Housing Authority of Middlesborough KY36P019-501-12
Housing Authority of Middlesborough KY36P019-501-12
Housing Authority of Middlesborough
Capital Funding Project KY36PO19-501-12
Middlesborough, KY
Click Here for more Details
Housing Authority of Middlesborough KY36P019-501-12
Housing Authority of Middlesborough
Capital Funding Project KY36PO19-501-12
Middlesborough, KY
Click Here for more Details
Georgetown Northwest Bypass Utility Relocation, Georgetown Municipal Water and Sewer Service
The program of work for which bids are to be submitted consists of the relocation of approximately 1,286 LF of 8″ water main, the relocation of approximately 3,440 LF of 6″ water main, the relocation of approximately 513 LF of 4″ sanitary sewer force main, the installation of gate valves, hydrant flushings assemblies, tie-ins to existing mains, relocation/reconnection of existing customer meter services, steel casing bored and open cut, reconnecting to existing services, cut and plug existing lines, abandonment of existing water mains and sewer force mains including all related appurtenances, as shown on the Drawings and described in the Specifications. est Bypass Utility Relocation, Georgetown Municipal Water and Sewer Service
Georgetown,Ky
Gateway Park Concessions Building
Construction of a one-story 1,515 sqaure foot concrete block masonry building with wood rood trusses for use as a concessions stand and public restrooms and including associated site work, general construction, plumbing, sanitary sewer, ventilation and electrical.
Liberty, KY
Vegetation and Litter Cleanup #2945
A contract for the removal of vegetation and litter at 1515 S. 11th Street.
Louisville, KY
Pizza Hut — Pikeville, KY
The scope of work consists of a full restaurant tenant fit-up in existing space. All mechanical/electrical/plumbing trades will be required as well as glass/glazing, drywall/metal stud, rough carpentry, finish carpentry, tile, acoustic ceiling, painting, and roofing.
Pikeville, KY
Utility Relocation Project West Shelby Water District
Simpsonville, KY
Carver Community Center Renovation
Requirement of this project for all work to meet the Departmrnt of the Interior’s Standards for Rehabilitation.
The demolition work involves but is not limited to selective demolition of deteriorated materials for replacement. The roof will be replaced; the HVAC system will be replaced; electric power system extended to new HVAC locations; exterior doors will be repaired with some replaced; exterior aluminum windows will be replaced; existing cold rolled steel windows will be repaired, reglazed; handrails and guardrails will be replaced at exterior stairs and ramp and limited other renovation work. Bid alternates include the selective replacement of interiors doors, frames and hardware; selective replacement of exterior metal storm windows; installation of telecom and data wiring; selective installation of security cameras and DVR equipment; provision of three year preventive maintenance contract for newly installed HVAC system; and selective demolition of interior wall partitions.
Lexington, KY
RFP-PDC-2013-039 Raymond Craven Library/Helm Library Building Envelope Rehabilitation
The project is a multi-year, multi-phase renovation/replacement including but not limited to the roof systems and building envelope for the Raymond Cravens Library/Helm Library. RCL is a 9-floor building consisting of a cast-in-place concrete structure with an exterior wall system constructed of CMU back-up and brick masonry veneer and full building height curtain wall systems. A pedestrian bridge provides access to the 4th floor of the building and an enclosed two level structured walkway provides access from RCL to Helm Library. A one-story cast-in-place concrete portico provides cover for the concrete walkway on the south and southwest elevations.
Bowling Green, KY
Minnie – Harold Connector Water Main Relocation
The program of work consists of approximately 7,600 lf of 16,10,6,4,3 and 2 inch water main and all related appurtenances.
Southern Water and Sewer District, KY
RFB-117-13
Science Building – Phase II Control System Upgrade
Integrate remaining existing DDC Legacy System components into new FMS controls. It is proposed to provide new controls and sequences to remaining system throughout the Science Building, and bring all equipment to Web control.
Alternate #1 – Replace one of the existing boiler plant units, with new boiler sized for 1/3 of Building Load. The new boiler will be sequenced for summer reheat hot water, and will allow larger boiler to be off until heating season.
Alternate #2 – Provide one additional boiler sized for 1/3 Building Heating Load (Total of Alt. #1 and Alt. #2 Boilers sized for 2/3 Building heating Load). The new boilers will be sequenced for cascading control for summer reheat hot water, and will allow larger boiler to be off until heating season.
AT Building – VAV Box Controls Replacement
Remove existing pneumatic control system including tubing for the VAV boxes served by AHU#1 and AHU#2. Replace existing VAV box control’s devices and reheat valves only, and provide new FMS controls to each VAV box and zone, (one Thermostat per. Zone. The Remaining (33) VAV Box Controls will be replaced via unit prices as funds are available.
