Author Archive

Lincoln County Sanitation District – Phase 1 Contract 2 – US 127 Corridor Sanitary Sewer improvements Project

Lincoln County Sanitation District – Phase 1 Contract 2 – US 127 Corridor Sanitary Sewer improvements Project

The Project consists of:

Constructing SANITARY SEWER PROJECT US 127 CORRIDOR HUSTONVILLE TO JUNCTION CITY

Phase One Contract 2 (North Moreland) 32,387 feet of gravity sewer and 14,183 feet of force mains

Project Location: Stanford, Kentucky

Click Here for More Details

Lincoln County Sanitation District – Phase 1 Contract 1 – US 127 Corridor Sanitary Sewer improvements Project

Lincoln County Sanitation District – Phase 1 Contract 1 – US 127 Corridor Sanitary Sewer improvements Project

The Project consists of :

Constructing SANITARY SEWER PROJECT US 127 CORRIDOR HUSTONVILLE TO JUNCTION CITY

Phase One Contract 1 (Arcadia) 33,690 feet of gravity sewer and 14,335 feet of force mains

Project Location: Stanford, Kentucky

Click Here for More Details

RFB-99-16 Rappelling Tower Renovation

RFB-99-16 Rappelling Tower Renovation

Project Manger Name: Dwayne Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov

Estimate: $260,000.00

Estimated Length of Project: 180 (Substantial Completion) + 30 (Final Completion)

The Work in this Project shall include all labor, materials, tools, equipment, and services required to construct and install the complete and operational systems described herein and on the Drawings. The Project includes partial demolition of existing climbing wall and installation of new concrete foundations, new steel framed tower, new steel framed stairs, bracing and new rappelling station anchorage points. The Work will include supplying, installing, and testing to ensure proper operation of all systems.

Project Location: Muhlenberg, Kentucky

Click Here for More Details

RFB-98-16 Construct Fire Station Storage Building

RFB-98-16 Construct Fire Station Storage Building

Project Manger Name: Dwayne Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov

Estimate: $516,850.00

Estimated Length of Project: 240 (Substantial Completion) + 15 (Final Completion)

Construction of a 3,744 square feet masonry structure for storing fire apparatus vehicles and associated site work for the WHFRTC. The work includes General, Mechanical and Electrical Construction.

Project Location: Muhlenberg, Kentucky

Click Here for More Details

RFB-100-16 Harrodsburg NGA Roof Replacement

RFB-100-16 Harrodsburg NGA Roof Replacement

Project Manager Name: Carl Kratzer
strong> Phone: (502) 564-3155
Email: carl.kratzer@ky.gov

Estimate: $349,746.00

Estimated Length of Project: 90 (Substantial Completion) + 30 (Final Completion)

Work includes providing all required material, labor and equipment to perform selective demolition and associated reconstruction of project improvements as hereinafter described. Work includes complete removal and replacement of an existing 4-ply mop-down asphalt roof including roof insulation, edge trim, roof vents, coping caps, gutters and downspouts located on one (1) building in Harrodsburg, KY. The new roof is to be adhered (cold applied adhesive or mop-down) 2-ply SBS modified bitumen over rigid polyisocyanurate insulation. The deck is sloped corrugated metal and is to receive mechanically fastened base course and adhered insulation and cover board. New “A” style gutters with new downspouts and fascia trim are to be installed along all roof edges. A new snap-on aluminum coping system is to be installed on all parapet walls. Also included in the work is removal of caulk from masonry surfaces, window and door frames, patching, tuckpointing and water sealing of existing masonry and precast concrete; recaulking of windows and doors, and painting exterior doors and frames.

Project Location: Harrodsburg, Kentucky

Click Here for More Details

CCK-2074-16 TH Morgan Renovation of Lab 203 and 204

CCK-2074-16 TH Morgan Renovation of Lab 203 and 204

PROJECT DESCRIPTION:
THIS PROJECT IS FOR THE RENOVATION/UPGRADE TO ROOMS 203 AND 204 INTO NEW/UPDATED LABORATORY SPACE. EXISTING LABORATORY EQUIPMENT AND WORK STATIONS IN ROOM 204 WILL BE UPGRADED AND NEW ROOM FINISHES, LABORATORY EQUIPMENT, AND WORK STATIONS WILL BE ADDED TO ROOM 203. INDIVIDUAL OFFICES WILL BE ADDED IN ROOM 204 WITH WINDOW TO LOOK INTO THE LABORATORY SPACE. ROOM 203 AND 204 WILL BE OPENED UP AND MADE INTO ONE LARGER SPACE. A NEW EGRESS DOOR WILL BE ADDED. Lab Casework is under direct contract by customer -GC to coordinate installation.

