Author Archive

Housing Authority of Radcliff Repairs to Fire Damaged Units

Housing Authority of Radcliff Repairs to Fire Damaged Units

Repairs to Fire Damaged Units

Radcliff, KY

Click Here to View

2362.0 Commonwealth Stadium Renovation and Expansion Design Release 3B

2362.0 Commonwealth Stadium Renovation and Expansion Design Release 3B

Bid Date June 4, 2014 at 3:00pm
Bid Category X – Drywall & Acoustical
Bid Category Y – Painting & Wall Coverings
Bid Category Z – Curtain Wall/Windows/Glass & Glazing
Bid Category AA – Metal Wall Panels
Bid Category BB – Roofing
Bid Category CC – Carpet/Resilient/Epoxy Flooring
Bid Category DD – Waterproofing/Caulking
Bid Category EE – Overhead Doors
Bid Category FF – Casework & Banquette Seating
Bid Category GG – Wheel Chair Lifts

Bid Date June 5, 2014 at 3:00pm
Bid Category HH – Fall Protection
Bid Category II – Tile
Bid Category JJ – Window Treatments
Bid Category KK – Railings
Bid Category MM – Landscape & Irrigation
Bid Category NN – Site/Earthwork/Asphalt/Util
Bid Category OO – Final Cleaning
Bid Category PP – Bleacher Seating System
Bid Category QQ – Structural Repairs

Lexington, KY

Click Here to View

WKU-PDC-2014-051 DSU Phase B Food Service Equipment

WKU-PDC-2014-051 DSU Phase B Food Service Equipment

This bid is for the purchase of the kitchen equipment for Phase B of the DSU.

Bowling Green, KY

Click Here to View

NKCC-24-14 Campus Recreation Center Renovation Construction Quality Control Testing and Special Inspection Services

NKCC-24-14 Campus Recreation Center Renovation Construction Quality Control Testing and Special Inspection Services

Construction Quality Control Testing and Special Inspection Services on the new Campus Recreation Center Renovation and Expansion project. The overall scope for this project is to renovate and expand the existing A.D.

Highland Heights, KY

Click Here to View

Warren East High School Addition and Renovation

Warren East High School Addition and Renovation

Addition and Renovation

Bowling Green, KY

Click Here to View

NKCC-25-14 Kentucky Hall Pedestrian Pathway

NKCC-25-14 Kentucky Hall Pedestrian Pathway

Highland Heights, KY

Click Here to View

KY80 Turn Lanes Project

KY80 Turn Lanes Project

This project will provide a left turn lane into the Board property along KY80. All of the widening will occur on the Board property side of KY 80 in the existing right of way. This avoids impacts tot he residents on the opposite side of KY 80. Grading and drainage modifications are also part of this work. This project also includes relocation of an existing concrete sidewalk. Utilities have been relocated by owner. Contractor shall coordinate turn lane work with owner, utility companies, and adjacent property currently under construction.

London, KY

Click Here to View

Bell County High School Renovation

Bell County High School Renovation

This project will replace an existing aged HVAC system throughout the building, add a secure entry vestibule and renovate the existing Auditorium with new finishes. Exterior improvements include a new Synthetic Turf Football Field, a new Pressbox at the grandstands. Two new freestanding buildings will accommodate the exterior improvements; a new Pressbox/Concessions Stand/RR at the baseball field and a new Lock Room/Concessions Stand/RR at the Football Field.

Pineville, KY

Click Here to View

Pineville Housing Authority Repairs to Fire Damaged Unit

Pineville Housing Authority Repairs to Fire Damaged Unit

Repairs to Fire Damaged Unit

Pineville, KY

Click Here to View

2345.0 Gatton Building BP2 Work Category WC09g Painting Rebid

2345.0 Gatton Building BP2 Work Category WC09g Painting Rebid

Work Category WC09g Painting Rebid

Lexington, KY

Click Here to View

2345.0 Gatton Building BP2 Work Category 10a Toilet Accessories and Specialties Rebid

2345.0 Gatton Building BP2 Work Category 10a Toilet Accessories and Specialties Rebid

Work Category 10a Toilet Accessories and Specialties Rebid

Lexington, KY

Click Here to View

CCK-1957-14 Maxwell Place Pergola and Garage Roof

CCK-1957-14 Maxwell Place Pergola and Garage Roof

The removal and replacement of the cooper roofing at the garage and pergola; includes the replacement and refinishing of the pergola/garage wood members and pergola columns. Includes complete paint removal and repair of the soffit and brackets of the garage and repaint those wood members, rebuilding of a portion of the knee wall at the pergola and repointing of the damaged floor tile joints.

