Group IV PBG 13
Estimate: $130,200.00
The Division of Abandoned Mine Lands wishes to receive bids to perform reclamation work on approximately 40 acres of mine land in Lawrence County, Kentucky. The work will consist of earthwork grading, pond removal, hoe ramming and revegetation of one bond forfeiture permit.
Franklin Co. Section Office Transportation Cabinet
Estimate:
$160,000.00
This work includes the rehabilitation of an existing state owned building located at 1231 Wilkinson Blvd., Frankfort, Kentucky. The building is approximately 3,400 SF and is one story. Work includes Demolition Work, New Work, and Site Work. A complete description is in the Specifications.
RFB-33-14
Parking Lot Drainage & Remediation
Ashland National Guard Armory Depart of Military Affairs
The Ashland National Guard Armory Parking Lot Drainage & Remediation project will consist of repaving their existing parking lot and installing a concrete pad outside the doors on each side of the building. The sites existing storm drainage system will be removed and new pipe, inlets and manholes will be installed. The total project area is less than 1 acre.
RFB-29-14
Estimate: $ 65,000.00
This project consists of the installation of a new cooler and freezer at Central State
Hospital, Louisville, Kentucky. The work includes the removal of the existing cooler and
freezer, related wiring, piping and related equipment including preparation for the
installation of the new cooler/ freezer, related equipment, electrical wiring, piping and
equipment to provide a complete operating system. The project also includes shelving
for the cooler and freezer.
13-107 / Crescent Hill Filter Plant Control Room Modifications
13-107 / Crescent Hill Filter Plant Control Room Modifications
Louisville Water Company is requesting bids for work including all labor, rigging, equipment and materials to remodel and modernize the existing Control Room located in the Crescent Hill Filter Building by installing new operator computer consoles wired for multiple large screen monitors and overhead TVs, new raised flooring system, new lighting, construct new server room and provide new UPS backup system, install independent HVAC system and a fire suppression system, remove the surrounding hallway tile floor and install a new Terrazzo floor, paint all associated walls and other work as noted in the plans and contract documents.
The “Clays Mill Road Improvements Section 2B Project” involves the construction of approximately 1500 LF of a 5 lane curb and gutter roadway with an underground storm drainage system and one signalized intersection. The project also includes approximately 3,692 SY of JPC pavement, widening of an existing bridge, retaining walls and landscaping.
Improvements to the existing Boone Trace Lift Station including the replacement of three (3) submersible sewerage pumps; replacement of all wetwell equipment including pump base, piping, guide rails, level controls, and fall protection; replacement of reduced voltage starters; addition of grinder (bid as alternate); addition of stand-by generator and auto-transfer switch; replacement of control panel and new underground electrical service; and miscellaneous appurtenances required for a complete installation.
Coldstream Research Campus Bio-Infiltration Swale and Trail Project
Coldstream Research Campus Bio-Infiltration Swale and Trail Project
This project includes the construction of a bio-infiltration swale and approximately 900 linear feet of trail within the Coldstream Research Campus. The work includes General Requirements, selective demolition of existing concrete and asphalt pavement, installation of a shared-used trail constructed of porous concrete and bituminous asphalt pavement, installation of a precast concrete wall, earthwork, drainage swale armoring, temporary and permanent erosion control blankets, planting installation, planting maintenance and other related site improvements.
Lexington, KY Click Here for More Details
Frakes Elementary School Parking Repair
Frakes Elementary School Parking Repair
The project scope includes repair of a parking area adjacent to the retaining wall.
Pineville, Ky Click Here for More Details
Estill Co Water District No.1 Phase 10 Water Line Extensions
Estill Co Water District No.1 Phase 10 Water Line Extensions
The installation of approximately 36,500 L.F. of 8-inch and 6-inch PVC pipe, approximately 12,840 L.F. of 4-inch PVC pipe and 3-inch PVC pipe, water meters, hydrants, water booster stations, chlorine booster stations, and accessories.
Estill County, Ky Click Here for More Details
Runway Rehabilitation and Lighting Project at Sturgis Municipal Airport
Runway Rehabilitation and Lighting Project at Sturgis Municipal Airport
Project Description: This project consists of removal of the existing asphalt overlay, rubblization of the underlyning concrete base bituminous asphalt overlay. In addition, the project also consists of new runway lighting and NAVAIDs as well as pavement markings.
The project is the partial renovation of the 8,573 square foot, fifth-floor of the Robotics Building on the University of Kentucky’s main campus. The work generally consists of the following:
Selective demolition of CMU and gypsum board systems walls, lay-in ceilings and associated suspension systems, HM frames and wood doors, resilient flooring and base, electrical devices and wiring, and plumbing fixtures with associated piping.
New gypsum board system walls and selected ceilings and soffits
Lay-in acoustic ceilings
Hollow metal door frames
Solid wood doors
Aluminum storefront systems
Resilient floor tile
Carpet tiles
Architectural woodwork counters
Laboratory casework
Selective new Mechanical work
Selective new Plumbing and Fire Protection work
Selective new Electrical work