Lexington-Fayette Urban County Housing Authority Central Office Exterior Improvements Re-Bid

Lexington-Fayette Urban County Housing Authority Central Office Exterior Improvements Re-Bid

Central Office Exterior Improvements

Lexington, KY

Click Here to View

Champion Way 16″ Water Main Extension – Phase 2

Champion Way 16″ Water Main Extension – Phase 2

The program of work for which bids are to be submitted consists of, but is not limited to, the following: Approximately 1,970 lineal feet of new 16″ DI water piping and appurtenances. The work is shown on the Drawings and described in the Specifications.

Georgetown, KY

Click Here to View

Clark Co Airport Runway 18-36 Extension Project Phase 1

Clark Co Airport Runway 18-36 Extension Project Phase 1

The Division A Base Bid and Additive work will consist of miscellaneous demolition, approximately 200,000 CYS of earthwork, 1,991 LF of storm sewer, 3,035 LF of gravel access roads, and runway and taxiway markings.

The Division B Base Bid and Additive work shall consist of new electrical power installation to NAVAIDS, MALSR demolition, MALSR installation, and associated electrical and controls work.

Clark Co, KY

Click Here to View

RFB-8-15 Masonry Repairs Madisonville State Office Building

RFB-8-15
Estimate:
$205,724.00
Remove and replace damaged, spalled brick and stone. Masonry and stone pointing & repair. Remove and replace joint sealant at masonry control joints. Clean and seal brick and stone.

Madisonville, Kentucky

Click here to order

Martin County Middle School Roof Renovation

Martin County Middle School Roof Renovation

Roof Renovation

Warfield, KY

Click Here to View

Indian Fort Trail Phase 2 Project

Indian Fort Trail Phase 2 Project

The scope of work includes the installation of approximately 6,000 linear feet of a 10′ asphalt trail including construction associated with storm sewer pipe, sediment control, drainage structures, signage, and pavement striping.

Berea, KY

Click Here to View

Pikeville Commons Lift Station Relocation Phase 1

Pikeville Commons Lift Station Relocation Phase 1

This project includes installation of 1,010 LF of 10-inch PVC gravity sewer with three manholes.

Pikeville, KY

Click Here to View

Magoffin Co New High School Bid Package #26 Polished Concrete

Magoffin Co New High School Bid Package #26 Polished Concrete

Polished Concrete

Salyersville, KY

Click Here to View

Highview Park Walking Path #3248

Highview Park Walking Path #3248

Furnish all labor, material and necessary equipment for the Highview Park Walking Path.

Louisville, Ky

Click Here to View

Water Line Relocation Race Track Hollow Road

Water Line Relocation Race Track Hollow Road

Contract 519-13-03
Water Line Relocation
Approximately 1,050 LF of 6-inch ductile iron water line relocation and related appurtenances.

Letcher Co, KY

Click Here to View

City of Maysville, Combined Sewer Overflows Phase 2

City of Maysville, Combined Sewer Overflows Phase 2

The work to be bid upon is described as follows:
Approximately 15,300 feet of 16-inch ductile iron force main, 1,300 feet of 4-inch PVC force main, 1,100 feet of 4-inch PVC conduit, one duplex lift station, SCADA system, and all necessary appurtenances and fittings needed to construct the proposed line and connect into the existing system.

Maysville, KY

Click Here to View

Pippa Passes Sewer Rehabilitation Contract 25

Pippa Passes Sewer Rehabilitation Contract 25

The work to be bid consists of:
Installation of approximately 5,000 LF of 8″ SDR 17 PVC folded/formed liner and other rehabilitation services.

Viccio, KY

Click Here to View

City of Owingsville, Wastewater Treatment Plant Modifications

City of Owingsville, Wastewater Treatment Plant Modifications

Furnish and install an industrial pretreatment facility including pre-engineered metal building, influent pump station, a complete dissolved air flotation system (influent screen, dissolved air flotation unit, chemical feed system, solids storage tanks, pumps, controls and facilities for a complete and operating system), all required electrical work and site work and piping as shown on the Drawings and as specified.

Owingsville, KY

Click Here to View

Ewing Fire Department Addition And Renovation

Ewing Fire Department Addition And Renovation

This project will consist of an addition 1,386 sf pre-engineered metal building addition to the existing garage bays of the Ewing VFD building. The project will also include areas of renovation to the exterior of the existing building, which will include the replacement of the existing doors and windows and the installation of new insulated metal wall panels on the existing metal building. The project will also include substantial renovations and refinishing of the existing wood-frame part of the facility.