Lexington, KY

Click Here to View

City of Jackson Sidewalk Improvement Project

City of Jackson Sidewalk Improvement Project

This project includes, but is not limited to: concrete sidewalk replacement and rehabilitation.

Jackson, KY

Click Here to View

Warner Elementary School Renovation and Addition

Warner Elementary School Renovation and Addition

Nicholasville, KY

Click Here to View

Ewing Railroad Depot Rehabilitation Rebid

Ewing Railroad Depot Rehabilitation Rebid

Rehabilitation Rebid

Ewing, KY

Click Here to View

Junction City Elementary School Gymnasium Emergency Roof Replacement

Junction City Elementary School Gymnasium Emergency Roof Replacement

Gymnasium Emergency Roof Replacemen

Junction City, KY

Click Here to View

2363.0 Academic Science Building Bid Package 02

2363.0 Academic Science Building Bid Package 02

The Academic Science Building project is a new three story laboratory building located on the 600 block of Rose Street between Hilltop Ave and Huguelet Street. Including the partial basement and the penthouse space above the third floor, the building consists of an approximate total floor area of 240,000 square feet.

The work of this project consists of site preparation with the complete removal of three existing buildings and the relocation and reworking of site utilities; new construction of reinforced concrete foundations and drilled piers, grade beams and basement foundation walls, upon which will support structural streel framing with composite floor decks above grade and at-grade slab on grade; exterior insulated brick masonry veneer, metal cladding, glazed curtain wall fenestration and roofing on metal decking make up the building envelope; interiors consisting of gypsum walls and ceiling and other advanced and wall appointed interior finishes complete this most technologically advanced academic learning center in the sciences. Efficient and sustainable heating, cooling, lighting, and communications systems are incorporated for comfort, energy conservation, and ease of operation.

Lexington, KY

Click Here to View

Parking Lot Resurfacing Fayette County Health Department

Parking Lot Resurfacing Fayette County Health Department

The scope of work includes the repair and resurfacing of the existing asphalt parking lot located at the main Health Department facility, replacement of an existing dumpster service drive with concrete paving, replacement of parking stops, striping, signage and sealing.

Lexington, KY

Click Here to View

Stuart Powell Field Airport Fuel System Installation

Stuart Powell Field Airport Fuel System Installation

This project consists of the removal of two underground, 12,000 gallon UST’s and their components, the construction of an above ground fuel farm that includes a 12,000 gallon Jet A and 100LL fuel tank and their components, the construction of a 50’x50’ concrete fueling apron and an additive alternate for a 50’x50’ concrete helicopter parking pad.

Danville, KY

Click Here to View

14-77 / 10th Street Area MRR

14-77 / 10th Street Area MRRP

Louisville Water Company is requesting Bids for the installation of 1,070 +/- linear feet of 20-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), the installation of 80 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), Also included with the project is the installation of 2 +/- fire hydrants and the transfer, renewal, relocation or discontinue of 21 +/- customer services.

Louisville, KY

Click Here to View

Cooper Chapel Road Section I Widening Project #3223

Cooper Chapel Road Section I Widening Project #3223

Louisville, KY

Click Here to View

Lexington Housing Authority Atiya Place Roof Replacement Project

Lexington Housing Authority Atiya Place Roof Replacement Project

Atiya Place Roof Replacement Project

Lexington, KY

Click Here to View

2369.0 Upgrade/Relocated Pediatric Care Unit

2369.0 Upgrade/Relocated Pediatric Care Unit

Phase 1, Zone 3 is an interior renovation project of approximately 1325 square feet at the University of Kentucky Children’s Hospital Pavilion H, Floor 3 Pediatrics nursing unit. Project limits are 4 patient rooms and associated staff charting and hand-washing areas. Phasing will be in two parks, allowing for patient occupancy of 2 rooms for the duration of the project. Scope of work shall be primarily flooring, wall and ceiling finishes, as well as upgrades to room identification, plumbing, lighting, and electrical fixtures, and door hardware.

Lexington, KY

Click Here to View

Contract 77 Ecton Road Elevated Storage Tank Rehabilitation

Contract 77 Ecton Road Elevated Storage Tank Rehabilitation

Winchester, KY

Click Here to View

Rebid of 4th and Guthrie Streetscape Improvements 3224

Rebid of 4th and Guthrie Streetscape Improvements 3224

Louisville, KY

Click Here to View

Subscribe