 and ending in December 2013. The building will be occupied during all phases of construction work.
Lexington, KY
City of Munfordville Foodland Sewer Project
The work consists of installing 715 linear feet of 8-inch sewer, 7 property service connections, 4 manholes with castings, 1 drop manhole with casting and associated appurtenances. 78 linear feet of the 8-inch sewer pipe is to be installed in an existing steel casing pipe previously installed by another contract. This contract will provide the necessary spacers, bulk head, and appurtenant items necessary to complete the crossing
Munfordville, KY
RFB-169-12
This project involves the removal of the seven (7) water source heat pumps and installing new units, installing a new salt free water softener, installing new DDC controls on new heat pumps and making an interface to existing electrical controls on existing heat pumps. Add to the existing DDC controls so Frankfort can see new heat pumps that are being installed and to interface with the existing heat pump systems.
Richmond, Kentucky
Colonnade Repairs
This project is repair of the Colonnade with will require expertise in stone/limestone repairs, concrete repairs, urethane membranes, and sealants.
Bowling Green, KY
Morgan Co Elementary School
The project scope includes a new elementary school approximately 65,000 square feet of new construction. The work must be substantially complete no later than June 30,2013.
West Liberty, KY
RFB-168-12
The project consists of the prepatory work to accommodate the new construction including the demolition of the existing Brockton Apartments, relocation of the storm line, relocation of the sanitary line and construction of new parking.
Richmond, Kentucky
Kroger A448
This is for Sub-Contractors Only
This is for a “With-In-The-Wall” remodel.
Mason, OH
First Street Streetscape Renovation Phase 1 Re-Bid
New sidewalks, curbs, drainage and landscaping and lighting from Bridge Street west to Anglin Avenue. The distance is approximately 0.18 miles. The City of Morehead will be performing the demolition work and the successful contractor will be required to coordinate thhese efforts with the city work forces.
Morehead, KY
Pump Station Rehab City of Wurtland
Rehabilitation of the Uhlens Branch and Virginia Street Sewer Pump Stations, including the removal of existing pumps and piping, installation of submersible pumps, guide rails, valve vault, piping, electrical work, controls, cleaning, by-pass plumbing and other incedental and related work necessary for completion.
Wurtland, KY
UK Ben Roach Building Elevator #1 Jack Replacement
Contractor to furnish labor and materials to replace the jack assembly on Elevator #1 in Ben Roach Buidling.
Lexington, KY
Morehead Wastewater Treatment Plant Sludge Thickening Facility
The scope of work involves the construction of a metal building to house a pre-purchased rotary drum thickener system, sludge pump, polymer feed system, and related electrical and communications systems.
Morehead, KY
Click Here to View
CALL 200 CONTRACT ID 122911
JEFFERSON COUNTY
IM 0659(020)
JOHN F. KENNEDY MEMORIAL BRIDGE OVER OHIO RIVER
JEFFERSON COUNTY
FD52 056 0065 136-138: TENNESSEE- LOUISVILLE ROAD (I 65) BRIDGE OVER OHIO RIVER
(MP136.901) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00202N: I 64 EAST AND WEST TO I 65 NORTH BRIDGE OVER I 64 (MP5.444) .
BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00177N: NB EXIT RAMPS TO I-64 EB & WB BRIDGE OVER I-64 EB AND
WITHERSPOON ST. (MP5.459) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00176N: I 64 RAMP FROM I 65 SOUTH BOUND BRIDGE OVER I 64 (MP5.387) .
BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00178N: I 64 RAMP TO I 65 BRIDGE OVER I 64 EB & WITHERSPOON ST (MP5.
391) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0065 B00175N: TENNESSEE- LOUISVILLE ROAD (I 65) BRIDGE OVER I-64 EB& WB &
RIVER ROAD (MP136.506) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0065 4811-B: CLARKSVILLE- LOUISVILLE ROAD (I 65) BRIDGE OVER RIVERSIDE
DRIVE & MARKET ST. (MP0.108 INDIANA) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
CALL 105 CONTRACT ID 121302
PIKE COUNTY
BRZ 1203 (340): BUCKFIELD ROAD (CR 1270) REPLACE BRIDGE OVER SHELBY CREEK 121 FEET
WEST OF KY 122, A DISTANCE OF 0.04 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE.
SYP NO. 12-01100.00.
CALL 101 CONTRACT ID 121301
PULASKI COUNTY
HSIP 0802 (002): KY 80 / KY 461 INTERSECTION RECONSTRUCTION OF KY 80 AND KY 461
INTERSECTION TO IMPROVE TRAFFIC FLOW FROM MP 27.82 TO MP 28.30, A DISTANCE OF 0.39
MILES. GRADE & DRAIN WITH ASPHALT SURFACE.
SYP NO. 08-00909.00.
CALL 102 CONTRACT ID 121001
PIKE COUNTY
APD 0806(040): PIKEVILLE-VIRGINIA STATE LINE ROAD(US-460) SURFACING ON US-460/KY-80
FROM GREASY CREEK TO KY-195. ASPHALT SURFACE WITH GRADE & DRAIN.
SYP NO. 12-00263.49.
Winchester Housing Authority
Concrete Walks, Porch Canopies and Kitchen Upgrades
Winchester, KY
UK Princeton Research Education Center Gas Line Piping
Project base bid scope includes approximately 2,500 feet of buried medium pressue plastic natural gas piping. Open trenching and boring methods of installation are both required. Additive alternate work includes new plastic piping system or insertion of plastic pipe in existing system of underground steel gas piping, with new risers, house regulators, and connections at six existing buildings.
Princeton, KY
UK Princeton Research Education Center Boiler Installation
Project base bid scope includes the installation of one (1) gas-fired, fire-tube condensing boiler and associated hydronic piping and accessories, and natural gas piping and accessories for a complete operating heating hot water system. New boiler equipment and piping shall be interconnected to the existing piping/pumping system as indicated on contract drawings. The existing electric boiler shall remain in place and operational as emergency back-up to the new gas-fired boiler. Natural gas service to the new boiler shall be extended from exterior of mechanical room with gas service main being provided under a seperate contract.
Princeton, KY
Green Acres Stormwater Treatment Units
The construction of two in-line stormwater treatment structures on existing stormwater pipes to provide for the removal of trash, debris and other pollutants from the stormwater, plus other incidentals required to complete the work in the Green Acres Neighborhood.
Lexington, KY
City of Taylorsville Contract 3 Sewer Extensions REBID
The project includes but is not limited to the following: Contract No 3 S.R. 44 East – Sewer Extensions a. 3300 L.F. 8″ PVC Sewer Line b. 20 EA. Manholes c. 195 L.F. 12″ Steel Casing Bore and Jack
Taylorsville, KY
RFB-165-12
The work for this project consists of the restoration of 2,274 LF of Cranes Nest Branch, including but not limited to construction of in-stream structures, excavation of proposed channels and floodplains, reshaping of existing channels, native planting and seeding, preparation of soil for seeding, planting of trees and shrubs, installation of erosion control fabric and mulch, and harvesting, transporting, installing, and maintaining live stakes and rooted materials.
Knox County, Kentucky
Wilson Avenue & Wyandotte Avenue Sidewalk
To furnish all labor, material and necessary equipment for Wilson Avenue & Wyandotte
Avenue Sidewalks.
Louisville, KY