Louisville Water Company is requesting Bids for the installation of 1,030 linear feet of 12-inch PVC water main along West Blue Lick Road between 2792 West Blue Lick Road and 2946 West Blue Lick Road. Also included with the project is the installation of 2 fire hydrants, the transfer/renewal of 11 customer services, and 1 meter exchange.
The work includes the tear off of existing roof memebranes, roof insulation, sheet metal, metal counter flashing and components as indicated. Install new rigid insulation and tapered insulation and SBS- Modified Bituminous Membrane System at metal deck areas. Install SBS- Modified Bituminous Membrane System over rigid insulation at lightweight concrete fill, as indicated and all metal components.
The work includes repair of the existing clay tile roof. Replace all broken clay tiles and re-secure loose clay tiles. Apply underlayment to ridge and hip stringers. Re-flash two (2) chimneys and copula. Re-finish windows in the cupola.
RFB-246-12
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 20 acres of mine land in Ohio County, Kentucky. The work will consist of earthwork, gradework, and revegetation of 1 bond forfeiture permit. For continued project description see Special Conditions
The scope of work includes the construction and/or furnishing of various items as listed in the Bid Schedule of this document, plus incidentals necessary to complete the work. The work is entitles the “Richmond Utilities Diesel Truck and Mounted Crane” and consists of the purchase and delivery of one (1) new 1-ton diesel truck fiteed with one (1) 6,500 ft. lb. electric crane and one (1) 2,000 lb. winch at the Richmond Utilities Otter Creek Wastewater Treatment Plant.
The scope of work includes the construction and/or furnishing of various items as listed in the Bid Schedule of this document, plus incidentals necessary to complete the work. The work entitled the “Richmond Utilities Trailer-Mounted Centrifugal Pump” and consists of the purchase and delivery of one (1) new trailer-mounted centrifugal trash pump at the Richmond Utilities Otter Creek Wastewater Treatment Plant.
Lancaster Road (KY 39) Water Line Replacemetn Project City of Crab Orchard
Lancaster Road (KY 39) Water Line Replacemetn Project City of Crab Orchard
The work to be bid upon is described as follows:
53,200 LF 10-inch PVC water line to replace 6-inch AC water line
1,00 FL 12-inch DR-9 HDPE water line by Directional Drilling methods
5,000 LF 3/4″, 1″ and 1 1/2″ CTS Service Line
300 LF 16-inch steel casing pipe Bore & Jack
35 Ea. 10-inch Gate Valve & Box
117 Ea. Water Meter Reconnections
21 Ea. New Water Meters & Box
9 Ea. New Duplex Water Meters & Box
9 Ea. Fire Hydrant Assemblies
All Appurtenances
1. Remediation of existing pyretic soils within the building. Constructing new subsurface soils, concrete floor slabs and classroom walls along affected areas. 2. Demolition of the exterior facades of the existing Administration and Media Center wings. Constructing a new 19,060 sf addition and exterior canopy, consisting of structural slabs, grade beams, caissons, steel structure and masonry. 3. Excavation of existing paving, walks and grading. Construction of new parking, traffic routes, walks and grading and including new exterior site lighting. 4. Re-coating of existing metal roof and re-roofing of existing foam roof systems. Demolition of existing metal fascia and soffit panels. Constructions of new thermal envelop to include new metal fascia and soffit panels. 5. Demolition of existing interior floor and wall finishes. Repaiting, installation of new FRP panel wainscot, wall base and floor finishes.
Locust Trace Agriscience Farm Livestock Barn
242 Locust Farm Rd
Lexington, KY 40514
The work includes the construction of a post frame wood livestock barn with metal siding and roof panels – approx. 38′ wide x 72′ long plus two 12′ wide open roof areas, one on each side of barn. Work to include electrical and water plus minor site work. Professional Engineer required from Building System supplier for building structure and footing design.
