Eubank Elementary School Waste Water Treatment Plant
Eubank Elementary School Waste Water Treatment Plant
This project includes installation of a new waste water treatment plant and the disconnect of the existing waste water treatment system.
Eubank, KY Click Here for More Details
Miscellaneous Metal Replacement and Welding, Abrasive Blasting and Painting of one (1) Clarifier, one (1) Oxidation Ditch, one (1) Digester, to include, piping and accessory equipment; and also structural concrete improvements to expansion joints on the Oxidation Ditch located at the DISTRICT’s Radcliff Wastewater Treatment Plant.
Remove three existing gate valves, valve boxes, extension stems, floor stands and associated piping, as shown on the drawings. Furnish and install three resilient seat gate valves and associated piping. Furnish and install three 5′ diameter precast concrete valve vaults complete with base, top slab, casting, floor stand and extension stems. Backfill excavation with crushed stone and restore asphalt surface in accordance with the contract documents.
Demolish the metal and wood rake facilities in two unused basins of the digester structure.
13-72 / Sherwood Avenue Area Lead Service Renewals
13-72 / Sherwood Avenue Area Lead Service Renewals
Louisville Water Company is requesting Bids for the renewal of lead services on Sherwood Ave., Eastern Parkway, Alta Ave., Bonnycastle Ave., Parsons Pl., Edgewood Pl., Cowling Ave., Barney Ave., and Cherokee Rd. Design information indicates a total of 122 customer service renewals, seven (7) customer service relocates, fourteen (14) customer service discontinues and thirty-one (31) meter exchanges.
WKU-PDC-2013-069 HVAC Upgrade — Ivan Wilson Recital Hall
WKU-PDC-2013-069 HVAC Upgrade — Ivan Wilson Recital Hall
This project shall be for the upgrade of the HVAC system for the Ivan Wilson Recital Hall as directed by the terms and conditions of the bid. Services needed for this job will be mechanical, electrical, and controls.
Grayson Co High School Major Renovations Phase 1
Furnish all labor, materials, equipment and services for the Major Renovations at Grayson County High School – Phase 1.
Leitchfield, KY Click Here for More Details
HW Wilkey Elementary School – Toilet, Plumbing and Kitchen Renovation
HW Wilkey Elementary School – Toilet, Plumbing and Kitchen Renovation
Furnish all labor, materials, equipment and services for the HW Wilkey Elementary School – Toilet, Plumbing and Kitchen Renovation
Contract 2 100,000 Gallon Elevated Tank Mt Olivet KY
Contract 2 100,000 Gallon Elevated Tank Mt Olivet KY
A 100,000 gallon elevated water storage tank including tank, tank foundation, site preparation, excavation, valve vault, access road and all related appurtenances.
Jessie Clark Middle School Addition and Renovation
Jessie Clark Middle School Addition and Renovation
The work includes the completion renovation of the existing school with new 2-story Addition for a total of 124,966 SF. The existing school has approximately 99,371 SF and the 2-story Addition will have 25,595 SF. Jessie Clark Middle School was originally built in 1962 with major building additions in 1990. The scope of work for this current major construction project includes but is not limited to: selective and building demolition, removal and replacement of mechanical systems including installation of variable refrigerant volume systems, replacement of existing electrical systems, fire protection, fire alarm systems, interior finishes (walls, ceilings, floors and base), door hardware, site improvements and paving, replacement of kitchen equipment and the additional 25,595 SF of new administrative area, interior corridor connection to gym, music & art department, enrichment classrooms, elevator and secondary entry vestibules. The Owner shall be responsible for all asbestos abatement with the exception that existing roofing system components containing asbestos shall be removed by the contractor. The work effort will be executed in three Phases beginning in July 2013 and ending July 2015. The building will be occupied and in-use during all phases of construction work. The site work is designed to interface with LFUCG road and utility work along Clays Mill Road while allowing the school to continue its primary functions during the regular academic calendar years of 2013-14 and 2014-15. The contractor shall be required to coordinate the contract work with daily school activities, as well as between phases with the FCPS-provided activities related to: moving of occupants; asbestos abatement; and the installation of casework (not-in-contract).
Lexington, KY
Middle Creek Battlefield Walking Trail Improvements
Middle Creek Battlefield Walking Trail Improvements
Middle Creek Battlefield / Walking Trail Improvements
Floyd County, KY Click Here for More Details
Tates Creek HS Synthetic Turf
Tates Creek HS Synthetic Turf
Removal and partial recycling of the existing synthetic turf athletic field, reworking the existing perimeter drainage, addition of storm drain piping, installation on concrete pole vault runway and landing area, installation of new football field goal posts, installation of discus pole sleeve supports, reworking of the existing gravel sub base and final laser grading, installation of geotextile fabric, shock drainage pad, and synthetic turf system with rubber/sand mix infill. The area of field replacement is the total area inside the existing perimeter track system – totaling approximately 119,500 SF EACH. All existing track surfaces, and other existing appurtenances shall be protected and not damaged during construction of the turf replacement.
