Author Archive

Cawood Water District – Grays Knob Alternate Feed

Cawood Water District – Grays Knob Alternate Feed

This Contract consists of approximately 260 feet of six inch PVC water main, two wet tap tie-ins, a pressure reducing station and appurtenances.
Engineer’s Estimate: $28,600.00

Cawood, KY

Click Here to View

Hagan Properties Headquarters Office Building

Hagan Properties Headquarters Office Building

Subcontractors Only

Louisville, KY

Click Here to View

City of Somerset – Somerset Courtyard by Marriott Utility Construction

City of Somerset – Somerset Courtyard by Marriott Utility Construction

CONTRACT 177-1 5-01 (73)
Somerset Courtyard by Marriott Utility Construction

Somerset, KY

Click Here to View

Russellville Housing Authority – Roofing and Gutter Replacement

Russellville Housing Authority – Roofing and Gutter Replacement

Roofing and Gutter Replacement

Russellville, KY

Click Here to View

Housing Authority of McKee – Rocky Hill Heights Replace Sidewalks, Curbs, New Dumpster Pad

Housing Authority of McKee – Rocky Hill Heights Replace Sidewalks, Curbs, New Dumpster Pad

Replacement of sidewalks, curbs and installation of a new dumpster pad at Rocky Hill Heights

McKee, KY

Click Here to View

City of Pikeville – Marion Branch Sewer Project

City of Pikeville – Marion Branch Sewer Project

The project consists of two contracts:
Contract 1 – Furnish and install approximately 5,000 LF of 1 O” PVC gravity sewer pipe and 20 manholes.
Contract 2- Furnish and install approximately 5,000 LF of 10″ PVC gravity sewer pipe and 15 manholes.

Pikeville, KY

Click Here to View

City of Pikeville – Marion Branch Water Supply Project

City of Pikeville – Marion Branch Water Supply Project

The project consists of four contracts:
Contract 1 – Install 30,000 gallon skid tank and furnish and install a skid mounted pump station, approximately 3,000 LF of 4″ ductile iron water line, 700 LF of 8″ ductile iron water line, and 2,000 LF of IO” ductile iron water line, including valves and appurtenances.
Contract 2 – Furnish and install new VFD booster pump station, approximately 9,000 LF of 8″ ductile iron water line and 12,000 LF of 10″ ductile iron water line, including valve and appurtenances.
Contract 3 – Furnish and install new 1,000,000 gallon water storage tank and gravel access road.
Contract 4 – Furnish and install telemetry system for new water storage tank and pump station, 30,000 gallon skid tank and skid pump station.

Pikeville, KY

Click Here to View

LFUCG – Carver Center Restroom Renovation Rebid

LFUCG – Carver Center Restroom Renovation Rebid

Consisting of the items as listed in the Bid Schedule beginning on page P-6, Part Ill, Form of Proposal, of this document, for the Carver Center Restroom Renovation, 522 Patterson St., Lexington-Fayette County, Kentucky.

Lexington, KY

Click Here to View

RFB-237-15 Allen County Engineering Section Office

Department of Highways
Estimate:
$288,700.00
This Work includes the construction of a 2,000 sf office building at 702 S, Gallatin Rd, Scottsville, Kentucky. The building is slab-on-grade with wood framed walls, vinyl clad double hung wood windows, R-19 batt insulation, shop-fabricated wood trusses, asphalt
shingle roofing, and fiber cement siding. Typical floor finish to be vinyl composition tile, typical wall finish to be painted gypsum board, typical ceiling to be suspended acoustical tiles.Typical ceiling height to be 8’-0, typical bearing wall to be 10’-1. The HVAC system is an electric heat pump. The building will accommodate an occupancy of 21 and house the following rooms and functions: a large workroom with kitchenette, four private offices, a small conference room, men’s and women’s restrooms, mechanical room, custodial room, communications room, and reception room. The Work also includes a small concrete parking area (1 space, accessible). Consult project documents for information regarding connecting to site utilities.

