Author Archive

City of Pikeville – New Bridge/Approaches – US 23 to Marion Branch Industrial Park

City of Pikeville – New Bridge/Approaches – US 23 to Marion Branch Industrial Park

Project Description:
The work includes construction of a new bridge across the Levisa Fork and CSX Railroad and approximately 775 LF of approach roads. The bridge is a 628 foot, 4-span PCI beam structure.

Project Location:Pikeville, Kentucky

Click Here for More Details

Housing Authority of Floyd County – Hope Homes Apartments – Replace Exterior Windows

Housing Authority of Floyd County – Hope Homes Apartments – Replace Exterior Windows

Project Description:
Replacement of: 25 Twin Double Hung, Windows, 2 Single Double Hung Windows, and 2 Specialty Windows

Project Location:Langley, Kentucky

Click Here for More Details

Housing Authority of Liberty – Modernization Project

Housing Authority of Liberty – Modernization Project

Project Description:
Concrete Replacement, Entry Doors, Storm Doors, Guttering, Water Heater Replacement at site KY073-01A: Carmicle View Apartments.

Project Location: Liberty, Kentucky

Click Here for More Details

Knox County Utility Commission – Contract 17 Jeff Creek Waterline Extension – Installation of Materials

Knox County Utility Commission – Contract 17 Jeff Creek Waterline Extension – Installation of Materials

Project Description:
This project consists of the installation of approximately 6,600 LF of 4″ PVC waterline, 4, 100 LF of 3″ PVC waterline, and all necessary appurtenances.

Project Location: Barbourville, Kentucky

Click Here for More Details

Georgetown/Scott County Museum Roofing Replacement

Georgetown/Scott County Museum Roofing Replacement

Description:
Project consists of removal of the existing caulking and other work as indicated and as necessary for a complete, weather-tight, fully functional and operational, and finished installation.

Bids will be received for the following Work:
General Contract – Roofing Contract led with all necessary trades (includes limited plumbing and painting work).

Project Location: Georgetown, Kentucky

Click Here for More Details

LFUCG – Lower Cane Wet Weather Storage

LFUCG – Lower Cane Wet Weather Storage

ENGINEER’S ESTIMATE: $17 million

Project Description:
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for the construction of a Flow Diversion Structure with Screen, Wet Weather Pumping Station, 11 million gallon Wet Weather Storage Tank, Modulating Flow Return Structure, electrical building and emergency generator with sound annunciated enclosure. The project also includes sewer line construction to be routed to the existing Lower Cane Run Pumping Station influent junction box. The four sewer lines include a new 24″ force main under Interstate 75, relocation of a segment of the 12″ Horse Farm force main, relocation of a segment of the 15″ North Gravity line and a new 36″ gravity line from a new junction box to the existing junction box.

Project Location: Lexington, Kentucky

Click Here for More Details

N Mount Gilead Church Road Culvert Replacement Project

N Mount Gilead Church Road Culvert Replacement Project

Project Description:
The projects consist of replacing culvert on N. Mount Gilead Church Road in Scott County, Kentucky and reconstructing the approaches and installing guardrail.

Project Location: Georgetown, Kentucky

Click Here for More Details

Wood Creek Water District – KY 578 Water Line Relocation – Raccoon Creek

Wood Creek Water District – KY 578 Water Line Relocation – Raccoon Creek

Project Description:
This project consists of approximately 1,840 LF of 4″ PVC waterline, 5 tie-in connections and all necessary appurtenances. This is a relocation of existing facilities.

Project Location: London, Kentucky

Click Here for More Details

RFB-48-16 KET Digital Conversion – HVAC Installation

RFB-48-16 KET Digital Conversion – HVAC Installation

Project Manager Name: Bernard Engelman
Phone: (502) 782-0319
Email: Bernard.Engelman@ky.gov

Estimate: $ 74,580.00

Estimated Length of Project: 11/19/15 (Substantial Completion) + 12/01/15 (Final Completion)

Project involves providing new redundant dedicated HVAC systems for KET Digital Servers in an IT server room in the Capitol Annex. The building is located in Frankfort, Kentucky. Project base bid scope includes removal of duct work, installing new ductwork and diffusers, rework and re-balance of existing VAV boxes, relocating temperature sensors, providing two new ductless split systems including wall mounted indoor units, outdoor heat pumps, condensate and refrigerant piping. The completed server room HVAC systems to be controlled and monitored via interface to the building’s existing automation system.