Lexington, KY Click Here for More details
Paul Laurence Dunbar High School Synthetic Turf Replacement – Athletic Field
Paul Laurence Dunbar High School Synthetic Turf Replacement – Athletic Field
Removal and partial recycling of the existing synthetic turf athletic field, reworking the existing perimeter drainage, addition of storm drain piping, installation on concrete pole vault runway and landing area, installation of new football field goal posts, installation of discus pole sleeve supports, reworking of the existing gravel sub base and final laser grading, installation of geotextile fabric, shock drainage pad, and synthetic turf system with rubber/sand mix infill. The area of field replacement is the total area inside the existing perimeter track system – totaling approximately 119,500 SF EACH. All existing track surfaces, and other existing appurtenances shall be protected and not damaged during construction of the turf replacement.
Lexington, KY Click Here for More Details
RFB-208-13 Site Drainage Phase III
RFB-208-13
Bowling Green Technical College
Estimate:
$315,910.00
The work located at the Bowling Green Technical College, Bowling Green, Kentucky and consists of (1) trenching and backfilling for underground schedule 40 PVC communications conduits, empty with pull wires,(2) repair of walkway, roadway, concrete, and asphalt surfaces to match existing conditions, (3) new communications pullboxes, and (4) new building enclosures. The project also consist of storm water drainage updates and repairs with new drop box inlets, yard drains and downspout collection extensions to provide an updated storm sewer and tie to existing storm drainage structures.
RFB-209-13 HVAC Renovation Eastern Kentucky Veterans Center
RFB-209-13
Estimate:
$527,033.00
This project involves the removal of the existing outside air fans, duct work and the installation of new 100% outside air make up air unit to condition the incoming air so that it will be introduced to the building at a neutral air temperature and appox. 50% RH.This project has Automated Logic DDC control system that exist and it will be expanded to accept the four new make-up air units. The two systems will communicate over the BACNET system being supplied with the new make-up air units.
RFB-200-13 Tornado Repairs Phase II Vo-Tech and Administration
RFB-200-13
Woodsbend Youth Development Center
Estimate: $1,418,296.00
The Vo-Tech classroom building has cmu walls, rigid insulation, air space with split
face cmu veneer and metal siding continuing to standing seam metal roofing system,
as shown on the building elevations; roof rafters are wood trusses; roof to have
plywood sheathing/deck with manufactured metal siding/roof panels; overhead
insulated sectional garage doors and hollow metal door frame; removal of existing
concrete foundations in their entirety and installation of new concrete foundations and
slabs throughout; all new HVAC and electrical components.
The Administration Building has CMU walls, rigid insulation, fiber cement board siding
and soffits continuing to modified bitumen roofing system as shown on the building
elevations; roof rafters are wood trusses and 2x framing joists; roof to have plywood
sheathing/deck with rigid insulation and 2-ply modified bituminous membrane roofing;
aluminum storefront and windows; all new HVAC and electrical components and
related site work.
2360.0 2013 Annual Parking Garage Maintenance and Restoration
2360.0 2013 Annual Parking Garage Maintenance and Restoration
This project will undertake recommended maintenance and repairs for eight campus parking structures during the summer 2013. The repairs are intended to maintain and extend the useful life of the parking structures. Work will include concrete repairs, masonry repairs, replacement of door hardware, repair and replacement of handrails, installation of traffic membrane, repair and replacement of expansion joins, storm drain plumbing repair and replacement and painting of various elements as required.
Paradise Park Contract 7 Water Transmission Main and Pump Station Upgrade Muhlenberg Co, KY
Paradise Park Contract 7 Water Transmission Main and Pump Station Upgrade Muhlenberg Co, KY
Contract 7 will consist of the construction of approximately 35,000 feet of 8 inch waterline and appurtenances and upgrade to an existing pump station. Excavation is unclassified.
This is a minor renovation of the existing facility with work occurring in the basement and first floor only. Basement renovation is limited to hallway and reconfiguring existing restroom into separate male/female restrooms. Work on the first floor starts in the main entry way where the entry doors will be refinished. The front shall and office will receive a major face lift, wood floors, replacement wood doors ACT system, new lights. The ramp in the main assembly area will be replaced and the entry into 101 will be altered to accommodate. Another new ramp will create access to the new women’s restroom and the men’s will be created on the level of the assembly hall. The addition of this ramp will require modifications to room 109 and 109a as well as a new ACT system and lights in room 109. The rear office will be reconfigured to facilitate more efficient operations for that group.
Hyden Leslie Water District Contract 15 Waterline Extension
Hyden Leslie Water District Contract 15 Waterline Extension
a.) 4” C – 900 DR 14 PVC waterline – 83,000LF
b.) 4” CL 250 PVC waterline – 97,000 LF
c.) 3” CL 200/250 PVC waterline – 59,500 LF
d.) 1” – ¾” service line – 10,000 LF
e.) 6”, 4”, 3” Gate Valves – 73 EA
f.) 5/8” x 3/4” Water Meter Assemblies – 200 EA
g.) Above Ground Booster Station 3 LS