Scottsville

click here to order

RFB-235-15 South Transportation Bldg Re-Roof Phase I

Somerset Community College
Estimate:
$147,150.00
The project consists of replacement of a section of roofing on the Transportation Building at the south campus of Somerset Community College.
The existing roof system is a built-up roof membrane over rigid insulation on metal decking. The section of roof being replaced (approximately 9,400 sf) will be demolished down to the existing metal decking. New insulation and a two-ply modified bitumen roof membrane will be installed. The roof deck has built-in slope. Tapered insulation will be used to form crickets as needed to direct runoff to existing drains. Existing copings will be demolished and new copings installed

Somerset, Kentucky

Click here to order

Phelps Athletic Facility Building Phase Bid Packages 4 thru 9

Phelps Athletic Facility Building Phase Bid Packages 4 thru 9

The following Bids are requested

04 GENERAL TRADES
05 ATHLETIC EQUIPMENT / BLEACHERS
06 PLUMBING AND HVAC
07 ELECTRICAL AND COMMUNICATIONS
08 ASPHALT PAVING
09 COMBINATION PACKAGE

Phelps, KY

Click Here to View

Williamstown Independent Schools – New Loop Access Drive

Williamstown Independent Schools – New Loop Access Drive

New Loop Access Drive

Williamstown, KY

Click Here to View

LFUCG – Man O War Boulevard Landscape Project

LFUCG – Man O War Boulevard Landscape Project

Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Man O’ War Landscape, Lexington-Fayette County, Kentucky.

Lexington, KY

Click Here to View

LFUCG – Newtown at I-75 Landscape Project

LFUCG – Newtown at I-75 Landscape Project

Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Newtown Pike at I-75 Median Landscape, Lexington-Fayette County, Kentucky.

Lexington, KY

Click Here to View

LFUCG – Newtown at Main Landscape Project

LFUCG – Newtown at Main Landscape Project

Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Newtown Pike at Main Street Landscape, Lexington-Fayette County, Kentucky.

Lexington, KY

Click Here to View

LFUCG – Oliver Lewis Way Landscape Project

LFUCG – Oliver Lewis Way Landscape Project

Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, ofthis document, for the Oliver Lewis Way Landscape project, Lexington-Fayette County, Kentucky.

Lexington, KY

Click Here to View

Winchester Municipal Utilities Recycling Center Concrete Pavement Replacement

Winchester Municipal Utilities Recycling Center Concrete Pavement Replacement

Concrete Pavement Replacement

Winchester, KY

Click Here to View

Rockcastle County Schools – Mount Vernon Elementary – Boiler Replacement

Rockcastle County Schools – Mount Vernon Elementary – Boiler Replacement

The bid is to furnish all necessary labor, materials, tools, machinery, warranties, and all other items required to replace an existing coal fired boiler and install a new electric boiler. Work to include, but not limited to; equipment demolition and disposal, minor building wall removal, piping insulation, hydronic piping, ventilation and electrical. Project also includes the replacement of an existing kitchen make-up air unit according to the contract documents

Mt. Vernon, KY

Click Here to View

Bullock Pen Water District – Looped Water Lines Phase 14

Bullock Pen Water District – Looped Water Lines Phase 14

Construction of Contract 1 – White Chapel/Chipman Ridge section of the Looped Water Lines, Phase 14 project will consist of construction of 1,440′ of 6″ PVC waterline, 500′ of 8″ HDPE waterline, jack & bored casing pipe, directional bored casing pipe, gate valves, wet tap, dry tap, air release valve, fire hydrant, bypass meter, and all other necessary appurtenances.

Construction of Contract 2 – Mitts/Chipman Ridge section of the Looped Water Lines, Phase 14 project will consist of construction of 2,720′ of 6″ PVC waterline, 160′ of 8″ HDPE waterline, service lines, directional bored casing pipe, gate valves, wet tap, dry tap, air release valve, fire hydrant, meters, and all other necessary appurtenances.

Construction of Contract 3 – Williamstown Master Meter Connection section of the Looped Water Lines, Phase 14 project will consist of construction of 1,940′ of 6″ PVC waterline, 520′ of 8″ HDPE waterline, jack & bored casing pipe, gate valves, wet tap, dry tap, air release valve, fire hydrant, master meter assembly, and all other necessary appurtenances.

