Housing Authority of Dawson Springs
Housing Authority of Dawson Springs
HVAC Duct replacement, HVAC upgrades, Accessible bathroom upgrades
Dawson Springs, KY
Housing Authority of Dawson Springs
HVAC Duct replacement, HVAC upgrades, Accessible bathroom upgrades
Dawson Springs, KY
City of Taylorsville Sanitary Sewer Line Extensions
Contract 3 S.R. 44 East Sewer Extensions. 4000 L.F. 8″ PVC Sewer Line.15 EA. Manholes. 350 L.F. 16″ Steel Casing-Bore & Jack. 1 EA. Odor Control System @ Pump Station.
Taylorsville, KY
Russell Cave Warehouse
The project scope includes the renovation of a 1 story warehouse with an approximate total are of 100,000 SF of existing building. The exterior walls are precast concrete panels, steel frame with slab-on-grade. Roofs are ballasted EPDM over an original BUR over gypsum deck over steel bar joists. The entire roof deck to be replaced with corrugated metal and SBS modified roof system. Approximately 28,900 SF of the interior of the building will have a new mezzanine constructed from structural steel and hollow core plank system. This area will house relocated FCPS support programs. Site work includes minor regrading with new asphalt, paving resurfacing, site lighting, storm water utilities. MEP includes variable refrigerant HVAC system, all-electric power and modifications to a full fire suppression system. The adjacent building will have minor improvements made as a result of the work on this property. Renovation activities may begin December 2011 after the required approvals are received. The work must be substantially complete no later than November 2012.
Lexington, KY
Magnolia Avenue Infiltration Trench
The Alley that runs from W. Burnett Avenue to W. Ormsby Avenue, between S. 2nd St. and S. 3rd St.. The CONTRACTOR shall accomplish substantial completion of the Project on or before December 31, 2011.
Green Demonstration Project: Permeable Pavement along Adams Street
This green demonstration project involves the construction of two articulating concrete block pavement strips along Adams Street just off of Exit 7 on Interstate 64. This project includes connections of the pavement strips to existing drainage structures, repair of sidewalks, curbing and any pavement damaged due to construction.
Buechel Basin Wastewater System Phase 1A
The project consists of the construction of approximately 1,610 LF of 60″ sewer (20 LF of which will be installed by tunneling beneath the CSX railroad spur), 20 LF of 48″ sewer with bulkhead, 12 LF of 96″ sewer with bulkhead, a diversion structure, influent gate structure, return flow gate structure, four (4) manhole tees and associated asphalt pavement repair.
RFB-115-12
The work consists of: The Fire Alarm System will be removed and upgraded per the 2007 Kentucky Building Code with Current Revisions, the 2009 International Building Code, and the 2010 National Fire Alarm and Signaling Code, NFPA72 at the Breathitt Regional Juvenile Detention Center, located at 2725 Highway 30W, Jackson, KY. An intelligent, addressable fire alarm system shall be provided in accordance with National Fire Alarm and Signaling Code requirements as well as the requirements of the State Fire Marshall’s Office. The system will comply with all manufacturers’ requirements and shall report compatible alarm signals to the remote central system via an externally mounted dialer. The fire alarm system will monitor any and all sprinkler system flow switches, tamper switches, and duct mounted smoke detectors as well as heat detectors and smoke detectors.
Jackson, Kentucky
RFB-107-12
The project comprises the stabilization of the exterior envelope of the Old Federal Building: repair of stone walls, removal of the roofing and its replacement with a coated copper flat lock roofing system, copper counter flashing, copper gutter liners, copper drops and copper roof accessories, repair of all windows, the repair and restoration of interior casings, window stools and skirts and interior and exterior painting of all windows and exterior metals. Funds for this project have been provided by the American Recovery and Reinvestment Act of 2009 with a grant from the National Park Service. All work shall be performed in strict accordance with the Secretary of the Interior’s Standards for Rehabilitation and Guidelines for Rehabilitation of Historic Buildings.
Frankfort, Kentucky
Replace HVAC Units for Islands Mammals Facility
Contract to furnish labor, materials and necessary equipment for the purchase and installation of replacement HVAC units for the Islands Mammals Facility.