Ewing, KY

Click Here to View

14-114/ Bullitt County Extension Program (BCEP) – WorldView Circle Area Main

14-114/ Bullitt County Extension Program (BCEP) – WorldView Circle Area Main

Louisville Water Company is requesting Bids for the installation of 700 +/- LF of four (4) inch ductile iron water main, 725 +/- LF of four (4) inch PVC water main, 200 +/- LF of six (6) inch ductile iron water main and one (1) fire hydrant. A pre-bid meeting to discuss the Project will be held on Tuesday, June 24, 2014 at 10:00 a.m. EST/EDT at Louisville Water Company, 550 South Third Street, Louisville, KY 40202. Attendance at this meeting is strongly recommended. Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Renee Fromme, email at rfromme@lwcky.com. The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $100,001 – $250,000. Pursuant to KRS 337.505-550, if the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: (1) the Contractor must pay Prevailing Wage; and (2) a Bid Bond is required. For this Contract, prevailing wage does not apply, and a Bid Bond is not required. Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in all of the following prequalification categories: 4” – 16” PVC Water Mains and 4” – 16” Ductile Iron Water Mains. For information about pre-qualification, contact the Buyer listed above. Award of the Contract will be based on base bid pricing and is at the Company’s sole discretion. Alternate bid(s) may or may not be awarded. The Company will award the Contract to the Bidder presenting a Bid that is responsive to the Specifications, is in substantial compliance with the Contract requirements, and presents the lowest and best price for performing the Work making up the base bid. The Company may accept the Bid that the Company determines is in the Company’s best interest, which may not necessarily be the least expensive Bid. Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com

Louisville, KY

Click Here to View

14-111 Filter Drain Valve Replacement at B.E. Payne Water Treatment Plant Phase 3

14-111 Filter Drain Valve Replacement at B.E. Payne Water Treatment Plant Phase 3

Louisville Water Company is requesting Bids for the replacement of four (4) filter drain valves, actuators, and associated piping at the B.E. Payne Water Treatment Plant. A pre-bid meeting to discuss the Project and to tour the work site will be held on Tuesday, June 24, 2014 at 10:00 a.m. EST/EDT. at B. E. Payne Water Treatment Plant, 7400 Upper River Road, Prospect, KY 40059. Attendance at this meeting is strongly recommended. Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Robin Heitz, email at rheitz@lwcky.com. The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $250,001 – $500,000. Pursuant to KRS 337.505-550, if the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: (1) the Contractor must pay Prevailing Wage; and (2) a Bid Bond is required. For this Contract, prevailing wage does apply, and a Bid Bond is required. Bids will only be accepted from Bidders who have been pre-qualified by the Company in the pre-qualification category or categories that apply to this Bid. This Bid requires prequalification in the Heavy Construction prequalification category. For information about pre-qualification, contact the Buyer listed above. Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category(ies) specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.

Louisville, KY

Click Here to View

Selected Roof Repairs, Casey County Middle and High Schools

Selected Roof Repairs, Casey County Middle and High Schools

Selected Roof Repairs

Liberty, KY

Click Here to View

NKCC-30-14 Landrum Bridge Repairs

NKCC-30-14 Landrum Bridge Repairs

Purchasing and furnishing all labor, resources, supervision, materials, supplies, equipment, facilities and programming to install the Landrum Bridge Repairs.

Highland Heights, KY

Click Here to View

2014 Pavement Rehabilitation

2014 Pavement Rehabilitation

This project consists of the removal and replacement of runway and taxiway PCC pavement slabs and the associated in-pavement lights, asphalt milling and overlay of aircraft shoulder pavement, the replacement of drainage inlet top slabs, the installation of aircraft shoulder pavement and the routing and sealing cracks in PCC concrete.

Louisville, KY

Click Here to View

RFB-4-15 Delba Bush

AML Reclamation Project
Estimate:
$236,095.00
The site can be found on the USGS Matewan, W. VA.-KY quadrangle. The project involves an unstable hillside that threatens several residences along Barrenshee Creek Road. Numerous complaints have been received by Kentucky’s Division of Abandoned Mine Lands (AML) and numerous investigations have been performed. The Office of Surface Mining (OSM) has completed one project that involved the closing of a mine portal and handling of the drainage but has since failed.
The final design plan consists of constructing a reinforced concrete retaining wall behind Mrs. Bush’s home. The retaining wall will be approximately 8 ft behind the home and will be 11 ft tall (9 of which will be above ground). This wall will protect the home from potential movement of the hillside and will control the seepage coming from the hillside. The retaining wall is 80 linear feet will have a chain linked safety fence on top of it.
A 75 linear foot permanent debris barrier wall is being proposed below the existing shed location. This wall will protect the yard area from potential shallow landslides from the hillside slope. The debris barrier wall spans the drain coming from the hill. This is the most likely area for material to flow from a shallow landslide if one was to occur. A gabion trapezoidal ditch is being proposed in the drain. The ditch will start above the debris barrier wall and will flow underneath the wall. The ditch will outlet into a concrete headwall and a 24 inch HDPE pipe will carry the water across the yard. The pipe will outlet through another concrete headwall into Barrenshee Creek.

Pike County

click here to order

RFB-3-15 EOC Antenna Field

Boone National Guard Center
Estimate:
$492,300.00
The Commonwealth of Kentucky Finance and Administration Cabinet, Division of Engineering and Contract Administration (DECA), on behalf of Division of Emergency Management (KYEM) and Department of Military Affairs (DMA) are replacing the existing Emergency Operations Center (EOC) antenna field structures located at the Boone National Guard Center (BNGC) in Frankfort, Kentucky. In general, these specifications and accompanying drawings describe the work to be done and the materials to be furnished. This work generally consists of removal of existing equipment and associated infrastructure; demolition of existing towers, site preparation, design, fabrication and installation of new towers; design and construction of new foundations for new towers; below ground power and electrical utilities; Motorola R56 based grounding, conduit and associated hardware; cable ice bridge and ladders; installation of new towers and poles; all antennas, shelter foundation and associated cabling; connectors, hardware, final grading and final test; and testing/commission of all installed or modified systems. KYEM and DMA currently operate high frequency (HF), Very high frequency (VHF) and Ultra high frequency (UHF) systems to support Public Safety, Emergency Management, Amateur Radio Emergency Services (ARES), Radio Amateur Civil Emergency Service (RACES), Military Auxiliary Radio System (MARS).

Frankfort, Kentucky

click here to order

RFB-272-14 Sam Waddell – Phase II

AML Reclamation Project
Estimate:
$145,715.00
The main issue at this site is drainage. AML plans to direct the water away from the currently saturated properties and into existing ditches. This will involve the installation of 2 Drop Boxes, 100 L.F. of Double Barrel Modified Subdrain (18” non-perforated pipe above 12” perforated pipe), 160 L.F. of Modified Subdrain with 12” pipe, and 215 L.F. of Modified Subdrain with 8” pipe below approximately 1,720 S.F. of Tied Concrete Block Mat Ditch. One existing Culvert will be removed, one existing Culvert will be replaced (as necessary, with Headwalls) and two new Culverts will be installed with Headwalls, as appropriate. All culverts to be installed shall be RHDPE Pipe (Steel Reinforced), or approved equal. Additionally, AML plans to construct approximately 40 L.F. of a 4.5’-tall Non-Reinforced Block Wall (Type II) to stabilize an existing cut out. Ditches within the construction limits shall be cleaned out, as directed by the Engineer. Silt Barriers and prompt establishment of Vegetation within all disturbed areas will provide sediment control. For continued description, see Special Conditions.

Johnson County

click here to order

RFB-271-14 DMA-Armory 1-Interior Alterations

Boone National Guard Center
Estimate:
$ 76,882.00
This project involves renovations and interior fit-up to the Armory No. 1 facility located at Boone National Guard Center in Frankfort, KY. Renovations include the following: Area 1 – old crew rest lounge, Area 2 – large classroom with operable partition wall, computer lab, and conference room. Demolition will include removal of (3) operable partition walls (2 of which are fixed in place), abandoned-in-place wall mounted heat registers, acoustic ceiling tile systems, and associated electrical and mechanical components including light fixtures, outlets, diffuser grills, etc. A separate floor tile abatement project will occur prior to general construction activity for Area-2. New components and finishes to include: fixed partition walls, doors for new offices, VCT flooring, painted walls, 2’x4’acoustic ceiling tile system (grid + tile), lighting fixtures, an operable partition wall, and various electrical and mechanical components (power, voice/data, diffusers, etc.).

Frankfort, Kentucky

Click here to order

Texas Roadhouse Restaurant Middletown KY

Texas Roadhouse Restaurant Middletown KY

This is a new restaurant including site work. The owner will be providing the wood trusses, structural steel, HVAC equipment, light fixtures, switch gear, fire and security alarm, kitchen equipment & hoods, casework and décor. Additional Owner items are listed in the bid documents.

Middletown, KY

Click Here to View

UK-1390-15 RFP Renovate Upgrade UK Healthcare Facilities

UK-1390-15 RFP Renovate Upgrade UK Healthcare Facilities

UK-1390-15
Request for Proposals
Renovate Upgrade UK Healthcare Facilities – Phase 1F Construction Management Services

Lexington, KY

Click Here to View