Louisville City Football Club Locker Room Facility at Slugger Field #3305
Louisville City Football Club Locker Room Facility at Slugger Field #3305
Request for Proposal a contract to provide all labor, materials and other necessary equipment for the Louisville City Football Club Locker Room Facility at Slugger Field.
Barbour Lane Pump Station Ventilation Upgrade and Odor Control Project
Barbour Lane Pump Station Ventilation Upgrade and Odor Control Project
Barbour Lane pump station is located at 4640 Barbour Lane, Louisville KY 40241. Project includes upgrade of the existing ventilation system to provide 12 air changes/hour and the addition of a carbon adsorber odor control sytem to treat the odorous air from the pump station wet well.
Project consists of the cleaning and testing of an existing raw water intake well, the installation of well column and above ground casing and column, elevated platform, pump, motor, motor control, electrical and telemetry systems, lightning protection, pre-cast vault, valves, manhole , and ductile iron waterline.
14-172 / Rehab – 60 Inch RCP — Bluegrass, Hazelwood, and Manslick
14-172 / Rehab – 60 Inch RCP — Bluegrass, Hazelwood, and Manslick
Louisville Water Company is requesting Bids for the supply and installation of 850 Internal Joint Seals, the removal, supply and installation of seven (7) access manholes, and the removal and installation of seven (7) air valves along the interior of approximately 11,000 feet of 60-inch concrete transmission main. Also included with the project is the reremoval, suply and installation of one (1) 12-foot section of 60-inch main and the rehabilitation or installation of new gate valves, air valves, drains, etc. per the attached plans.
I-75 Frontage Road Waterline And Sanitary Sewer Replacement
I-75 Frontage Road Waterline And Sanitary Sewer Replacement
The primary scope of work includes the installation of approximately 124 feet of 4-inch PVC force main, 2,557 feet of 8-inch, lO-inch, and 12-inch PVC gravity sewer, 721 feet of 12-inch PVC force main, 22 sanitary sewer manholes, 772 feet of 6-inch and 8-inch ductile iron waterline, 4,600 feet of 12-inch and 16-inch ductile iron waterline, various size and lengths of steel casing pipe (open cut and bore and jack), various service reconnections, and related appurtenances.
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for Walhampton Stormwater Improvements Project.
The New Taylor County Primary Center project consists ofa 57,461 square feet new construction. The Facility will be two story with ICF Structural Wall System with Brick, Metal Panel Veneer. Floor System will be Concrete Slab on grade and concrete on Metal Deck/Bar Joist. Roof will be low slope PVC Membrane on 6″, poly ISO Insulation / Bar Mechanical System will be VRF sized to accommodate future phases.
The site is located at 1209 East Broadway, Campbellsville, KY 42178
In general, Bid Package 5 includes the necessary work items required to furnish and install all building structural steel framework including but not necessarily limited to all structural steel shapes, bar joists, joist girders, steel composite floor deck, shear studs, steel roof deck, pan fill stairs, all miscellaneous steel floor edge and floor openings edge material, brick relief angles, all elevator related steel work and all steel embed-in-concrete items. Reinforced concrete floor slabs on metal composite decking and slabs-on-grade in basement and on the first floor including, but not necessarily limited to, vapor barrier, under slab drainage course, steel reinforcing, expansion joints and installation of all required embeds as per the construction documents, and acceptance of existing subgrade condition.
Louisville Water Company is requesting Bids for the furnishing and installation of 430 +/- linear feet of eight (8)-inch PVC DR 18 water main and 1,650+/- linear feet eight (8)-inch Ductile Iron Pressure Class 350 restrained and non-restrained joint water main. The installation of seven (7) 1” or smaller service PRV’s on Robert Burden Road. Installation of one (1) fire hydrant, and one (1) creek crossing, and restore site.
Please Note – the Technical Specifications and Plans for this rebid package are the same as the Technical Specifications and Plans for Design Release 3A and 3B. Only the Bid Manual is different.
This scope of work consists of thirty (30) Overhead Doors and one (1) Sectional Door.
CCK-1985-15 Stumbo Building Exterior Cleaning and Maintenance
CCK-1985-15 Stumbo Building Exterior Cleaning and Maintenance
The work includes maintenance and repair to the brick masonry, cleaning of the exterior windows, and cleaning of the metal panels. In addition, one add alternate is included for the installation of flashing and aluminum copings over the existing stone copings.
University of Pikeville – Hambley Boulevard Overhead Utilities Project – Rebid
University of Pikeville – Hambley Boulevard Overhead Utilities Project – Rebid
This project consists of providing all materials, labor and equipment necessary for the construction of an underground duct bank to facilitate relocation of overhead electric, phone, and other utilities, and relocation of a 12in. OJ. Waterline. Total project length is approximately 700 LF.
Middletown Sanitary Recapture Phase II – Section D and Chenoweth Run Interceptor Section 2 Project
Middletown Sanitary Recapture Phase II – Section D and Chenoweth Run Interceptor Section 2 Project
This Contract provides for the installation of approximately 2,176 linear feet of 10-inch sewer, 17 sanitary manholes, erosion control, stream bank restoration, and appurtenant work. The project is generally located along Chenoweth Run Creek and terminates near the intersection of Heafer Road and N. English Station Road.
Bid Package 6 is the flooring bid package. The previous Bid Package 1 included site utilities & excavation. Bid Package 2 included foundations and elevator, Bid Package 3 included the concrete frame, Bid Package 4 included the exterior skin and interiors bid package, and Bid Package 5 included final cleaning.
Roofing And HVAC Renovation For Coroners Office And Community Action Center
Roofing And HVAC Renovation For Coroners Office And Community Action Center
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Roofing and HVAC Renovation of the Coroner’s Office located at 247 East Second Street and the Community Action Center (CAC) located at 913 Georgetown Street, Lexington-Fayette County, Kentucky.
Timberlake and Hunting Creek South WQTC Demolition
Timberlake and Hunting Creek South WQTC Demolition
Construction will include the installation of 190 LF of 10″ sewer pipe, 122 LF of 24″ pipe, 191 LF of 8″ pipe, decommissioning of Timberlake and Hunting Creek South WQTC.
Clark County Public Library Partial Roofing Replacement and Interior Repairs
Clark County Public Library Partial Roofing Replacement and Interior Repairs
The project consists of the removal of portions of the existing metal roofing and replacement with new ice and water guard membrane and new metal roofing and snow guards with limited interior repairs in Winchester , Kentucky for The Clark County Public Library as shown on the contract documents prepared by Sherman Carter Barnhart Architects. The contractor is responsible for all permits, fees, and inspections.