Louisville, KY
Carter Elementary School
BP030 General Trades (Site Work and Concrete
BP 040 Masonry
BP 050 Metals
BP 090 Finishes
BP 096 Flooring
BP 097 Wood Gym Floor
BP 114 Kitchen Equipment
BP 115 Gym Equipment and Bleachers
BP 210 Fire Protection
BP 220 Plumbing
BP 230 HVAC
BP 260 Electrical
BP 270 (BP 220 and BP 230 Combination
New 42,858 SF Elementary School
Grayson KY
City of Jenkins Payne Gap Waterline Extension Phase 1
City of Jenkins Payne Gap Waterline Extension Phase 1; Installation of 10, 8, 6, 4 and 2 inch waterlines and appurtenances.
Jenkins, KY
Lexington Public Library Sound/Video System BP2
The project consists of removal of the existing sound and video systems, salvage of the equipment for re-installation or delivery to the owner; providing an dinstalling all new Sound and Video Systems, including wiring in the Auditorium, and ancillary areas, specifically as indicated as part of (Bid Package #2); preparations for this work including conduits and related electrical work for the sound and videosystems shall be accomplished in (Bid Package #1) as part of the General Scope of Work, by separate contract. Bid Package #2, Contractor shall coordinate their work with the Bid Package #1 General Scope of Work to provide portions of each contract’s work simultaneously. There are many additional miscellaneous items in the Scope of Work as shown on the Contract Documents Prepared byPearson & Peters Architects PLC and Shrout Tate Wilson Consulting Engineers.
Lexington, Ky
Lexington Public Library Selected Maintenance Upgrades BP1
The project consists of selected maintenance and upgrades to the Central Branch, First Floor, including perparations as indicated in (Bid Package #1), for new Sound and Video systems in the Auditorium as a part of (Bid Package #2); preparations as indicated in (bid Package #1), including removal of existing Theater seats by General Contractor under this related scope of work for the Theater Seating Replacement as part of (Seperate Contract By The Library); rework and replacement of floor finishes, including new carpet, ECO rubber flooring, and terrazzo flooring at the Rotunda, Auditorium and other areas of the first floor; rework and replacement of wall and ceiling finishes including painting and new acoustical ceiling systems; addition of a new stage curtian; and new plastic laminate related casework. Bid Package #1, Contractor shall coordinate their work with the Bid Package #2 Sound and Video Syatems Scope of Work to provide portions of each contract’s work simultaneously. There is NO HVAC as part of this scope of work. There are many additional miscellaneous itemsin the scope of work as shown on the contract documents prepared by Pearson & Peters Architects PLC and Shrout Tate Wilson Consulting Engineers.
Lexington, KY
690 Improvements: Granger Pressure Reducing Station
Louisville Water Company is requesting bids to furnish and install one (1) complete underground pressure reducing station including site work, electrical work, piping, EPSC, drainage, utilities, restoration and landscaping. See contract documents for additional details.
Louisville, KY
RFB-105-12
The project is the removal of the existing “Kalwall” skylight system over the main entry atrium and replacing it with a metal roof system. Other work involved includes but is not limited to structural metal deck installation, rigid roof insulation, masonry for the end walls, and decorative wood ceiling treatments.
Frankfort, Kentucky
Longhorn Steakhouse — Louisville, KY
The scope of work consists of a full restaurant ground up build. All site work such as grading, utilities, asphalt, and concrete will be required. Building Scope will include all mechanical trades as well as concrete, stone, CMU, glass/glazing, drywall/metal stud, rouch carpentry, finish carpentry, tile, acoustic, ceiling, painting, and roofing.
Louisville, KY
RFB-106-12
The work includes construction of a new building housing the Section Offices for the Kentucky Transportation Cabinet – Grant County. Site development, utilities, paving and other site work are required. This building will remain unoccupied and under the control of the contractor during the course of this work, however the Contractor shall coordinate with the Transportation Cabinet for any work to be done that affects the areas outside of the Project Limits or any work to be done other than normal working hours.
