Author Archive

14-141 / 690 Plan – Cedar Grove – South Booster Pumping Station

14-141 / 690 Plan – Cedar Grove – South Booster Pumping Station

Louisville Water Company is requesting Bids for the furnish and install of one (1) complete underground booster pumping station including emergency generator work, site work, 16″ water main work, meter prv work, electrical work, EPSC, drainage, utilities, and restoration.

Louisville, KY

Click Here to Order

CCK-1971-15 Service Building Window Replacement

CCK-1971-15 Service Building Window Replacement

Furnish and install aluminum architectural windows complete with hardware and related components.

Lexington, KY

Click Here to View

Rose Street Bike Lane Project

Rose Street Bike Lane Project

Consisting of the construction and/or furnishing of items as listed in the Bid Schedule included in Part III, Form of Proposal, of this document, plus incidentals necessary to complete the work. The work entails construction of approximately 650 linear feet of Sidewalk/Ramps on the east side of Rose Street from Euclid Avenue to Rose Lane. The scope of construction involves the removal of the existing concrete walk, curb and gutter and the relocation and construction of a new sidewalk.

Lexington, KY

Click Here to View

Madison County Public Library Site Development

Madison County Public Library Site Development

Site Development

Richmond, KY

Click Here to View

RFB-36-15 Renovate McClure Pool into a New Volleyball Facility

Morehead State University
Estimate: $3,438,808.00

The project, New Volleyball Facility, Renovate McClure Pool, is a conversion of the McClure Indoor Pool, to a Women’s Volleyball Facility. McClure Pool is attached and part of the Academic Athletic Center (AAC). The AAC Center will remain in full operation during this construction and the contractor will be required to maintain separation between the area under construction and the area in use.
All of the existing swimming pool filtration, piping, and pool accessories will be removed as part of this renovation. In addition, much of the existing electrical and mechanical system within this building has been corroded by exposure to chlorine over the years and will be required to be replaced.
The existing 25 meter pool will be filled with aggregate, and a new slab poured over the old pool area. The existing diving tank will be utilized as locker space on the lower level of the building, and a steel structure will be installed over the top of the diving tank and a new concrete floor installed also.
The exterior of the building has also suffered from chlorine and moisture penetration through the walls and the existing brick veneer will be removed and replaced as part of the project. The metal fascia around the perimeter of the building will also be replaced, as well as the installation of a new roof.
The lower level of the building will be used primarily for locker room space for the volleyball team. A new elevator will be installed to provide transport and ADA accessibility to this area. The existing bleachers will be reutilized and new bleachers will be installed on the floor of the volleyball arena.
The fire alarm system will be replaced in the facility and new lighting fixtures will be installed throughout. All of the electrical equipment within the existing mechanical room will be replaced. The existing locker rooms will be converted to a single visitor’s locker room and storage and media space.
The existing volleyball arena will be repainted, as will most of the surfaces within the renovated facility. Finishes include carpet in team and club areas, VCT in utilitarian areas and athletic flooring on the volleyball floor.

Morehead, Kentucky

Click here to order

RFB-33-15 HVAC Renovation – Administration Building

Henderson Community College
Estimate: $530,000.00

This project consists of an HVAC upgrade at the Administration Building at Henderson Community College. The work consists of new fan coil units, a new air handler, controls and associates electric. The work will be phased to accommodate occupant use.

Henderson, Kentucky

Click here to order

RFB-37-15 KCIW Various Buildings Roof Repairs

Corrections, KCIW , PeWee Valley
Estimate: $685,236.00

Remove existing rubber roof with ballest of the Recreational ,Vocational and Monarch Buildings located at the Kentucky Correctional Institution for Women in PeeWee Valley, Kentucky. Replace with a new Modified Bitumen Roof System. Base Bid shall be the Recreational Building, Alternate #1 the Vocational Building and Alternate #2 the Monarch Building.
Project shall include removing existing paraphet cap and replace with new. Remove and re-install existing lightening rods. Project shall re-use existing roof penetrations. Reflash existing mechanical curbs.
The project has special requirements such as site access, communications, vehicle parking, construction site security, etc. These requirements are included in the contract documents.