Project Location:Lexington, Kentucky

Click Here for More Details

2402.1 PAV A Phase lF Green Roof

2402.1 PAV A Phase lF Green Roof

PROJECT #2402.1
PAVILION A — PHASE 1F GREEN ROOF
UNIVERSITY OF KENTUCKY
LEXINGTON, KENTUCKY

Project Location: Lexington, Kentucky

Click Here for More Details

Morehead Utility Plant Board – Water Treatment Plant Filter Rehabilitation

Morehead Utility Plant Board – Water Treatment Plant Filter Rehabilitation

The scope of work involves all material and labor for rehabilitating filters 1-5 as follows:
1. Filter Media Replacement and Nozzle Inspection (Filters 1-5)
2. Backwash Trough Replacement (Filters 1-2)
3. Chemical Cleaning of All Piping (Filters 1-5) and Troughs (Filters 3-5)
4. Pressure Washing Basins and Sidewalls (Filters 1-5)
5. Replacement of Loss of Head Display (Filters 1-5)
6. Replacement ofTurbidimeters (Filters 1-5 +Combined)
7. Replacement of Venturi Efiluent Flow Meters (Filters 1-4)
8. Replacement of Flow Meter Pressure Transducers (Filters 1-4)

Project Location: Morehead, Kentucky

Click Here for More Details

Warren East High School Phase II Group II -Athletic Fields and Buildings

Warren East High School Phase II Group II -Athletic Fields and Buildings

The following Bids are requested:
BID PACKAGE 020 – Hot Mix Asphalt Paving
BID PACKAGE 025 – Landscape
BID PACKAGE 030 – Concrete and General Trades
BID PACKAGE 031 – Synthetic Turf System
BID PACKAGE 032 – Latex Resilient Surfacing
BID PACKAGE 033 – Chain Link and Ornamental Fence
BID PACKAGE 034 – Baseball and Softball Field Construction
BID PACKAGE 035 – Polished Concrete
BID PACKAGE 040 – Masonry
BID PACKAGE 050 – Structural Steel and Miscellaneous Steel
BID PACKAGE 070 – Standing Seam Roof
BID PACKAGE 074 – Metal Wall Panels
BID PACKAGE 080 – Steel Doors, Frames, Flush Wood Doors and Finish Hardware
BID PACKAGE 084 – Aluminum Curtain Wall, Windows & Storefront
BID PACKAGE 092 – Gypsum Board and Acoustical Tile Ceilings
BID PACKAGE 093 – Tiling, Athletic Flooring and Indoor Artificial Turf
BID PACKAGE 096 – Athletic Wood Flooring
BID PACKAGE 099 – Painting and Joint Sealants

Project Location: Bowling Green, Kentucky

Click Here for More Details

RFB-95-16 Construct Range Storage Building

RFB-95-16 Construct Range Storage Building

Project Manger Name: Dwayne Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov

Estimate: $ 97,800.00

Estimated Length of Project: 180 (Substantial Completion) + 30 (Final Completion)

The work consists of a new one story, 100 feet long by 40 feet wide pole barn structure with one long side open. The building has gravel base floor area with metal roof panels and metal wall panels on two short sides and one long side. Structure consists of laminated pole columns, composite wood beams and factory fabricated wood trusses. Galvanized metal bird netting covers entire bottom surface of trusses.

Project Location: Greenville, Kentucky

Click Here for More Details

RFB-61-16 GSNF Campus Renovations

RFB-61-16 GSNF Campus Renovations

Project Manager Name: Carl Kratzer
Phone: (502) 564-3155
Email: carl.kratzer@ky.gov

Estimate: $219,205.00

Estimated Length of Project: 150 (Substantial Completion) + 15 (Final Completion)

This project involves the construction of a new storage building at the site where the original facility was located. The new structure will be of pre-engineered metal building construction and be of approximately 1,800 s.f. size, with an overhang space for outdoor equipment. The interior of the building will be divided into 2 parts with an enclosed storage room finished with drywall, and an open bay workshop area accessed by overhead doors. A small mezzanine area of approximately 600 s.f. will be constructed over the enclosed storage room.

Project Location: Glasgow, Kentucky

Click Here for More Details

City of Frankfort – Sewer Department Safety Improvements

City of Frankfort – Sewer Department Safety Improvements

Project Description:
Project consists of safety improvements of existing concrete stairs and platforms including the installation of aluminum handrails and guardrails for existing concrete stairs, platforms, and clarifiers, including all labor, materials, excavation and appurtenances.

Project Location:Frankfort, Kentucky

Click Here for More Details

Southland Family Club

Southland Family Club

Construction Contract: Bids will be received for the following Work:
1. Pool Contract
2. General Trades Contract

Project Location: Bowling Green, Kentucky

Click Here for More Details

2394.0 Construction Management Services for Hospital Facilities – Good Samaritan

2394.0 Construction Management Services for Hospital Facilities – Good Samaritan

Construction Management Services to Renovate/Upgrade Good Hospital Facilities – Good Samaritan

Project Location: Lexington, Kentucky

Click Here for More Details

Beargrass Creek Flood Pump Station Electrical Improvements & Beargrass Creek Flood Pump Station Vortex Supports

Beargrass Creek Flood Pump Station Electrical Improvements & Beargrass Creek Flood Pump Station Vortex Supports

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty St., Louisville, Kentucky 40203 for the construction of Beargrass Creek Flood Pump Station Electrical Improvements & Beargrass Creek Flood Pump Station Vortex Supports, Contract No. 15684, Budget ID No. F14l62, Drawing Record No. 15684 & 15739, Sheets 1 through 47 will be received at the office of MSD until 11 :00 AM Local Time, Thursday, October 22,2015, and will be publicly opened and read at that place and time.

