Jenkins Independent Middle-High School Bleacher Replacement
Jenkins Independent Middle-High School Bleacher Replacement
Bleacher Replacement
Jenkins, KY
Jenkins Independent Middle-High School Bleacher Replacement
Bleacher Replacement
Jenkins, KY
Russell Independent Schools – Health Careers Renovation
Furnish all necessary labor, materials, tools, machinery, warranties, and all other items required to renovate existing structure to meet plans and specifications. Work to include, but not limited to; metal framing, painting, ceilings, flooring, custom casework, lighting, electrical, hvac, roofing and plumbing.
Russell, KY
City of Shepherdsville – KY 44 Sewer Improvements – Lakeview Drive to Maple Street
KY 44 Sewer Improvements Lakeview Drive to Maple Street consists of the construction of approximately 3,035 L.F. of 12-inch sewer, 13 manholes and other appurtenances.
Morris Forman Water Quality Treatment Center Headworks Modifications
The work associated with this project include, but is not limited to, the following items:
Renovation of East Headworks, including:
1. Influent flume repairs
2. New chain and multi-rake bar screens
3. New vortex grit removal equipment
4. New grit cyclones and classifiers with a revised arrangement
5. Addition of a conveyor equipment access door
6. New grit and water scour piping
7. New built-up bituminous roof and equipment hatches
8. Demolished heaters inside the building and new heaters installed on the roof
9. Miscellaneous concrete repairs
Renovation of the West Headworks, including:
1. New influent gate actuator platform
2. New influent gate actuators
3. New chain and multi-rake bar screens
4. New screenings belt conveyors
5. New grit collection system
6. New grit screw conveyors
7. New channel aeration pipe and flow meters
8. New HVAC system
9. New W2 booster pump and piping
10. Miscellaneous structural improvements
11. New built-up bituminous roof
The project also includes site improvements in front of the East and West Headworks; actuator modifications at splitter structures upstream of the Headworks facilities; new downward opening weir gate and stop logs upstream of the West Headworks; electrical, instrumentation and control improvements in the Headworks facility; and primary sludge pump station piping and fitting modifications.
Louisville, KY
Newburg Community Center Design Build Roof Replacement #3408
A Request for Proposals to furnish all labor, material and necessary equipment for the Newburg Community Center Design Build Roof Replacement.
Louisville, KY
Click Here to Order
City of Lawrenceburg – Water Valve Replacement Project
The project consists of replacing 10 existing Water Valves ranging from 6 inches to 12 inches and appurtenances.
Lawrenceburg, KY
Panera Bread – Lexington Kentucky – Cafe 1018
THIS PROJECT IS FOR SUBCONTRACTORS ONLY
PANERA, LLC BAKERY CAFÉ # 1018
2220 NICHOLASVILLE ROAD-ZANDALE DRIVE
LEXINGTON, KY 40503
Housing Authority of Prestonsburg – Modernization Project
Site Waste-Line Replacement, Drainage Repairs, Dryer Vent Replacement and Concrete Stoop Textured Surfacing
Prestonsburg, KY
Click Here to View
YMCA Hamburg Place
Hamburg Place YMCA Project No 05122
2681 Old Rosebud Road
Lexington, KY
Lexington, KY
Higginson-Henry Wildlife Management Area KY Dept Fish and Wildlife
Estimate:
$1,094,600.00
The contract will be for the construction of a stream and wetland mitigation site located on the Higginson-Henry Wildlife Management Area in Union County, Kentucky. The contractor will be responsible for the grading of 5 restored stream channels on-site and in-stream modification of 6 existing stream channels. Grading will include the installation of several different in-stream structures and placement of gravel material in restored riffles. Additional site grading will include the installation of groundwater dams, grading historically modified wetland areas to proposed elevations, and removal and plugging of drain tiles in an active agricultural field. The contractor will be responsible for all sediment and erosion control measures. The contractor will be responsible for installation of live cuttings, bare root trees and containerized trees.
Union County, Kentucky
Grandstands Replacements
Sealed bids will be received by the Carter County Board of Education for Grandstand Replacement at East & West Carter Co. High Schools in Grayson.