Shelby County, Kentucky

Click here to order

RFB-34-15 Re-Advertisement of RFB-5-14

Oakwood Speciality Clinic Intermediate care Facility
ESTIMATE: $1,895,069.00

The Oakwood Specialty Clinic Project entails the design and construction of an outpatient medical facility that is to be an extension and partial renovation to an existing medical facility on the campus of Oadwood Intermediate Care Facility in Somerset, KY. The new addition will be a single story, steel frame structure with a brick exterior and will contain approximately 6,700 gross s.f. of floor area that will contain new medical exam rooms, dental clinic and support offices. Renovation work will be limited to approximately 600 S.F. of the existing building and will involve remodeling of one corridor.

Somerset, Kentucky

Click here to order

Southside Elementary Renovation and Addition

Southside Elementary Renovation and Addition

The following bids are requested:
1 GENERAL TRADES
2 MASONRY
3 STEEL
4 ROOF
5 DRYWALL
6 ALUMINUM/WINDOWS
7 PAINT
8 VCT
9 TILE
10 FIRE PROTECTION
11 PLUMBING/MECHANICAL
12 ELECTRICAL
13 ASPHALT
14 COMBINATION

Beattyville, Kentucky

Click Here to View

A Price Contract for a portion of Louisville Metro Government’s Need for the Leasing of private owned office and warehouse space for twelve month #3269

A Price Contract for a portion of Louisville Metro Government’s Need for the Leasing of private owned office and warehouse space for twelve month #3269

Louisville, KY

A price contract for a portion of Louisville Metro Government’s need for the leasing of private owned office and warehouse space for twelve (12) month period.

Click Here to Order

14-133 / Tank Coating Program – Blankenbaker Crossings and Jefferson Memorial Tanks

14-133 / Tank Coating Program – Blankenbaker Crossings and Jefferson Memorial Tanks

Louisville Water Company is requesting Bids for recoating exteriors and limited interiors of two (2) existing elevated water storage tanks, including surface preparation, coating application, electrical work and miscellaneous tank accessories and site work.

Louisville, KY

Click Here to Order

14-134 / B.E. Payne Water Treatment Plant Mixer Renovation

14-134 / B.E. Payne Water Treatment Plant Mixer Renovation

Louisville Water Company is requesting Bids for the relocation of vertical mixers, bridges, and associated equipment in the treatment basins of the B.E. Payne Water Treatment Plant.

Louisville, KY

Click Here to Order

West Shelby Water District 2014 Upgrades

West Shelby Water District 2014 Upgrades

This contract consists of approximately 11,700 L.F. of 6″ PVC, SDR-17 waterline, 150 service reconnections, 750 L.F. of free bore for driveways and appurtenances. This contract contains an additive alternate that may be included with the base project if funding permits. Additional time will be given for said alternate .

Simpsonville, KY

Click Here to View

South Laurel Tennis Court Relocation

South Laurel Tennis Court Relocation

This project will provide relocation of six existing tennis courts at South Laurel High School due to relocation of a school entrance in preparation for widening US25 in front of the school. Grading and drainage, site improvements including concrete walk, chain link fence, asphalt, tennis court surfacing and accessories are part of this work.

London, KY

Click Here to View

CCK-1974-15 Panama Canal Sidewalk and Pence Hall Handrails

CCK-1974-15 Panama Canal Sidewalk and Pence Hall Handrails

At the Panama Canal sidewalk and at Pence Hall front stairs; remove existing handrails and install new handrails.

Lexington, KY

Click Here to View

Lexington Senior Center

Lexington Senior Center

Construction of a Replacement Senior Citizen Center in Lexington-Fayette County, Kentucky

Lexington, KY

Click Here to View

CCK-1973-15 Research Lab 3 Rooftop Units

CCK-1973-15 Research Lab 3 Rooftop Units

Contractor for furnish labor and material to replace roof top units on Research #3, AHU 2 & 5

Lexington, KY

Click Here to View

Construction Unit Price Contract

Construction Unit Price Contract

Unit pricing for use on various construction projects.

Consisting of the construction and/or furnishing of items for various small projects such as roadway construction, repair, sidewalks, storm water or sanitary sewer improvements in Lexington-Fayette County, Kentucky at work sites to be determined plus incidentals necessary to complete the work.

Lexington, KY

Click Here to View

Hopkinsville Water Environment Authority (HWEA) 12″ Natural Gas Main Extension

Hopkinsville Water Environment Authority (HWEA) 12″ Natural Gas Main Extension

Project includes the furnishing and installation of all materials, equipment, labor and incidentals required for the construction of: Tasks A, B, C, and D consisting of 34,600 linear feet of 4″ to 12″ diameter HDPE natural gas lines and associated appurtenances.