Project Location:Frankfort, Kentucky

Click Here for More Details

Housing Authority of Harrodsburg – Bathroom Upgrades

Housing Authority of Harrodsburg – Bathroom Upgrades

Project Description
Bathroom Upgrades at site KY062-02

Project Location: Harrodsburg, Kentucky

Click Here for More Details

City of Hustonville – Water System Improvements

City of Hustonville – Water System Improvements

Project Description:
Project consists of approximately 7400 LF of 6″ waterline, 900 LF of 4″ waterline, 1100 LF of 3″ waterline, 6200 LF of service tubing, 500 LF of bored and open cut encasement, 15 ea. gate valves, 7 ea. blow off assemblies, 101 service re-connections, 400 LF of free bore, 4 ea. directional bores, 12 ea. Fire Hydrants, 710 LF of pavement replacement, and all necessary water line fittings and appurtenances. This is a replacement and upgrading of existing facilities.

Project Location: Hustonville, Kentucky

Click Here for More Details

Berea Emergency Medical Services Facility

Berea Emergency Medical Services Facility

Job Description:
The project scope includes 8,400 square feet of new construction.

Project Location:Berea, Kentucky

Click Here for More Details

Housing Authority of Lexington – Housing Management Team 1 Office

Housing Authority of Lexington – Housing Management Team 1 Office

Lexington Fayette Urban County Housing Authority
Housing Management Team 1 Office

Project Location: Lexington, Kentucky

Click Here for More Details

Sun Valley Park Tennis Court Renovations #3483

Sun Valley Park Tennis Court Renovations #3483

A Contract to furnish all labor, material and necessary equipment for Sun Valley Park Tennis Court Renovations.

Louisville, KY

Click Here to Order

15-111 / 24-Inch PCCP Replacement After Condition Assessment

15-111 / 24-Inch PCCP Replacement After Condition Assessment
Project No. 14099

Louisville Water Company is requesting Bids for the referenced project which consists of furnishing all labor, material, equipment and incidentals required for the removal of the old main, supply and installation of twenty-five (25) pipe sections of 24-inch PCCP transmission main along Preston Highway utilizing lay-in-place method as approximately shown on the drawings as specified herein. Please refer to the drawings for more details.

Project Location: Louisville, Kentucky

Click Here for More Details

H.A. of Danville Linietta KY 14-07 AMP 101

H.A. of Danville Linietta KY 14-07 AMP 101

Work will include the following: HOUSING AUTHORITY OF DANVILLE-CFP 501-15 ROOF, TRUSS, AND SIDING RENOVATION LINIETTA KY 14-07 AMP 101

Project Location: Danville, Kentucky

Click Here for More Details

RFB-46-16 Roof Repair KSP Post 10

RFB-46-16 Roof Repair KSP Post 10

Project Manager Name: Carl Kratzer
Phone: (502) 564-3155
Email: carl.kratzer@ky.gov

Estimate: $ 87,388.00

Estimated Length of Project: 90 (Substantial Completion) + 10 (Final Completion)

The project involves re-roof work at the Kentucky State Police Post 10 building in Harlan, KY. The existing approximately 4,900 square foot roof to be removed is an EPDM single ply system on top of another roof system on metal deck. The new roof system is a SBS Modified Asphalt Two Ply system that is cold adhered over a 3 1/2″ rigid board insulation with fully taper system. The existing stone coping will be covered with new sheet metal coping. A roof access ladder is to be installed as part of this project and is listed as Alternate #1. Roof Access Ladder. This is the only alternate item.

