Georgetown Scott County Museum Lighting Replacement
Georgetown Scott County Museum Lighting Replacement
Project consists of removal of the existing lighting in the Museum main display area and replacement with new lighting and controls; and providing all associated work, including but not limited to, wall patching including painting, caulking and other work as indicated and as necessary for a complete, fully functional and operational and finished installation.
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for the construction of approximately 200 linear feet of 60 inch, 1,200 linear feet of 54 inch, 2,800 linear feet of 48 inch, and 900 linear feet of 18 inch gravity sewer main and all of the associated structures.
Fayette Co Cooperative Extension Office Audio Visual and Lighting Upgrades
Fayette Co Cooperative Extension Office Audio Visual and Lighting Upgrades
Project consists of removal of existing light fixtures and lighting control systems in the building and replacement with new dimming LED Light Fixtures and Lighting Control Systems; removal of the existing audio systems in the building and replacement with new audio systems providing new High Definition Cameras, High Definition OH Projectors, Motorized Screens, HD Video Capturing and Recording, HD Display Monitors, Smart Podiums, Wireless Interface and Wireless Handheld Control of all Systems; and providing all associated work, including but not limited to wall patching including finishes, caulking and other work as indicated and as necessary for a complete, fully functional and operations, and finished installation.
Roadway Rehabilitation Man O War at Harrodsburg Road
Roadway Rehabilitation Man O War at Harrodsburg Road
The work entails rehabilitation of four (4) lanes of southbound Man O’ War Boulevard at the intersection of Harrodsburg Road. Work shall consist of excavating approximately 1300 square yards of existing pavement and dense graded aggregate (DGA) base, and then rebuilding with 6” of DGA base and 10” of Portland cement concrete pavement. Work shall also include installation of pre-formed traffic control loops and reestablishment of signal control via the new loops. Additional tasks shall include joint sealing, traffic markings, bituminous transition zones and related work.
North Nelson Water District US 31E Waterline Relocation Phase 2
North Nelson Water District US 31E Waterline Relocation Phase 2
This contract consists of approximately 3,960 LF of 8″ waterline, 1,400 LF of 6″ waterline, 3,065 LF of 4″ waterline and 890 LF of 3″ waterline, 28 tie-in connections and all necessary appurtenances. This is a relocation of existing facilities. No rock trenching will be allowed on this project.
Pine Creek, Cram Creek and Pert Creek Phase 2 Water System Improvements
Pine Creek, Cram Creek and Pert Creek Phase 2 Water System Improvements
Construct approximately 38,120 feet of 3-inch through 8-inch water main, prefabricated booster pump station, master meter vault, pressure reducing vaults, and related appurtenances.
The Project Includes providing all construction, labor, material, tools and test equipment necessary for the construction of 2,287 ft or 21 inch sanitary sewer, 195 ft of 10 inch sanitary sewer, 710 ft of 8 inch sanitary sewer, 34 manholes, and all other necessary appurtenances
This project consists of the providing of all materials labor and equipment for the construction of: Furnish and install, complete and ready for service, 505 L.F. of 60″ diameter storm drain under +/- 30 feet of cover. Remove and/or grout approximately 480 L.F. failed 48″ storm drain. Relocate utilities and restore surfaces as necessary. Maintain existing storm drainage throughout construction.
The project scope is to install aluminum grandstand bleachers and press box along with the demolition of the existing stadium structure. The project scope will include electrical and plumbing work, along with concrete foundations for masonry, roofing and railings.
City of Frankfort Forest Villa Manhole Rehabilitation
City of Frankfort Forest Villa Manhole Rehabilitation
The project scope includes the rehabilitation of a manhole and an open cut repair of one of its pipe penetrations along with replacement of the cover of a second manhole with a hatched lid.
Construct all associated sanitary and storm sewer piping and structures as shown. Provide all erosion control measures, concrete sidewalk, curb and gutter, and asphalt paving as required.
The Transit Authority of River City will receive sealed bids for the furnishing of all labor, materials and the performance of all work required for the Union Station TARC Customer Service Kiosk Replacement Project.
This project consists of providing all materials, labor, and equipment for the construction of a water distribution system including 4,230 of PVC water line, 1,880 LF of ductile iron water line, 1,150 LF of HDPE service line, and 27 residential meters.