CALL 200 CONTRACT ID 122911
JEFFERSON COUNTY
IM 0659(020)
JOHN F. KENNEDY MEMORIAL BRIDGE OVER OHIO RIVER
JEFFERSON COUNTY
FD52 056 0065 136-138: TENNESSEE- LOUISVILLE ROAD (I 65) BRIDGE OVER OHIO RIVER
(MP136.901) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00202N: I 64 EAST AND WEST TO I 65 NORTH BRIDGE OVER I 64 (MP5.444) .
BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00177N: NB EXIT RAMPS TO I-64 EB & WB BRIDGE OVER I-64 EB AND
WITHERSPOON ST. (MP5.459) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00176N: I 64 RAMP FROM I 65 SOUTH BOUND BRIDGE OVER I 64 (MP5.387) .
BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0064 B00178N: I 64 RAMP TO I 65 BRIDGE OVER I 64 EB & WITHERSPOON ST (MP5.
391) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0065 B00175N: TENNESSEE- LOUISVILLE ROAD (I 65) BRIDGE OVER I-64 EB& WB &
RIVER ROAD (MP136.506) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
JEFFERSON COUNTY
FD52 056 0065 4811-B: CLARKSVILLE- LOUISVILLE ROAD (I 65) BRIDGE OVER RIVERSIDE
DRIVE & MARKET ST. (MP0.108 INDIANA) . BRIDGE REPAIRS. SYP NO. 5 -801.00 .
CALL 105 CONTRACT ID 121302
PIKE COUNTY
BRZ 1203 (340): BUCKFIELD ROAD (CR 1270) REPLACE BRIDGE OVER SHELBY CREEK 121 FEET
WEST OF KY 122, A DISTANCE OF 0.04 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE.
SYP NO. 12-01100.00.
CALL 101 CONTRACT ID 121301
PULASKI COUNTY
HSIP 0802 (002): KY 80 / KY 461 INTERSECTION RECONSTRUCTION OF KY 80 AND KY 461
INTERSECTION TO IMPROVE TRAFFIC FLOW FROM MP 27.82 TO MP 28.30, A DISTANCE OF 0.39
MILES. GRADE & DRAIN WITH ASPHALT SURFACE.
SYP NO. 08-00909.00.
CALL 102 CONTRACT ID 121001
PIKE COUNTY
APD 0806(040): PIKEVILLE-VIRGINIA STATE LINE ROAD(US-460) SURFACING ON US-460/KY-80
FROM GREASY CREEK TO KY-195. ASPHALT SURFACE WITH GRADE & DRAIN.
SYP NO. 12-00263.49.
UK Princeton Research Education Center Gas Line Piping
UK Princeton Research Education Center Gas Line Piping
Project base bid scope includes approximately 2,500 feet of buried medium pressue plastic natural gas piping. Open trenching and boring methods of installation are both required. Additive alternate work includes new plastic piping system or insertion of plastic pipe in existing system of underground steel gas piping, with new risers, house regulators, and connections at six existing buildings.
UK Princeton Research Education Center Boiler Installation
UK Princeton Research Education Center Boiler Installation
Project base bid scope includes the installation of one (1) gas-fired, fire-tube condensing boiler and associated hydronic piping and accessories, and natural gas piping and accessories for a complete operating heating hot water system. New boiler equipment and piping shall be interconnected to the existing piping/pumping system as indicated on contract drawings. The existing electric boiler shall remain in place and operational as emergency back-up to the new gas-fired boiler. Natural gas service to the new boiler shall be extended from exterior of mechanical room with gas service main being provided under a seperate contract.
The construction of two in-line stormwater treatment structures on existing stormwater pipes to provide for the removal of trash, debris and other pollutants from the stormwater, plus other incidentals required to complete the work in the Green Acres Neighborhood.
City of Taylorsville Contract 3 Sewer Extensions REBID
City of Taylorsville Contract 3 Sewer Extensions REBID
The project includes but is not limited to the following: Contract No 3 S.R. 44 East – Sewer Extensions a. 3300 L.F. 8″ PVC Sewer Line b. 20 EA. Manholes c. 195 L.F. 12″ Steel Casing Bore and Jack
RFB-165-12
The work for this project consists of the restoration of 2,274 LF of Cranes Nest Branch, including but not limited to construction of in-stream structures, excavation of proposed channels and floodplains, reshaping of existing channels, native planting and seeding, preparation of soil for seeding, planting of trees and shrubs, installation of erosion control fabric and mulch, and harvesting, transporting, installing, and maintaining live stakes and rooted materials.
Fire Station #5 Exterior Renovation and Structural Repairs
Fire Station #5 Exterior Renovation and Structural Repairs
The construction documents cover the exterior renovation and structural repairs to Fire Station #5. Building is located in a historic district. All work must comply with historic preservation standards. The building will be occupies and all systems must remain in operation. Contractor must have experience with historic projects.
The existing roof framing will be reinforced. Metal tie-rod collar-ties will be added. Existing roof rafters repaired. Exterior masonry walls to be rebuilt along top courses, damage brick replaced, exterior repointed and painted. Aves and boxed-in gutters are to be replaced. Original exterior wood trim shall be salvaged and reused. Carpentry repairs to deteriorated portions of window and door frames as well as miscellaneous carpentry to complete the selected renovation work.
The project sonsists of approximately 12,200 LF of 16″ waterline, 300 LF of open cut and bored encasements, tie-ins to existing lines, waterline appurtenances, and installation.
This project consists of renovating approximately 11,000 GSF of space on a single floor. The building will be renovated into an undergraduate class lab facility for Biology and an outreach intructional facility for the Partnership Institute for Mathematics and Science Education Reform (PIMSER). The improvements will include a community activities room that will double as a classroom for both PIMSER and Biology. The renovation will also incorporate necessary upgrades of the building systems, such as communications, plumbing, HVAC, electrical, fire safety and security.
The University will be upgrading the Electrical and IT Infrastructure in 4 different clinics to upgrade to their new Electronic Heath Records system. The scope of work will include providing new Cisco dual power switches and rack mounted UPS, installing new HVAC in the communication rooms to accommodate the new heat load, and upgrading the data network in each of the clinics. Included in this would new Wireless Access devices and new data and power outlets located throughout clinics as indicated.
Parkview Avenue, Harrison Avenue, 18th Street, 19th Street, Summer Hill Avenue and Hulbert Alley Water Main Replacement Project
The proposed work is generally described as follows: Construction os approximately 1,390 ft of 8” ductile iron pipe on Parkview Ave, 436 ft of 4” ductile iron pipe on Harrison Ave, 1,515 ft of 8” ductile iron pipe on 18th Street, 1,587 ft of 12” ductile pipe on 19th Street, 1,389 ft of ductile iron pipe on Summer Hill Ave, 106 ft of 4” ductile iron pipe and 247 ft of 2” HDPE pipe on Hulbert Alley in Newport, Campbell Co, Kentucky.