Construction of Contract 4 – Vallandingham/Osborne section of the Looped Water Lines, Phase 14 project will consist of construction of 2,100′ of 6″ PVC waterline, 380′ of 8″ HDPE waterline, service lines, directional bored casing pipe, gate valves, dry taps, air release valve, fire hydrants, meters, concrete & pipe encasement, asphalt replacement, gravel driveway replacement, and all other necessary appurtenances.

Crittenden, KY

Click Here to View

RFB-227-15 Kentucky Dam Village Roof Replacement

Lodge and Guest Rooms
Estimate:
$857,000.00
This project consists of roof replacements on the Main Lodge and Nine (9) Guest Room Buildings.
Roofing Work:
a. Remove entire roof system down to roof substrate; inspect roof deck and repair as required, as per unit prices.
b. Replace 3×6 double tongue & groove as indicated on drawings.
c. Install new rigid insulation, tapered insulation, all metal components, and SBS-Modified Bituminous Membrane System as indicated on the drawings

Gilbertsville

click here to order

RFB-230-15 ADA Pool Lifts and Steps KY State Parks – East

Various Sites, Kentucky
Estimate:
$ 52,350.00
This Work includes providing and installing a battery power ADA Compliant Pool Lift Chair and/or ADA Compliant Pool Steps at the follow State Park Pools:
1. Natural Bridge State Resort Park
a. One battery powered lift with cover and transport caddy.
b. One set portable ADA compliant pool steps, sized for 3’-0″ pool depth.
2. Jenny Wiley State Resort Park
a. One battery powered lift with cover and transport caddy.
3. Greenbo Lake State Resort Park
a. Lodge Pool
1) One battery powered lift with cover and transport caddy.
B. Community Pool
1) One battery powered lift with cover and transport caddy.
2) One set portable ADA compliant pool steps, sized for 3’-0″ pool depth.
4. Carter Caves State Resort Park
a. Community Pool
1) One set portable ADA compliant pool steps, sized for 3’-0″ pool depth.

Various

click here to order

RFB-232-15 ADA Pool Lifts and Steps KY State Parks – West

Various Sites, Kentucky
Estimate: $24,800.00
This Work includes providing and installing a battery power ADA Compliant Pool Lift
Chair and/or ADA Compliant Pool Steps at the follow State Park Pools:
1 . Kentucky Dam Village State Resort Park
a. One battery powered lift with cover and transport caddy.
2. Barren River Lake State Resort Park
a. One battery powered lift with cover and transport caddy.
3. Dale Hollow Lake State Resort Park
a. One battery powered lift with cover and transoort caddY

Various KY

click here to order

RFB-228-15 Freedom Hall Roof and Fascia Repair Phase II

Kentucky Fair and Exposition Center
Estimate:
$1,234,641.00
Replace roof system on Freedom Hall, Kentucky Fair & Exposition Center, Louisville, Kentucky, including Areas A, A1, A2, B, B1, B2, E, F, G, H, I and J. The work includes removal of existing roofing systems, replacement roofing systems, roof-over systems, modification of Area A penthouse siding, roof accessories, refurbishment of roof drainage systems, EFIS repair and miscellaneous work related to the roofing.

Louisville, KY

click here to order

RFB-233-15 ADA Pool Lifts and Steps KY State Parks – South

Various Sites, Kentucky
Scope of Work:
Estimate: $ 44,200.00
This Work includes providing and installing a battery power ADA Compliant Pool Lift
Chair and/or ADA Compliant Pool Steps at the follow State Park Pools:
1. Cumberland Falls State Resort Park
a. One battery powered lift with cover and transport caddy.
b. One set portable ADA compliant pool steps, sized for 3′-0″ pool depth.
2. Levi Jackson State Park
a. One battery powered lift with cover and transport caddy.
b. One set portable ADA compliant pool steps, sized for 4′-0″ pool depth.
3. Fort Boonesboro State Park
a. One battery powered lift with cover and transport caddy.
b. One set portable ADA compliant pool steps, sized for 3′-0″ pool depth.

Various

click here to order

Adair County Bus Garage

Adair County Bus Garage

Project consists of construction of a bus parking lot, bus garage and employee parking.
1. Project cost range is anticipated to be under $1,250,000.
Construction Contract: Bids will be received for the following Work:
1. General Contract (all trades).

Columbia, KY

Click Here to View

Subscribe