Louisville Water Company is requesting Bids for the furnishing and installation by bore and jack method, 140+/- lineal feet of 30-inch steel casing pipe and 290 +/- lineal feet of 16-inch Pressure Class 350 ductile iron water main and appurtenances. Restoration of the site and all of the above made ready for use in accordance and compliance with the contract documents.
Louisville Water Company is requesting Bids for Installation of 370 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main, 2130 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main, 790 +/- linear feet of 4-inch Pressure Class 350 ductile iron water main, and the bore and installation of 45 +/- linear feet of 12-inch steel casing pipe. Also included with the project is the installation of 4 fire hydrants, the installation of 1 customer service, the transfer, renewal, relocation or discontinue of 25 customer services, and 1 meter exchange.
KY 1448 East Maple Leaf Water And Sewer Line Relocation
KY 1448 East Maple Leaf Water And Sewer Line Relocation
Installation of approximately 1,070 feet of 16″ PVC SDR-21, 9,542 feet 10″ PVC SDR21, 3,015 feet of 6″ PVC SDR 21 waterlines; 1,055 feet of 8″ gravity sewer, 2,044 feet of 3″ PVC SDR-21 force main, steel casing pipe (bore and jack) , 7 manholes, connections to existing waterlines and sewer lines, and various valves and appurtenances.
Work is to include installation of approximately 4,500 LF of 6-inch waterline. Flushing hydrants, (2) pressure reducing valves and a highway bore and jack.
Project consists of an existing one-story building used formerly as a restaurant renovated for use as a cooking business. Renovation includes complete rework of the building interior including walls and finishes, new restrooms, and new fire protection, plumbing, HVAC, and electrical. Building exterior renovation includes new exterior wall facings and entrance canopy and a limited scope of sitework.
Construction Contract: Bids will be received for the following work.
1. General Trades (all trades)
Construction includes but is not limited to demolition, grading, site utilities, concrete paving, site lighting, a decorative fountain, brick masonry, steel railings, pedestrian lighting, sod, seed and landscape planting.
This contract consists of approximately 18,000 L.F. of 12-inch transmission main, one underground booster pump station , one Solenoid Valve and appurtenances.
Project consists of removal and replacement of existing outdoor bleachers at the existing high school. Note, Owner is providing removal of existing materials and haul of offsite.
Maxwell Elementary School HVAC Replacement And Minor Renovation
Maxwell Elementary School HVAC Replacement And Minor Renovation
This work includes replacing 43 heat pump units located above corridor and classroom ceilings including hose kits, bypass pipes and startup. This replacement includes labor to install piping, ductwork, connections, controls rework, and electrical disconnecting and reconnecting. In order to access the heat pumps above the ceilings , in each room or corridor where a heat pump is to be removed and replaced, a portion of the existing ceiling grid will need to be removed to access the required MEP work, and new ceiling grid will need to be installed in those locations. All ceiling tiles in rooms or corridors where heat pumps are to be replaced, or as shown on the drawings are to be removed and replaced with new. An alternate will be included to replace all ceiling grid in rooms or corridors where heat pump units are to be removed and replaced.
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for the installation of approximately 4,710 linear feet of gravity sewer by open cut construction, 460 linear feet of steel casing by bore & jack, 715 linear feet of sewer line by pipe bursting and 34 manholes.
The work to be bid is divided into two major components and is described as follows:
Sidewalk, curbs and driveways entrances
This project consists of replacing sidewalks, curbs and driveways. The work will be in two phases , first on the south side of Sugg Street, then on the north side. Each phase will include the installation of underground utility conduits, and replacing the sidewalks. Installation of utilities within the underground utility conduit will be by others. The replacement sidewalks will be with a 4′ wide imprinted brick pattern in a red brick color. The curbs and driveways will be per current Kentucky Department of Highway specifications and standard detail.
Montpelier Mural
The repainting of an existing mural of the Montpelier Mural, located at the corner of South Main Street and Sugg Street on a concrete masonry unit (CMU) wall. The item for refurbishing is principally paint.
Eastern Kentucky University
Estimate:
$2,328,264.00
This project renovates the existing Commonwealth Hall on the campus of Eastern Kentucky University from a men’s dorm into campus office building.
The Renovations will begin on the top floors and work their way down. Only fan-coil units will be replaced on the 20th floor to prevent water damage on the floors below due to leaking existing fan-coil units. Starting with the 19th floor thru 15th floor, renovation will occur on 5 floors.
Typically dorm rooms will become individual offices. Some dorm rooms will be combined with adjoining rooms by demolishing the demising wall between rooms. These spaces will become Director’s offices, conference rooms, studios, and training rooms. Each office will be fit up with a new drywall ceiling and soffit and furred drywall sidewalls. Carpet tiles will be used in the corridors and all office spaces. New blinds will be installed in all exterior window openings. Doors and frames will be replaced with ADA accessible 2’-10” units with offset hinges. Doors will be full vision panels units of white oak prefinished veneer. Selected walls will be painted with Multi-spec paint to conceal existing wall imperfections. New light fixtures will be LED fixtures for energy savings and life-time cost savings. New fan-coil units will be installed in all spaces.
Existing Restrooms will be renovated to include new tile, new fixtures, and new toilet partitions to match the renovations in other areas. Fixtures will be low flow for better conservation.
Refer to Mechanical and Electrical narratives for additional descriptions of systems.
RFB-153-15 Upgrade Data Center Readiness CRAC Units
Cold Harbor Building
Estimate:
$131,050.00
The scope of work includes the replacement of power circuits to existing HVAC equipment, along with miscellaneous supporting construction.
AML Reclamation Project
Estimate:
$191,391.25
The Kelly Justice residence is located east of the community of Phyllis, at 37° 27’ 26” N and 82° 16’ 51” W. The site can be reached from the Kimper/Phelps exit by taking a left and traveling north on Route 194 to the junction with Route 632. Turning right to continue on 194, and continue to Phyllis. Elliot Justice Drive is on the left.