Williamstown, Kentucky
Emergency Generators Repairs for Urban Goverment Center Building
Furnish all labor, materials and necessary equipment for the Emergency Generator Repairs for Urban Government Center Building Project for Public Works & Assets.
Louisville, KY
Professional Services for Study/Design — Boiler MACT
Western Kentucky University requests proposals from qualified Architectural/Engineering Firms to enter into a contract to conduct a feasibility study on the coal boilers in the Heat Plant at Western Kentucky University. It is almost time to renew the permit and as requirements have changed WKU is requiring a feasibility study to determine if it is in its best interest to update to coal boilers, put it scrubbers, etc. in order to permit, or to remove them and only use the gas boilers already in place. If it is determined to be the best decision to proceed with new permits on the coal boilers, it is the intent of the RPF to select an Architectural/Engineering Firm that can not only complete a feasibilty study (Phase 1), but to proceed with the redesign phase (Phase 2) and design the update that will be required to permit. This RFP will only move into Phase 2 if evaluated to be in the best interest of WKU.
Bowling Green, KY
City of Danville Harding Street Storm Water Improvements
Harding Street Storm Water Improvements including work on Rosemont Ave, Cottage Manor and Forest Ave. This project is for approximately 1340 feet of 30″, 248 of 24″, 963 of 18″, 322 of 15″ and other storm water pipe line construction and related small storm water structures. Sets will NOT be issued after 10/18/11 5:00pm.
Danville KY
Clark County Elementary School
01 Paving
02 General Trades
03 Masonry
04 Steel
05 Roof
06 Drywall
07 Windows
08 Painting
09 Carpet/VCT
10 Tile
11 Food Service Equipment
12 Media Center Equipment
13 Wood Flooring
14 Bleachers
15 Fire Protection
16 Plumbing
17 Mechanical
18 Electrical
20 Combination
Winchester KY
Conkwright MS Renovation
021 General Trades
022 Masonry
023 Steel
024 Roof-Alternate Only
025 Drywall
026 Windows
027 Paint
028 VCT/Carpet
029 Fire Protection
030 Plumbing
031 Mechanical
032 Electrical
036 Combination
Winchester, KY
Purchase and Installation of New Pavilion and Site Amentities for Okolona Park
Louisville, Ky
Click Here to Order
Dawson Springs 4H Camp Dining Hall Reroof
Remove existing shingle roof, gutters and downspouts. All roofing debris to be removed by contractor that is certified to remove ACM. Please refer to the attached “Analysis of Roof Samples.” All roof debris is to be disposed to according to projetc specifications. Any exposed sheathing is to be protected from the elements at all times. If a complete tear off is performed prior to replacement of roof, the entire roof will need to be protected. After removal of shingles and felt paper, roof sheating shall be inspected for rotted plywood, 1x, rafter facia, and/or rotted structural members (rafters/trusses). A University Representative shall inspect the rotted areas and review the quantities to be replaced prior to replacement.Install new exposed fastner, ribbed roof panels according to manufacturer’s and project’s specifications. If 2x or 1x nailers are required these are to be included in the lump sum bid price. Within 10 days of award, the contractor shall provide all submittals indicated, including color charts, samples and product data of all roofing products.Include new gutters and downspouts according to manufacturer’s and projetc specifications. Gutters to be 5″ seamless coil stock with 1 expansion joint per side and 4-5″ square downspouts per side with hidden fastners. Once a University Representative has inspected the new ribbed roof panel installation, install new ice guards per manufacturer’s and project specifications. Ice guards to be adhered to the metal panel and not mechanically fastened.
Dawson Springs, Ky
City of Caneyville Wastewater Treatment Plant Improvements-Phase 3
The Wastewater Treatment Plant Improvements-Phase 3 Project generally consists of the replacement of the plant secondary treatment mechanical aeration assembly, construction of a new primary treatment structure including a mechanically cleaned bar screen, replacement of sludge pumps and controls, construction of a new aluminum service walkway structure, metal painting and construction of approximately 250 linear feet of new aluminum safety railing.
Caneyville KY