Louisville City Football Club Facility at Slugger FIeld #3259
Louisville City Football Club Facility at Slugger FIeld #3259
Request for Proposal a contract to provide all labor, materials and other necessary equipment for the Louisville City Football Club Facility at Slugger Field per the attached specifications.
14-87 / Watterson Expressway Area Lead Service Renewals
14-87 / Watterson Expressway Area Lead Service Renewals
Louisville Water Company is requesting Bids for the renewal of lead services in the Watterson Expressway Area. Design information indicates a total of 106 customer service renewals, one (1) customer service relocate, seven (7) customer service discontinues, and 33 meter exchanges.
A price contract for a portion of Louisville Metro Government’s need for the Annual Sidewalk & Curb Maintenance ReBid for a period of twelve (12) months, per the attached specifications.
Middletown Sanitary Recapture Phase I and II – Section A Project
Middletown Sanitary Recapture Phase I and II – Section A Project
This Contract provides for the installation of approximately 5,331 linear feet of 24-inch sewer and 3,292 linear feet of 21-inch sewer. This project also includes installing 29 sanitary manholes, erosion control, stream bank restoration, and appurtenant work. The project is generally located along Chenoweth Run Creek and terminates near the intersection of Avoca Road and Aiken Road.
Historic Switzer Covered Bridge
Estimate:
$ 64,100.00
This project includes the replacement of 25 roof squares of cedar shingles on the Historic Switzer Covered Bridge in Franklin County, Kentucky. This is a historic covered bridge over North Elkhorn Creek and special considerations will be required by the Contractor to prevent building debris from entering the creek. A Plan of Acton will be required by the Contractor for Owner to submit to the Division of Water. Trash collection and portable toilets will be required. There will be some minor carpentry repair and replacement required using rough cut materials. There will be a 20 year roof warranty required for the completed roof.
AML Reclamation Project
Estimate:
$ 81,915.00
We will install a new crossing at the failed crossing across the tributary running parallel to North Webb Road and perpendicular to KY 246. Temporary diversion of the stream in the work area is incidental to the overall project. Remove the existing pipes and concrete headwall. Remove sediment from the stream channel 25’ upstream and 50’ downstream for an average depth of ~1’maintaing stable side slopes. Do not remove trees or undercut the existing banks. Construct an interlocking block crossing. The roadway base will be set at the excavated channel flow path; all construction materials will be set below the 1’ lowered stream base. Efforts (equipment, labor, materials, etc.) necessary to divert the water around the work site will be incidental to site preparation. The crossing should have ~6:1 side slopes at with a 6’ bottom width. The No. 2 stone base, geo-grid, and concrete header and footer are paid under the roadway stone, geo-grid, and concrete bid items.
The upper project area will address sediment and poorly vegetated areas. We will clean out two existing silt traps. These Type B traps will not be lined with class II rock and will be deeper than normal traps to accommodate the metal precipitates from the acid mine drainage.
Eastern State Hospital
Estimate:
$323,100.00
The project is the selective modification to the nurse stations and adjacent areas on nine floors of the patient bed towers. The work is represented in the documents and generally includes the following:
Selective interior demolition and renovation for:
a. Modifications to 9 existing nurse station caseworks to allow the addition of low casework walls with half-doors and hardware.
b. Providing a 30”W x 36” H pass-through opening with coiling overhead door in each of 9 Medication Rooms located behind the Nurse Station areas. Openings to be made in metal stud/impact resistant gypsum board wall construction. Work includes termination of an existing duplex electrical outlet in a medication room behind each nurse station.
c. Providing manufactured handrails along both sides of the patient corridors in 7 floors of the patient towers.
Lake Cumberland Youth Development Center
Estimate:
$108,350.00
The project involves miscellaneous repairs for the Lake Cumberland Youth Development in Monticello, Kentucky. The work includes but is not limited to the following: asbestos abatement of resilient tile flooring mastic, minor interior wall demolition, new resilient tile and base, resinous flooring in the kitchen, interior painting, replacement of two doors in existing frames, and miscellaneous patching and repairing of adjacent finishes. Three window replacements, kitchen equipment vent, demolition of toilet. Alternate #1 includes installation of a new masonry wall and hollow metal door with associated finishes.
CCK-1969-15 Entomology Research Storage Building North Farm (Spindletop)
CCK-1969-15 Entomology Research Storage Building North Farm (Spindletop)
Contractor to furnish labor and material to a Pre-Engineered Wood Structure, the structure is 40′ and 132′ long by 11′ high post frame, metal clad shelter building.