Project Location: Louisville, Kentucky

Click Here for More Details

RFB-91-16 Boiler Feedwater System Replacement

RFB-91-16 Boiler Feedwater System Replacement

Project Manager Name: Marc Avery
Phone: (502) 782-0312
Email: marc.avery@ky.gov

Estimate: $ 97,100.00

Estimated Length of Project: 90 (Substantial Completion) + 30 (Final Completion)

Project involves the removal of the existing deaerator, condensate return unit and water softening systems from the Eastern Kentucky Correctional Complex in West Liberty, KY and reinstalling the items at Blackburn Correctional Complex, near Lexington, KY, along with new pumps, small revisions to the water, steam and condensate piping systems, pipe insulation, electrical service and minor pneumatic and electric controls work.

Project Location:Lexington, Kentucky

Click Here for More Details

City of Stanton – City Hall Building REBID

City of Stanton – City Hall Building REBID

Project Description:

Construction of a City Hall Building for the City of Stanton, Powell County, KY

Arch. est.. for construction.. $500,000.

Project Location: Stanton, Kentucky

Click Here for More Details

Spencer County Public Library Addition

Spencer County Public Library Addition

Project Description:
Renovation and construction of an addition to the existing Spencer County Public Library

Project Location: Taylorsville, Kentucky

Click Here for More Details

LFUCG Government Building & ArtsPlace Roof Replacement

LFUCG Government Building & ArtsPlace Roof Replacement

Project Description:
Project Consists of the construction and/or furnishing of items for the Roof Replacement for LFUCG Government Center and Arts Place, Lexington-Fayette County, Kentucky.

Project Location: Lexington, Kentucky

Click Here for More Details

CCK-2070-16 Ecological Research Facility Fence

CCK-2070-16 Ecological Research Facility Fence

PROJECT DESCRIPTION: The project consists of installing approximately 4,665 LF of 8′ -tall chain link fence at the University of Kentucky Ecological Research Facility (ERF), located at 1737 Russell Cave Road. Lexington. KY. This is a lump-sum project, not a unit-price contract, and Bidders are responsible for walking/measuring the path of the new fence to determine fence length for the bid. The fence will start and terminate at an existing similar fence and will include two sets of double 6′ swinging gates to accommodate automobile traffic. The majority of the fence line will require either bush-hogging, and/or clearing-and-grubbing of small to medium size trees, limbs, shrubs and weeds. This clearing is part of the contract.

Project Location: Lexington, Kentucky

Click Here for More Details

Fayette County Health Department – Third Floor Office Renovation

Fayette County Health Department – Third Floor Office Renovation

Project Description:
The scope of work includes the renovation of the third floor administrative offices at the Health Department’s main building, 650 Newtown Pike in Lexington, Kentucky.

Project Location: Lexington, Kentucky

Click Here for More Details

Charlie Vettiner Park Upper Lake Shelter Construction #3510

Charlie Vettiner Park Upper Lake Shelter Construction #3510

Project Description:
A Contract to furnish all labor, material and necessary equipment for Charlie Vettiner
Park Upper Lake Shelter Construction

Project Location: Louisville, Kentucky

Click Here for More Details

15-123 / Crescent Hill Grounds Maintenance & Crescent Hill Pump Station Office Lighting

15-123 / Crescent Hill Grounds Maintenance & Crescent Hill Pump Station Office Lighting

Louisville Water Company is requesting bids for labor, rigging, tools, equipment, and materials to replace light fixtures, lay-in ceilings, diffusers at the Crescent Hill Grounds Maintenance Building and the Pump Station Office.

Project Location: Louisville, Kentucky

Click Here for More Details

MFWQTC Quality Treatment Center Oxygen Generation and Supply Site Readiness

MFWQTC Quality Treatment Center Oxygen Generation and Supply Site Readiness

Project Description:
Description and location of Project: Relocation of existing pipe lines, lining of existing 18-inch pipe, installation of sheet pile retaining wall and electrical installation.

Project Location: Louisville, Kentucky

Click Here for More Details

RFB-92-16 HVAC Project Lexington National Guard Armory

RFB-92-16 HVAC Project Lexington National Guard Armory

Project Manager Name: David Boggess

Email: David.Boggess@ky.gov

Estimate: $ 95,606.19

Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion)

The project involves the complete removal of the existing HVAC system. This will include removal of the existing hot water boiler system, expansion tanks, housekeep pads, circ. pumps. Air separator and controls. In this project will include the installation of three new VRF systems, mechanical ventilation system which includes an energy recovery unit, a dedicated make up air unit, ventilation air ductwork and the installation of the refg. piping. This contractor will need to make all of the interlocks between equipment for controls.

Project Location: Lexington, Kentucky

Click Here for More Details