Blue Grass Airport – Airport Shuttle Bus
Blue Grass Airport – Airport Shuttle Bus
Purchase of Airport Shuttle Bus
Lexington, KY
Blue Grass Airport – Airport Shuttle Bus
Purchase of Airport Shuttle Bus
Lexington, KY
City of Livingston – Sidewalk Construction Project
Construct approximately 1,840 SY of Concrete Sidewalk and Ramps
Construct 40 LF of 18″ Storm Pipe, 2 Storm Inlets and 1 Headwall
Construct approximately 1,500 LF of Concrete Curb and Gutter
Construct 673 SY of Concrete Entrance Pavement
Landscaping, Street Lighting, & Street Furniture
Livingston, KY
Click Here to View
City of Frankfort – Frankfort Transit Wash Bay Facility REBID
The project consists of but not limited to the construction of a new vehicle wash facility for the City of Frankfort, Frankfort Transit, (FKFT) . The 3350 square foot facility provides a 25’x 86′-8″ wash and detail bay for Frankfort Transit with adjoining storage, wash equipment, restroom, and lobby. The project also includes underground utilities serving the vehicle wash bay, and oil/water separator.
Frankfort, KY
RFP for the South Central Regional Library Construction Management (at risk) Services #3351
A Request for Proposals for the South Central Regional Library Construction Management (at risk) Services.
Louisville, KY
UK-1440-15 RFP for Audio Visual for Gatton College of Business & Economics
Provide the equipment, software, installation, training and maintenance services for a turn-key Audio Visual System for the University of Kentucky. The project consists of providing and installation of Audio Visual/ IT equipment for the renovation and addition to the Gatton College of Business & Economics.
Lexington, KY
City of Millersburg – Millersburg Bypass Waterline
Relocation of approximately 3,500 I.f. of 6-inch and 4-inch PVC water line and appurtenances
Engineer’s Construction Cost Estimate is $180,000.00
Millersburg, KY
Harrison County Water Association – Millersburg Bypass
Relocation of approximately 2,000 l.f. of 6-inch PVC water line and appurtenances
Engineer’s Construction Cost Estimate is $90,000.00
Cynthiana, KY
Bluegrass Airport Terminal Rooftop HVAC Units Replacement
The project consists of replacement of six rooftop HVAC units and all process piping, electrical connectivity, integration into the energy management system and roof elements.
Lexington, KY
Quiggins Sewer Main Replacement Project
Sewer Main Replacement
Radcliff, KY
2397.0 Football Training Facility Design Release 1 Enabling Package
The New Football Training Facility consists of approximately 100,000 sf addition onto the existing Nutter Field House. This addition will house multiple functions for the University of Kentucky Football Team. In addition, this project will include two new practice fields and associated site improvements. This first design release, DR1, shall include relocation of existing utilities, installation of an earth retention system, and excavation and fill of the building pad.
Group I Trade Contracts shall include:
TC 01A – Building Pad Excavation
TC 01B Water Utility Relocation
TC 01C – Electrical Utility Relocation
Lexington, KY
Louisville Metro Government’s need for Professional Plumbing Services #3340
A price contract for a portion of Louisville Metro Government’s need for Professional Plumbing Services for a twelve (12) month period.
Louisville, KY
NKCC-05-15 Observatory – Founders Hall: R3
Material, equipment and tools and services for Demolition; General; Plumbing; Fire Protection; Heating, Ventilating and Air Conditioning; and Electric Work for construction of: Astronomical Observatory
Highland Heights, KY
New Elementary School at Georgetown Road
The project scope includes material, equipment and tools and services for General; Plumbing; Fire Protection; Heating, Ventilating and Air Conditioning; Electric Work; and Communications and Technology for construction of a new elementary school of 73,943 square feet.
Lexington, KY
City of Hopkinsville 9th and Campbell Street Corridor Improvements Project
9th and Campbell Street Corridor Improvements Project includes the demolition of the existing curbs, sidewalks, site amenities and lights, the installation of new curbs, sidewalk pavement with pavers, site furnishings, signage, and landscaping.
Hopkinsville, KY
Louisville Metro Government’s need for Roofing Repairs & Maintenance for Metal Roofing Systems #3344
A price contract for a portion of Louisville Metro Government’s need for Roofing Repairs & Maintenance for Metal Roofing Systems for a twelve (12) month period.
Louisville, KY
North Hardin High School Addition and Renovation
Furnishing all labor, materials, supplies, tools, services, etc. necessary for the North Hardin High School Addition and Renovation
Radcliff, KY
CCK-2000-15 Dairy Barn
The Work of this Project consists of the following: Construction of a new 22,800 SF Dairy Housing Research and Teaching Facility. The facility consists of two clay floor animal holding pack areas separated by concrete slab cow feed bunk lanes and a middle concrete slab feeding drive lane. The structure is to be a pre-engineered metal building with prefinished metal roof panels and prefinished metal panel gable end wall. The site is greenfield, requiring minor grading. The site contains adequate borrow material.
Lexington, KY
Contract 45 – Danville Avenue Water Line Project
Project consists of approximately 10,600 feet of 8,6 & 4″ water line, and related facilities for the City of Stanford Water and Sewer Department.
Stanford, KY
CCK-2001-15 Sanders Brown HVAC Upgrade
The work includes but not limited to HVAC Upgrades in the Sanders Brown Building.
Lexington, KY
CCK-2002-15 UK Hospital Replacement Medical Air Compressor
The work includes but not limited to the replacement of a Medical Air Compressor in Pavilion HA, A.B. Chandler Medical Center.
Lexington, KY
Louisville Metro Government’s need for Low Pitch Roofing for a 12-month Period #3343
Louisville, KY
A price contract for a portion of Louisville Metro Government’s need for Low-Pitch Roofing for a 12-month period.
Louisville Metro Government’s need for Roofing Repairs and Maintenance for Shingled Roofing #3342
Louisville, KY
A price contract for a portion of Louisville Metro Government’s need for Roofing Repairs and Maintenance for Shingled Roofing for a twelve (12) month period.
CCK-1999-15 Cooling Plant 2 Replace Motor Control Center
This project is for the replacement of the motor control center for the Cooling Plant #2, and to provide a corrosion enclosure to shelter the new equipment from condensation from the cooling tower and weather.
Lexington, KY
Campbell Junior High School Renovation
The following bids are requested:
1 GENERAL TRADES
2 MASONRY
3 STEEL
4 ROOF
5 DRYWALL AND CEILINGS
6 STOREFRONT AND WINDOWS
7 VCT / CARPET
8 TILE
9 PAINTING AND SPECIAL COATINGS
10 ELEVATOR
11 FIRE PROTECTION
12 PLUMBING
13 ELECTRICAL
14 MECHANICAL EQUIPMENT SUPPLY ONLY
Winchester, KY
Click Here to View
Pleasant View Renovation Phase II
Furnishing of all labor, materials, supplies, tools, appliances, equipment, services, etc., necessary for the construction of Project, Pleasant View House Renovation – Phase II project, Richmond, KY.
Richmond, KY