Louisville Metro Government’s need for Bituminous Concrete (Hot Asphalt) & Liquid Asphalt Rebid #3434
Louisville Metro Government’s need for Bituminous Concrete (Hot Asphalt) & Liquid Asphalt Rebid #3434
A price contract for a portion of Louisville Metro Government’s need for Bituminous Concrete (Hot Asphalt) & Liquid Asphalt ReBid for a period of twelve (12) months.
The work is located in Lexington, Kentucky, on the University of Kentucky campus near the Gluck Equine Research Building and Nicholasville Road. Earthwork for parking lot with Underground detention basin; furnishing and installation of new storm sewer manholes; furnishing and installation of 15-inch, 18-inch, and 24-inch storm sewers and accessories; landscaping; installation of parking lot lighting, and accessories, removal of curb and gutter, and modification to drainage structures.
CONTRACT 5: LEVEE IMPROVEMENTS (Water & Sewer)
a.) 2 EA Remove existing sewer pump station and water control vault
b.) 34 CY Furnish and install flowable fill
c.) 470 LF Pressure grout existing lines
d.) 120 LF Cleans 8″ CIP
e.) 1 LS Miscellaneous items to be removed ie. Pipes, stumps, foundation, etc.
McCreary County Schools – Pine Knot Intermediate Roof Replacement
McCreary County Schools – Pine Knot Intermediate Roof Replacement
Project Description:
This project includes roof replacement of approximately 49,000 square feet. The majority of this demolition and installation work is asphalt shingles. New gutters and downspouts are included along with a vented nailbase insulated panel and interior ceiling replacement as well.
Western State Nursing Facility
Estimate:
$119,575.00
Creation of dedicated locations for IT system racks and associated equipment in the Nursing Building in support of the Electronic Medical Records (EMR) system; extension of fiber optic circuit overhead from the Main Hospital to the Nursing Building and to each of the IT rack locations; installation of electric circuits and devices at the IT rack locations; installation of IT circuits from IT rack locations to serve wireless access points located through the building; work will occur in Patient Areas and will require coordination with Western State Nursing.
Western State Hospital
Estimate:
$528,748.00
Creation of dedicated locations for IT system racks and associated equipment in the Main Hospital Building in support of the Electronic Medical Records (EMR) system; extension of fiber optic circuit to each of the IT rack locations; installation of electric circuits and devices at the IT rack locations; installation of panelboard; installation of IT circuits from IT rack locations to serve wireless access points located through the building; work will occur in Patient Areas and will require coordination with Western State Hospital.
North Mercer Water District – Deep Creek Road Bridge Replacement – Water Main Relocation
North Mercer Water District – Deep Creek Road Bridge Replacement – Water Main Relocation
The program of work for which bids are to be submitted consists of approximately 950 LF of water main, including approximately 250 LF directional drill under the Chaplin River, and all related appurtenances.
Washington County Historic Courthouse 2nd Floor Restoration Project
Washington County Historic Courthouse 2nd Floor Restoration Project
Minor demolition , items and Interior renovations to include gyp board walls and plaster repair ; and general plaster wall restoration ; interior painting ; interior wood trims ; new doors and frames ; Acoustic and other decorative metallic lay in Ceilings ; hardwood refinishing / repair and Ceramic tile ; custom cabinetry wood working . Slider reception service counter window with glazing . Window treatments for all the windows of the work are as , and general caulking and cleaning of all the windows of the work areas , int erior and exterior . Mechanical / HVAC system replacement and repair upgrades , including coil and duct cleaning of existing system; new mini split ductless cassettes for rooms of the work area of the project . General modifications and additions to the electrical system panels; new lighting / switches / receptacles / panels and breakers for new and added electrical fixture replacements
100 Sower Blvd. Frankfort, Kentucky
Estimate:
$ 55,165.00
The work for this project is located at two locations along Sower Boulevard in Frankfort, Kentucky. The descriptions of work for both locations are in the spec book.
Central Plant Upgrades – Central Lab
Estimate:
$313,000.00
Remove the existing 350 ton Chiller and install a new 700 ton chiller. The installation will include pump and piping replacement, electrical work and installation of 2 unit ventilators for cooling. The new chiller has been pre-purchased by the Owner. This contractor will accept delivery of, off load, be responsible for and coordinate start-up of the new chiller.
This work will be accomplished while the Chiller Plant is in operation. The contract will be required to block chilled and condenser water flow to the existing chiller. This is to be done by use of an insertion valve or another method to be decided by the Contractor.
UT Eagle Creek Stream and Wetland Mitigation
Estimate:
$1,094,600.00
The contract will be for the construction of a stream and wetland mitigation site located on the Higginson-Henry Wildlife Management Area in Union County, Kentucky. The contractor will be responsible for the grading of 5 restored stream channels on-site and in-stream modification of 6 existing stream channels. Grading will include the installation of several different in-stream structures and placement of gravel material in restored riffles. Additional site grading will include the installation of groundwater dams, grading historically modified wetland areas to proposed elevations, and removal and plugging of drain tiles in an active agricultural field. The contractor will be responsible for all sediment and erosion control measures. The contractor will be responsible for installation of live cuttings, bare root trees and containerized trees.
Provide all Work, including but not limited to labor, material, equipment supplies and transportation for:
Sutton School Apartments
411 North Hill Road
Sutton, West Virginia 26601
AU Construction is the General Contractor. All work negotiated, all divisions needed. Please send pricing as soon as possible to Roger Lashbrook at roger@auassociates.com
Middlesboro Independent Schools – Middlesboro High School Phase 1 Renovation
Middlesboro Independent Schools – Middlesboro High School Phase 1 Renovation
Project consists of existing roof replacement, HVAC and lighting systems replacement and alternates for renovations to the Elementary and High School toilets.
1. Project cost range is anticipated to be under $4,500,000.00.
Construction Contract: Bids will be received for the following Work:
1. General Contract (all trades).
City of St Matthews – Washburn Quiet Zone Improvements
City of St Matthews – Washburn Quiet Zone Improvements
The project provides for all labor, materials, and equipment necessary to provide roadway improvements to Washburn Ave in order to establish a Quiet Zone in compliance with Federa l Railroad Administration (FRA) regulations. CSX will concurrently repair the railroad approach slabs.
CCK-2038-15 McVey Hall Undergraduate Space Renovation
CCK-2038-15 McVey Hall Undergraduate Space Renovation
This project is for the renovation of 28 undergraduate spaces, on the first and second floors in McVey Hall. The spaces occupied by the Undergraduate Services will receive new interior finishes, doors, blinds, lighting, and fire alarm systems. Some spaces will receive a drop acoustical ceiling and minor space reconfigurations will be made to other spaces to accommodate the Undergraduate Service’s needs. A student lounge is also included in this design package and includes new finishes and a wall mounted TV. The UK preferred schedule of operations is that the first floor will be completed prior to any work commencing on the second floor.