Big Sandy Community & Technical College
Estimate:
$ 65,000.00
Project consists installation of laboratory space air control system with fume hood controls. Contractor will be responsible for installation of ductwork, controls, components per drawings and testing and calibration of system. Ceiling, wall, electrical power, and plumbing systems are being furnished by others in a concurrent project
Big Sandy Community & Technical College
Estimate:
$ 35,000.00
Project consists of new potable and waste piping to new laboratory equipment being installed by others. A compressed air piping main will be tied into compressed air system and new piping shall be installed to the laboratory and to hose reels in auto body shop. Reels are furnished by Owner and installed by this Contractor.
Housing Authority of Fulton – Modernization Project
Housing Authority of Fulton – Modernization Project
Driveway/Sidewalk Improvements, Stoop/Patio Construction, Porch/Post Railing Installation, New Storage Buidings, Roof Replacement and Electric Meter Base Replacement
ADA Pool Lifts and Steps KY State Parks – West
Estimate: $24,800.00
This Work includes providing and installing a battery power ADA Compliant Pool Lift
Chair and/or ADA Compliant Pool Steps at the follow State Park Pools:
1 . Kentucky Dam Village State Resort Park
a. One battery powered lift with cover and transport caddy.
2. Barren River Lake State Resort Park
a. One battery powered lift with cover and transport caddy.
3. Dale Hollow Lake State Resort Park
a. One battery powered lift with cover and transoort caddY
RFB-12-16 Re-roof Sections of 3A, 5A, and Selected Decks
Bluegrass Station
Estimate:
$450,455.00
This project includes the installation of approximately 77,500 sf. of new roofing on Building 3, Bay A and Building 5, Bay A, and other selected decks at Bluegrass Station in Lexington, Kentucky. There are three Add Alternate decks being considered if funds allow. There are no known asbestos materials requiring removal or abatement. There shall be no lead based or asbestos containing materials installed on the project. Existing modified built-up roofing shall remain. New roofing shall consist of fully adhered 60 mil. Single ply TPO membrane roofing over new mechanically attached cover board . Existing sheet metal flashing will be re-used and supplemented with matching new metal where required. New gutters and downspouts are included. Roofing shall include 20- year no dollar limit warranty. Project will include covering approximately 5,600 sf. of clerestory windows with new factory painted steel siding. There is anticipated some roof repairs to be made as indicated on the drawings. There is some wet insulation requiring replacement. This Contractor shall include an Allowance of $15,000 for wet insulation replacement and deck repairs in their Proposal, and state Unit Cost per square foot to add or subtract from that amount. Deck repairs shall be accomplished with stated unit costs for work over and beyond that indicated on the Drawings.
Franklin County Cooperative Extension Office – Building Renovations and Addition REBID
Franklin County Cooperative Extension Office – Building Renovations and Addition REBID
Enclosing 108 square foot existing porch to create a vestibule at the first floor main entrance.
55 square foot addition to the basement main entrance.
Canopy addition to basement main entrance.
Interior office renovation.
The Work includes, but is not limited to, demolition, earthwork, termite control, asphalt paving, concrete work, rough carpentry, interior architectural woodwork, building insulation, exterior insulation and finish systems, asphalt shingles, sheet metal flashing and trim, firestopping, joint sealants, standard steel doors and frames, pre-hung wood doors and frames, folding doors, aluminum entrances and storefronts, door hardware, glazing, gypsum board assemblies, resilient floor tile, ceramic tile, carpet, acoustical wall panels, painting, cast signs, louvers and vents, electrical (power, communication, and lighting) systems, clean-up and removal of construction debris.
Franklin County Fiscal Court – Franklin Fire Station Communication Bid
Franklin County Fiscal Court – Franklin Fire Station Communication Bid
Communications cabling and installation associated with the construction of a new fire station building and associated site improvements on Franklin County Fiscal Court lots #6-#8 of the River Bend Office Park
This Contract is for the construction and installation of two cast-in-place diversion structures, 823 LF of 30″ sanitary sewer, 20 LF of 42″ sanitary sewer, 76 LF of 48″ trenchless casing pipe, 49 LF of storm sewer, and all other related appurtenances located near the intersection of Spring Street & Mellwood Avenue (CSO 093) and Spring Street & Locust Street (CSO 140) in Northcentral Jefferson County.
AMD Abatement Reclamation Project
Estimate:
$ 54,940.00
The Rudy Thomas Drainage Small Purchase AMD Abatement Project is located in Hopkins County near the community of Coiltown. It is accessed from KY 109 0.1 miles south of KY 1034 via a haul road to the right. N 37° 20’ 15.36” W 87° 40’ 51.24”. Problems associated with this site include acid mine water surfacing and pooling within the project area. Remedial measures include both surface ditches and subsurface drains to control this water and to properly route away from the problem area. All disturbances will be kept to a minimum. Silt control measures will be in place to minimize any silt from leaving the project area. All disturbed areas will be revegetated using lime, fertilizer, seed, and mulch. Estimated cost for abatement is $54,940.00. For continued project description, see Special Conditions
Central State Hospital
Estimate:
$ 40,300.00
This project includes the replacement of an existing water cooled chiller with a pre purchased centrifugal chiller. The new chiller shall be received and unloaded by this contactor. The existing chiller shall be disconnected from existing piping, electrical and controls. Existing piping, solids separator and pump shall be removed and replaced as required to move the new chiller in to position. The new chiller shall be connected to existing piping, electrical and controls and made operational.
Louisville Water Company is requesting Bids for Lead Service Renewals on Bank St., N. 26th St., and N. 31st St. Design information indicated a total of 91 customer service renewals, 10 customer service discontinues, and 17 meter exchanges.
DRGWQTC Gate 145 Electrical Service and Gate Actuator Replacement project
DRGWQTC Gate 145 Electrical Service and Gate Actuator Replacement project
Major components of the project include, but are not limited to, the following: 1) Remove and replace existing actuator and housing with new EIM electric actuator. 2) Removal and disposal of existing actuator housing and replacement with new aluminum housing. 3) Installation of new service pole, direct buried and concrete encased conduit, concrete pullboxes, 240V/480V dry transformer, 480V disconnect, manual transfer switch, wire, cable, conduit, PLC panel, and associated equipment and materials.
Anchor Estates Pump Station #1 & #2 Elimination Project
Anchor Estates Pump Station #1 & #2 Elimination Project
This contract is for the installation of approximately 10,000 LF of 8″, 10″ and 15″ sanitary sewers, 42 manholes, decomissioning of 3 pump stations and all appurtenances. The Project is located in Eastern Jefferson County in the city of Anchorage.
300 W. Broadway
Estimate:
$434,000.00
The project includes the repairs to the existing entry plaza located between the Old State Capitol and the Annex. The scope of work for this current construction project includes but is not limited to: selective demolition, removal and salvage of existing limestone paving units, removal of concrete protective slab and removal of existing waterproof membranes. The new work includes new waterproof membrane and flashing, new protective slab, reinstallation of limestone cladding and trim units, new concrete paving. The building will be occupied during the construction work.
Hazelwood Center
Estimate:
$151,750.00
The project consists of roof replacement on one (1) building; Roof Sections #2 & #3. Remove existing roof membrane system down to existing roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over base layer insulation, tapered insulation where indicated and cover board insulation. Provide crickets where indicated. Provide new metal components; e.g. metal counter flashings, scuppers, roof drain leads, plumbing vent flashings, etc