City of Frankfort Marlowe Court Sanitary Sewer Main Replacement
City of Frankfort Marlowe Court Sanitary Sewer Main Replacement
City of Frankfort Marlowe Court Sanitary Sewer Main Replacement
Installation of 10 repaired or replaced standard manholes, 1 new standard manhole, replacement of approximately 1215 lf og 8″ sanitary sewer mains using standard open cut, CIPP and Pipe Burst installation methods, and 17 service lateral reconnections: also includes sewer televising, testing, sidewalk, fencing and landscape repair, including all materials, excavation and appurtenances.
The scope of work consists of a full restaurant interior fit up. All mechanical trades will be required as well as glass/glazing, drywall/metal stud, rough carpentry, finish carpentry, tile, acoustic ceiling, painting, and roofing.
RFB-242-12 Upgrade Welding Shop Exhaust System Rowan Campus
RFB-242-12
The project consists of welding shop exhaust and ventilation system replacement and
upgrade. The HVAC scope includes equipment and ductwork demolition, new welding
exhaust ductwork and hoods, utility set exhaust fans and new gas fired make up air
unit. Electrical includes re-feed of MCC and power distribution to new HVAC
equipment. Additional work includes structural steel modifications for rooftop
equipment support and metal building roof and wall penetrations.
RFB-243-12
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 88 acres of mine land in Lawrence County, Kentucky. The work will consist of earthwork, gradework, revegetation and planting of trees on 1 bond forfeiture permit.
For continued project description see Special Conditions.
Elevator and Structural Slab Rehabilitation for Crescent Hill and Zorn Pump Station Boiler Buildings
Elevator and Structural Slab Rehabilitation for Crescent Hill and Zorn Pump Station Boiler Buildings
Louisville Water Company is requesting Bids to provide all labor, rigging, tools, equipment, and materials to rehabilitate the existing open shaft Freight Elevators located in both of the Crescent Hill and Zorn Pump Station Boiler Buildings. The scope of work for both Boiler Buildings includes rehabilitating the eleavator cab, frame and rails for uninterupted operation as well as safety improvements which include, but is not limited to, caging, lights, telephone, ladders, painting and other work as noted in the contract documents. The Crescent Hill work will also require the demolition and rehabilitation of the concrete floor slabs accessing the elevator. Refer to contract documents, which include specifications and drawings, for further description of scope of work.
Poplar Level Road and Hess Lane Water Main Replacement Project
Poplar Level Road and Hess Lane Water Main Replacement Project
Louisville Water Company is requesting Bids for the installation of 1,885 linear feet of 12-inch PVC water main, 135 linear feet of 8-inch DPW water main, and 10 linear feet of 6-inch DPW water main along Poplar Level Road between Hess Lane and Nightingale Road and along Hess Lane between Fern Drive and Oriole Drive. Also included with the project is the installation of 2 fire hydrants, the transfer/renewal of 7 customer services and 7 service discontinues.
This project will serve as a regional flood storage basin. The project consists of installation and final removal of a haul road, excavation and removal of approximately 255,000 cubic yards of material, installation, maintenance and final removal of EPSC measures, installation of turf reinforcing mats, and other appurtenat work. The project is generally located along Northern Ditch between Outer Loop and National Turnpike.
First Ward School Apartments Roof Project Elkins WV
First Ward School Apartments Roof Project Elkins WV
Remove existing slate roof from main portion of the building.
Dispose of all asbestos contaminated tiles.
Inspect decking to ensure suitable surface for re-roofing
Furnish and install ice and water guard underlayment.
Furnish and install synthetic underlayment on remainder of roof.
Furnish used slate of similar type, shape and appearance in quantity sufficienct, so that when combined with salvaged slate, to re-roof the building.
Furnish and install all flashing, drip-edges and metal valleys, hips and ridge rolls.
Paint all non-coated new and existing roof and gutter flashing.
City of Frankfort East Frankfort Interceptor Rehab Phase I
City of Frankfort East Frankfort Interceptor Rehab Phase I
The project scope includes the replacement of 174 LF of 21″ gravity sewer, replacement of 158 LF of 24″ gravity sewer with 27″ gravity sewer, and the rehabilitation of 2765 LF of gravity sewer using cured in place pipe with sizes ranging from 18″ to 36″ in diameter.