Knox County Utility Commission Contract 16: Pigeon Fork Waterline Extension
Knox County Utility Commission Contract 16: Pigeon Fork Waterline Extension
This Contract consists of a 7.5 horse power variable frequency drive 42 gallon per minute hydro pneumatic booster pump station and approximately 11,700 feet of three inch PVC water main with appurtenances.
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule included in Part III, Form of Proposal , of this document, plus incidentals necessary to complete the work. The work entails the purchase and construction of 61 flag poles and 15 flag pole bases along the Legacy Trail.
The project includes:
providing all construction supervision, labor , materia ls, tools, test equipment necessary for the reconstruction of pipelines and conduits by the installation of approximately 1,590 L.F. of 30-inch, resin-impregnated, flexible tube , and 10 manhole rehabilitations using a resin-based liner.
All work activities required and necessary to furnish and install all of the projects elevators and associated equipment essential for their complete and safe operation. The four elevators of this project include two electric traction passenger and two electric traction service elevators.
RFB-12-15 HVAC Upgrade Big Sandy Comm and Tech College
Magoffin Building
Estimate:
$170,382.00
Project consists of replacement of HVAC pneumatic and electronic controls with complete new control system including, graphics, programming, air flow monitors, actuators, valves, etc. Project includes cleaning of existing air handler interior, installing sheet metal over VAV box filter housings, and replacing hot water piping in mechanical room. For continued project description see Special Conditions.
RFB-13-15 Steam Line Relocation Ky State Penitentiary
Steam Line Relocation Ky State Penitentiary
Estimate:
$ 50,000.00
The Work consists of the following: All construction work associated with providing steam line relocation to Cell House #1, #2 and Administration Building. Extending a high
pressure steam line from Cell House #2 to the Administration Building. A steam pressure reducing valve station shall be provided prior to connection to the existing low pressure steam piping. A steam flash tank shall be provided to reduce the steam condensate pressure prior to connection to the existing condensate receiver.
Louisville Water Company is requesting Bids for annual unit for necessary labor, equipment, and tools to excavate, connect, backfill, and otherwise install, renew, or discontinue the aforementioned water service connections. This unit price Master Agreement will be for one year with an option to renew up to four (4) additional one-year terms at the sole discretion of the Louisville Water Company. The Consumer Price Index will be used as the cost adjustment factor. Bid Category Description :
A: INSTALLATION OF JIt-INCH & I-INCH WATER SERVICE CONNECTIONS Prequalification Category: I” & Smaller Water Services Estimated Contract Value Range: $300,000 to $500,000
B: INSTALLATION OF I ~-INCH & 2-INCH WATER SERVICE CONNECTIONS Prequalification Category: 1.5″ & Larger Water and Fire Services Estimated Contract Value Range: $ I00,000 to $250,000
C: INSTALLATION OF 4-INCH & LARGER WATER SERVICE CONNECTIONS Prequalification Categories: IS’ & Larger Water & Fire Services and 4″- I6″ Ductile Iron and 4″-16″ PVC Water Mains Estimated Contract Value Range: $80,000 to $ I00,000
D: FIRE SERVICE NEW INSTALLATION Prequalification Category: 1.5″ & Larger Water and Fire Services Estimated Contract Value Range: $200,000 to $300,000
E: FIRE SERVICE RENOVATIONS Prequalification Category: 1.5″ & Larger Water and Fire Services Estimated Contract Value Range: $200,000 to $300,000
F: FIRE HYDRANTS NEW INSTALLATION Prequalification Categories: 4″-16″ Ductile Iron and 4″-16″ PVC Water Mains Estimated Contract Value Range: $20,000 to $50,000 Revised 6/29/2012
G: FIRE HYDRANT REPLACEMENTS Prequalification Categories: 4″- I6″ Ductile Iron and 4″- I6″ PVC Water Mains Estimated Contract Value Range: $20,000 to $50,000
H: RENEWAL OF 3/4″-INCH & I-INCH WATER SERVICE CONNECTIONS Prequalification Category: I” & Smaller Water Services Estimated Contract Value Range: $20,000 to $50,000
I: DISCONTINUING 2-INCH & SMALLER SERVICE CONNECTIONS Prequalification Categories: I” & Smaller Water Services Estimated Contract Value Range: $20,000 to $50,000
J. LARGE METER RENOVATIONS Prequalification Categories: 1.5″ & Larger Water and Fire
This project is for the upgrading and modernization of three elevator traction system currently in service in Anderson Hall located at 512 Administration Drive on the University of Kentucky Campus. The three elevators share a common hoistway, machine room, and pit. The elevators are situated side by side. Each elevator has a capacity of 3500 pounds and all three are 8 floors in line.