Hopkinsville, KY

Click Here to View

Jessamine County Public Library Addition and Renovation

Jessamine County Public Library Addition and Renovation

The scope of work shall include, but not necessarily be limited to the following areas – The construction of excavation for, poured concrete footings and foundation; concrete slab on grade; structural steel column + beam framing; cold-formed metal stud infill wall framing, prefabricated engineered light-gage metal roof trusses and FRT plywood roof deck, with fiberglass shingle roofing; metal prefinished continuous gutters, gutter guards, downspouts, and accessory flashings. Exterior trim work to be wood with prefinished metal wrap and metal soffits. Exterior shall be brick masonry veneer, with cut stone trim work, and EIFS wall areas, aluminum entrance doors & windows, Interior walls are metal stud with gypsum board panels, with hollow metal frames and pre-finished flush solid core wood, or hollow metal doors. Finishes include wood moldings for casings, and picture molding, rubber manufactured ECO flooring, cork rubber flooring, carpet, porcelain tile, ceramic tile, acoustic ceilings, acoustic wall covering, and multi-color spray painting and related painting. The work shall also include plastic laminated casework, solid surface counter tops, and wood paneled walls in certain areas. The work includes site utilities ; electrical, phone + TV cable wiring and service; mechanical – boiler replacement, VRV and make-up air HVAC systems, plumbing systems, wet-fire suppression system, connection to existing sanitary sewer system, storm sewer and detention items, electrical systems, lighting and fire alarm systems, access control, video monitoring, and building security systems. The work shall also include all of the related site work for excavation, building layout, temporary construction fencing & construction trailer; NOI, soil erosion control, excavation & fill; trench excavation , underground storm water drainage system, asphalt and concrete paving & striping of lot, concrete curb and gutter, concrete walks, vinyl coated chain link fencing, site lighting and landscaping .

Nicholasville, KY

Click Here to View

City of Williamsburg Waterpark RV Campground

City of Williamsburg Waterpark RV Campground

The project consists of approximately 1,100 LF of 3″ PVC waterline , 360 LF of :X” water service tubing , 17 ea. frost proof yard hydrants, 1 ea. pad mounted transformer, 1 ea. MOP, 2600 (+/-) LF electric service lines , 2300 LF (+/-) electrical conduit, 17 ea. metered 50/30/20 Amp pedestals, 1,200 LF of 8″ PVC gravity sewer, 600 LF of 6″ PVC sewer laterals, 7 EA 48″ diameter Precast Manholes, 150 LF 12″ and 14″ encasement pipe, 100 LF 15″ CMP drainage pipe, 600 LF 24′ access roadway, 1350 LF 12′ RV parking driveways, 17 ea. 10’x 10′ concrete patio pads , 17 ea. sewer connections, tie-ins to existing lines and services, appurtenances associated with water and sewer construction, pavement repairs, testing and disinfection, and landscaping restoration and seeding.

Williamsburg, KY

Click Here to View

14-59 B.E. Payne – Lagoon No. 3 Residual Removal

14-59 B.E. Payne – Lagoon No. 3 Residual Removal

Louisville Water Company is requesting Bids for the excavation, transportation, and disposal of approximately 219,640 cubic yards of water treatment plant residual material. Residual material shall be transported offsite by either truck or barge.

Louisville, KY

Click Here to Order

Louisville City Football Club Facility at Slugger FIeld Rebid #3265

Louisville City Football Club Facility at Slugger FIeld Rebid #3265

A contract to provide all labor, materials and other necessary equipment for the Louisville City Football Club Facility at Slugger Field.

Louisville, KY

Click Here to Order

City of Mt. Vernon Contract 2 Water Storage Tanks

City of Mt. Vernon Contract 2 Water Storage Tanks

Contract consists of one (1) 1,500,000 gallon ground level potable water storage tank and one (1) 500,000 gallon ground level potable water storage tank, with appurtenant mixing equipment, control valve, system connection piping, site work, and access roadways.

Mt. Vernon, KY

Click Here to View

City of Mt. Vernon Contract 1 Booster Pump and Water System Improvements

City of Mt. Vernon Contract 1 Booster Pump and Water System Improvements

Contract consists of approximately 3,100 feet of eight inch (8″) ductile iron pipe, (1) pre-fabricated, in-ground pump station, upgrade of (1) prefabricated, in-ground pump station , (2) in-ground solenoid stations , (1) tank control station, (2) high service pump control valves, and telemetry system upgrade.

Mt. Vernon, KY

Click Here to View

Subscribe