Grayson, Kentucky
Flooring & Toilet
Sealed bids will be received by the Henry County Board of Education for Flooring at Campbellsburg Elementary School.
Campbellsburg, Kentucky
Lexington Fire Department Maintenance Building
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule for the Lexington Fire Department Maintenance Building, Lexington, Kentucky, which will be a 38’x l00′ concrete block building with poured concrete foundation, concrete slab, light gauge metal roof framing, plywood deck, asphalt shingle roof. The building will have electric service, basic lighting and power. There will be a floor drain system. The building is for apparatus and equipment storage.
Lexington, KY
Thomas Street Sidewalk Improvement Project
Sidewalk Improvements
New Albany, IN
Lebanon Middle School Roof Replacement
The project includes removal of approximately 78,000 SF of ballasted EPDM roof system and replacement with a 2-ply, modified bituminous membrane roof.
Lebanon, KY
City of Nicholasville – Mary Rose Pump Station Elimination
The scope of work includes the installation of approximately 770 LF of 8″ gravity sewer line and related appurtenances, and the decommissioning of an existing sewer pump station.
Nicholasville, KY
City of Lawrenceburg – Hilltop And Indian Trail Lift Station Elimination Project
The project consists of approximately 630 feet of 8″ Gravity Sewer, 5 Man holes and appurtenances.
Lawrenceburg, KY
City of Lawrenceburg – Maintenance Building Project
The project consists of a new maintenance building including but not limited to the pole barn building, foundation, plumbing, HVAC, electrical, finish work and all other items outlined in the construction plans.
Lawrenceburg, KY
15-19 I-65 Area Lead Service Renewal Project
Louisville Water Company is requesting Bids for the renewal of lead services on S. Brook St., S. Floyd St., E. and W. St. Catherine St., and E. and W. Oak St. Design information indicates a total of 94 customer service renewals, one (1) customer service relocate, 12 customer service discontinues and 14 meter exchanges.
Louisville, KY
15-16 Hale Avenue MRRP
Louisville Water Company is requesting Bids for installation of 60 +/- linear feet of 8-inch DR-18 C900 PVC water main (using traditional trench installation techniques), the installation of 540 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), the installation of 1,275 +/- linear feet of 6-inch DR-18 C900 PVC water main (using traditional trench installation techniques) and the installation of 1,780 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques). Also included with the project is the installation of 6 +/- fire hydrants and the transfer, renewal, relocation or discontinue of 116 +/- customer services.
Louisville, KY
Harrison County Schools – ATC Storage Building
The project scope includes the construction of a new, pre-engineered metal building with three storage bays, with approximately 1200 gsf. The project includes the demolition of the existing wooden structure, grading, concrete work, asphalt pavement and minimal electrical systems.
Cynthiana, KY
Meadows-Northland-Arlington Neighborhood Improvement Project, Phase 5D
Construct all associated sanitary and storm sewer piping and structures as shown on the construction plans and specifications for the Meadows-Northland-Arlington Neighborhood Improvement Project, Phase SD. Provide all erosion control measures, concrete sidewalk, curb and gutter, and asphalt paving as required for the project.
Lexington, KY
Marion-Crittenden County Airport Construct Maintenance Hangar
The project consists of furnishing and installing a 100′ x100′ pre-engineered maintenance hangar building and electrical components on a concrete slab with a 100’x80′ concrete apron expansion. Additional components of the project include approximately 830 CYDs of fill; installation of a domestic water line and sanitary sewer; and relocation of airfield electrical wiring. but no airfield lights.
Marion, KY
Housing Authority of Richmond Willis Manor 13-14
Willis Manor
A. Door Hardware Replacement
B. Installation of vinyl plank
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and incidentals as necessary for their completion.
Richmond, KY
South Hancock Elementary Waste Water Treatment Plant Contract 1 – Equipment Only
CONTRACT I – WASTEWATER TREATMENT PLANT REPLACEMENT – EQUIPMENT ONLY
a) 1 L.S. Wastewater Treatment Plant Equipment – 5000 GPO
Hawesville, KY