Bullitt County Area Technology Center Renovation – BP1 Restroom Renovation
Bullitt County Area Technology Center Renovation – BP1 Restroom Renovation
Project Description:
Furnishing of all labor, materials, supplies, tools, services, etc., necessary for:
BULLITT COUNTY AREA TECHNOLOGY CENTER RENOVATION
SHEPHERDSVILLE, KENTUCKY
16-46 / South Brook Street Area Lead Service Renewals
16-46 / South Brook Street Area Lead Service Renewals
Project Description:
Louisville Water Company is requesting Bids for the renewal of lead services on S. Brook Street, Camp Street, S. Floyd Street, S. Floyd Street Alley, E. Magnolia Avenue, E. Ormsby Avenue, W. Ormsby Avenue, and S. Preston Street. Design information indicates a total of 175 customer service renewals, seven (7) customer service discontinues and 43 meter exchanges.
Contract No. 11 – WWTP Improvements Chemical Feed & Phosphorus
Project Description:
The program of work for which bids are to be submitted consists of construction of certain wastewater treatment plant improvements consisting of but not limited to the construction of a new 55-foot diameter concrete circular clarifier and scraper-type equipment with controls, a new 18-foot by 39-foot concrete anaerobic basin with submersible mixers, piping and controls, a new chemical feed system with pumps, piping, and storage tanks, miscellaneous yard piping and valves, site lighting and electrical work, instrumentation and controls, and other miscellaneous items. All excavation is bid unclassified. Also included are all associated piping, mechanical and electrical as shown on the Drawings and described in the Specifications for the City of Hardinsburg Kentucky Wastewater Treatment Plant.
Project Description:
Louisville Water Company is requesting Bids for installation of 1,410 +/- linear feet of 12-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), the installation of 2,555 +/- linear feet of 8-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques), and the installation of 1,700 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main (using traditional trench installation techniques). Also included with the project is the installation of 11 +/- fire hydrants find the transfer, renewal, relocation of discontinued of 141 +/- customers services.
Franklin County Multi-Purpose Office Building Renovation
Franklin County Multi-Purpose Office Building
Project Description:
The project consists of renovation construction of an approximately 12,000 SF, two story facility complete with associated sitework, mechanical, electrical and plumbing. The existing building is wood framed with asphalt shingle roofing, interior gypsum board partitions and ceilings, ceramic tile, and wood flooring. New work consists of demolition, new gypsum board partitions and ceilings, new acoustical tile ceilings, new vct flooring, refinishing of existing wood and laminate flooring, painting, casework, and associated plumbing, lighting, power distribution and HVAC.
16-40 / West Main Street Area Lead Service Renewals
16-40 / West Main Street Area Lead Service Renewals
Project Description:
Louisville Water Company is requesting Bids for the renewal of lead services on 16th Street, 17th Street, 18th Street, 19th Street, 21st Street, 23rd Street, 24th Street, 25th Street, 26th Street, 27th Street, 28th Street, 29th Street, 30th Street, Cedar Street, Dr. WJ Hodge Street, Green Alley, Jefferson Street, Madison Street, Main Street, Market Street, Nelligan Avenue, Northwestern Parkway and Pirtle Street. Design information indicates a total of 141 customer service renewals, 12 customer service discontinues and 21 meter exchanges.
Parking Garage Rehabilitation 3rd Floor, Elevator Shaft and Stairwells
Parking Garage Rehabilitation 3rd Floor, Elevator Shaft and
Project Description:
The project consists of the Blue Grass Airport Parking Garage Rehabilitation – 3rd Floor, Elevator Shafts and Stairwells. Project elements include, but are not limited to, concrete patching and replacement of joint sealant, deck sealer, expansion joints, roofs and pedestrian traffic coatings. Further, some steel surfaces require rust removal and painting.
This project is for the construction of approximately 408 linear feet of 24 foot wide asphalt surfaced roadway, including related drainage and erosion control items. This project site is located at Bluegrass Station in Avon, Fayette County, Kentucky.
Project Description:
Project consists of the construction in Trimble County, