CCK-1964-15 Stripping and Casing Building
CCK-1964-15 Stripping and Casing Building
Contractor to furnish labor and material to construct a Stripping and Casing Building at UK Research and Learning Center, Princeton, KY.
Lexington, KY
CCK-1964-15 Stripping and Casing Building
Contractor to furnish labor and material to construct a Stripping and Casing Building at UK Research and Learning Center, Princeton, KY.
Lexington, KY
Menards Jeffersonville IN
New 180,000 square foot retail building.
Jeffersonville, IN
The Housing Authority of Frankfort Entry Canopy and ADA Door Opener
Southern Apartments KY33-03:
A. Update rear entry
1. ADA Entry
2. Concrete Replacement
3. New Stair Exit Door
4. Stone Veneer
B. Automatic Opener
Frankfort, KY
Shadow Wood WWTP Elimination
Sealed bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 W. Liberty St., Louisville, KY 40203 for the construction of Shadow Wood WWTP Elimination, Contract No. 283487, Budget ID No. A09557, Drawing Record No. 283487, Sheets 1 through 9 will be received at the office of MSD until 12:00 P.M. Noon Local Time, July 31, 2014, and at that place and time be publicly opened and read.
Description and location of Project: Construction will include the installation of approximately 318 feet of 16-inch sewer pipe; 1,577 feet of 15-inch sewer pipe; trenchless installation of 16-inch carrier and 36-inch casing pipe; installation of 10 manhole structures; decommissioning of two pump stations; restoration of a treatment lagoon; decommissioning of Shadow Wood Wastewater Treatment Plant, and other miscellaneous appurtenant work.
Louisville, KY
Corbin Area Technology Center Phase 1 Renovation
Bid Packages
0300 – Concrete and General Trades
0400 – Masonry
0700 – Roofing
2223 – Plumbing and HVAC
2600 – Electrical
Corbin, KY
Madison Southern High School Pressbox Replacement
Work of this proposed contract comprises of installing a new pre-engineered/manufactured pressbox with platform and existing bleacher systems. Electric and data connections to be Owner furnished and installed.
Berea, KY
Stone Crest Substance Abuse Center
This contract document covers the construction of 3 projects plus site development.
1) Central Services Building
2) Long Term Residences
3) Short Term Dormitories
4) Sitework
Prestonsburg, KY
Nicholas Co Water District Phase 10 – Water Transmission Line
Phase 1 – Water Transmission Line
a) 19,000 LF – 6” CL 250 PVC Water Line
b) 14 EA – 6”, 4”, 2” Gate Valves
c) 6 EA – Blow off and Air Release Valves
d) 200 LF – 6” & 4” WL Bore and Jack
Nicholas Co, KY
Berea Municipal Utilities Water Treatment Plant Solids Handling
The work to be bid is described as follows:
Upgrade of existing lagoons and recycling facilities, and addition of geotextile bag storage facilities and associated work.
Berea, KY
NKCC-32-14 Founders Hall Observatory – Revised
The Scope of work requested within this Invitation to Bid consists of purchasing and furnishing all labor, resources, supervision, materials, supplies, equipment, facilities and programming necessary to install the Founders Hall Observatory
Highland Heights, KY
CCK-1966-15 AgN Deans Suite S125 Remodeling
Divide office S125 into two smaller offices. Update HVAC system in rooms S125B, S125 and S123. Offices S125 and S125B will be updated with new ceilings, paint and floor coverings.
Lexington, KY
Woodford County Public Schools Central Office HVAC
Central Office HVAC Repairs
Versailles, KY
Hutch Chrysler Dodge Jeep and Ram
Dodge Jeep and Ram
Paintsville, KY
Paducah School of Art & Design
Estimate:
$310,647.00
This project consists of the demolition of the two-story metal, wood framed structure, demolition of the single story connector and reclamation of the wood components for potential reuse in the final product. Additionally, demolition of the architectural and MEP items will occur in the two-story masonry structure including, but not limited to, removal of the first floor structure, interior non-loadbearing walls, and roof.
Paducah, Kentucky
City of Lancaster New Water Treatment Plant
CONTRACT 494-09-02 Construction of a new water treatment plant. The construction will include the construction of a new section of raw water transmission main, operations/ filter/chemical building, floc and settling basins, c1earwell and high service pump station, and sludge lagoons.
Lancaster, KY
Taxiway Rehabilitation and Drainage Improvement Project for the Big Sandy Regional Airport
Taxiway Rehabilitation and Drainage Improvement
Debord, KY
WKU-PDC-2015-001 Health Services Parking Lot Reconfiguration
The parking lot reconfiguration project is for the WKU Health Services Parking Lot and will use Electrical services, paving, concrete, curbing, communications, landscaping and any other service needed to complete this parking lot reconfiguration.
Bowling Green, KY
Warren Central High School Media Center Renovation
Media Center Renovation
Trigg County Transportation Museum Exterior
Exterior Renovation
Cadiz, KY
Woodford County Public Schools Central Office Window Replacement
Central Office Window Replacement
Please Note the pre-bid meeting is Thursday June 26th at 11:00.
Robertson Apartments
Renovation of the Robertson Building located at 100 West Main Street, Springfield KY 40069.
Springfield, KY
City of Lancaster New Water Treatment Plant Transmission Mains
Contract 404-09-03-New Water Treatment Plant Transmissions Main
Lancaster, KY
Bluegrass Station
Estimate: $254,366.00
This project includes the construction of a new free-standing building to be used for
washing large trucks with hand held sprayers. Pre-engineered Wash Equipment will be
direct purchased by the Owner, and assembled by the Contractor. This project will
construct a un-heated pre-engineered metal building around the wash area.
Construction shall include site grading, concrete footings and slab, masonry foundation
walls, pre-engineered metal building, metal roofing, metal siding and gutters, roll up
service doors and steel man doors. Domestic cold water will tap the existing 4″ main at
Burma Road and enter the building through a reduced pressure type backflow
preventer. Cold water will be supplied to the owner furnished, contractor installed
wash equipment. Minimal heat will be provided in the building with wet location, electric
unit heaters to provide freeze protection for the plumbing systems and not for human
comfort. The electrical service will originate from the existing overhead 3-phase line
adjacent to Burma Road near the new building site. The primary conductors will extend
overhead to a pole mounted transformer bank and through a weatherhead to the main
distribution panel (MDP). The MDP will serve the Hydrosite power electrical
panelboard and also serve an electrical power panel for that will subsequently feed
general receptacles have been located in the interior of the building, exterior
receptacles, lighting, and mechanical equipment. Lighting will be provided by wet
location rated, industrial type, T8 Fluorescent fixtures. The interior space will be
designed to a lighting level of 30 footcandles. Exit signs will be located at each exit,
with exterior egress lights. Exterior wall-packs will be provided above the garage door
for general exterior illumination and around the exterior perimeter of the building.
Plumbing and Electrical shall include connection to and extension of site lines and
pipes.
Lexington, Kentucky
14-118 / Reutlinger Avenue Area Lead Service Renewals
Louisville Water Company is requesting Bids for the renewal of lead services on Reutlinger Avenue, East Oak Street and Mary Street.
Design information indicates a total of 93 customer servic e renewals, 13 customer service discontinues and 19 meter exchanges.
Louisville, KY
Flood Gate 118, Gate and Actuator Replacement Project
This contract is for the removal and replacement of gate118 and corresponding actuators.
Louisville, KY