Provide a complete HVAC System Cleaning to all low and medium pressure supply and return ductwork. Sanitized and coat insulation for all interlay insulated low pressure ductwork, VAV boxes and Air Handling Units.
Elizabethtown, Kentucky
RFB-116-13
The Project consists of the addition of a new standing seam metal roof and structural system over the existing roof of the Drill Hall of the Armory building, of approximately 7,000 SF.
The scope of work shall include, but not necessarily be limited to the following areas – selective demolition as indicated or necessary to complete the indicated new work, as well as protection of adjoining roofs to remain. Addition of the new roof structure will be on top of the existing masonry walls at the perimeter of the Drill Hall. The existing wall coping will be removed but the low slope built up roof within the perimeter walls will remain. The scope also includes all associated metal trims, flashings, fascias, gutters, downspouts and associated rain drainage. The project includes the removal of an existing roof ventilator and the installation of a roof hatch. The work shall also include all of the related wok to accomplish the construction scope of work indicated herein and as shown on Contract Documents prepared by Pearson & Peters Architects PLC.
Walton, Kentucky
RFB-114-13
The project includes the replacement of the existing 90 ton chiller. The new chiller shall
be 100 ton with scroll compressors. The work consists of the removal of the existing
chiller, pump, piping, system flush and water treatment, installation of heat tempering
cable, insulation, installation of electrical power, and integration with existing
temperature controls system.
Paducah, Kentucky
Westside WWTP UV Disinfection System Replacement and SCADA Improvements
The primary scope of work includes the removal of the existing UV disinfection system and installation of a new TrojanUV3000Plus system and associated features. Also included in this contract are various SCADA improvements to the WWTP.
Madisonville, KY
Water System Improvements Deane Area Phase 2 Letcher Co, KY
Construct approximately 19,001 feet of 3-inch through 6-inch water main and related appurtenances.
Letcher Co, KY
Commercial Bank Demolition Package
The project scope includes demolition of existing approximately 20,000 square feet. The work must be substantially complete no later than January 17, 2013.
West Liberty, KY
WKU-PDC-2013-036 High Voltage Upgrade Phase VI
This will be an upgrade of part of the electrical infrastructure on the main campus of Western Kentucky University.
Bowling Green, KY
Berry KY Wastewater System Improvements
Upgrade of existing wastewater collection and treatment facilities.
Berry, KY
Muhlenberg County High School West Campus Addition and Renovation
The work includes the construction of a new Area Technology Center Addition along with minor interior renovations to the existing spaces and all associated building systems and site development.
Greenville, KY
McMicken Gatehouse Renovation
McMicken Gatehouse Renovation
UC Project No. 11067B
University of Cincinnati
Cincinnati, Hamilton Co
Seperate bids will be received for:
General Contract – Estimate $395,000
Cincinnati, OH
WWTP #1 Odor Control System Upgrade Project, Georgetown Municiple Water and Sewer Service
The program of work for which bids are to be submitted consists of the replacement and upgrade of the existing odor control system, including but not limited to, the replacement of the vent piping, blower fan and enclosure, and carbon absorber vessel, misc concrete work, and removal/disposal of the existing equipment and media including all related work.
Georgetown, KY
Cardinal Lane Storm Water Improvements
The demolition and removal of an existing concrete block box culvert, the installation of 4′ x 4′ Reinforced Concrete Box Culvert, the installation of an 18″ RCP storm sewer system, the installation of turf-loc non-cabled bank stabalization blocks, and the installation of 16″ Ductile Iron sanitary sewer pipe and sanitary sewer manhole.
Lexington, KY
Bulk Floride Storage and Chemical Feed System Improvements Project, Georgetown Municiple Water and Sewer Service
The replacement and upgrade of the existing fluoride feed system, including but not limited to, the replacement of the feed pumps, piping, scales, installing a bulk storage system and scales, double-wall containment piping, misc concrete work, and removal/disposal of the existing equipment incluiding all related electrical and plumbing work as shown on the drawings and described in the specifications.
Georgetown, KY
Eden Garage Stair Renovation
Eden Garage Stair Renovation
UC Project No. 12012A
University of Cincinnati
Cincinnati, Hamilton Co
Seperate bids will be received for:
General Contract – Estimate $250,000
Alternate G-1 – Estimate $250,000
Alternate G-2 – Estimate $50,000
Cincinnati, OH
UKGS Endoscopy IR Recovery
The University of Kentucky plans to refurbish the UKGS Endoscopy IR Recovery.
Lexington, KY