Project Location: Harlan, Kentucky

Click Here for More Details

RFB-45-16 Humidification Boiler Replacement

RFB-45-16 Humidification Boiler Replacement

Project Manager Name: Tony Yates
Phone: (502) 782-0338
Email: Tony.Yates@ky.gov

Estimate: $ 70,000.00

Estimated Length of Project: 90 (Substantial Completion) + 14 (Final Completion)

The project consists of removal of an existing low pressure electric steam boiler and soft water make-up system, and replacement with a new low pressure electric steam boiler and soft water make-up system used for humidification. The successful contractor will be responsible for the entire replacement including purchase cost, receiving, unloading, installing in their permanent location, and all manufacturer warranties. Contractor is responsible for all equipment and materials for a complete and working installation

Project Location: Louisville, Kentucky


Click Here for More Details

RFB-44-16 Bid Package I – Parking Lot Development ATC Ph 2

RFB-44-16 Bid Package I – Parking Lot Development ATC Ph 2

Project Manger Name: Dwayne Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov

Estimate: $566,123.00

Estimated Length of Project: 90 (Substantial Completion) + 30 (Final Completion)

This project consists of the development of a 142 space surface parking lot on the main campus of Owensboro Community & Technical College located on New Hartford Road. The scope of work consists of earthwork, stone base, asphalt pavement and concrete curbs, site lighting and sidewalks. A significant alternate is indicated to relocated approximately 2,500 CY of earth material to a different location on campus to remove a berm and prepare an additional site for future development.

Project Location: Owensboro, Kentucky

Click Here for More Details

RFB-43-16 Welding Shop Upgrade Big Sandy Comm & Tech College

RFB-43-16 Welding Shop Upgrade Big Sandy Comm & Tech College

Project Manager Name: Paul Cable
Phone: (502) 782-0324
Email: Paul.Cable@ky.gov

Estimate: $321,808.00

Estimated Length of Project: 121 (Substantial Completion) + 14 (Final Completion)

Project consists of adding masonry welding booths in an existing space. Space is to be painted, hardware to doors upgraded, and spray on sound proofing insulation shall be provided. Systems shall be installed include electrical power and exhaust system with dust collector to support the welding booths. Additionally the building’s existing electrical service will be replaced with a new electrical service.

Project Location: Paintsville, Kentucky

Click Here for More Details

Kentucky One Health – Jewish Hospital – New Open Office – 2nd & 5th Floors

Kentucky One Health – Jewish Hospital – New Open Office – 2nd & 5th Floors

Project Description:

Wehr Constructors is a Bidding GC on this project.

Development/ expansion of approximately 17,000 sf of office space located at 100 East Liberty Street floors 2 and 5, Louisville Ky 40202. Your firm is invited to submit a proposal for the Construction Services associated with the construction I renovation of this space.

Louisville, Kentucky

Click Here For More Details

WKU-PDC-2016-001 RFP New Parking Structure

WKU-PDC-2016-001 RFP New Parking Structure

Project Description:
The project is for the construction of a new parking structure to be located in the Creason Parking Lot of Western Kentucky University’s main campus. A site location feasibility study has been completed internally by WKU. The emphasis is on both minimizing the number of displaced existing surface parking spaces and maximizing the number of gained parking spaces. The impact on surface traffic circulation within the Creason Lot and adjacent surface streets shall also be investigated.

Relevant experience should include parking structure design, green design principles, access and revenue control equipment, traffic flow, transit service, and energy efficiency strategies.

Project Location: Bowling Green, Kentucky

Click Here for More Details

2402.4 Pavillion A Chiller Installation

2402.4 Pavillion A Chiller Installation

PROJECT DESCRIPTION: Installation of an Owner furnished 2500 Ton Water Chiller and the associated cooling tower in an existing utility plant. Requirement are MEP modifications and the construction of the cooling tower basin. Additions to tie the new equipment into the existing facility

Project Location: Lexington, Kentucky

Click Here for More Details

NKCC-10-15 Central Plant Chiller Installation

NKCC-10-15 Central Plant Chiller Installation

Project consists of installation of new 2500 ton water chiller, new cooling towers, new condenser water pump, new transformers, new VFD’s, and new sine wave filter, etc. at the Power Plant at Northern Kentucky University. Also included will be necessary mechanical, electrical and structural work to complete installation

Project Location: Highland Heights, Kentucky

Click Here for More Details

Dairy Queen Nicholasville Road

Dairy Queen Nicholasville Road

Project Description: The project consists of a freestanding American Dairy Queen Grill & Chill building – Breakfast

Project Location: Nicholasville, Kentucky

Click Here for More Details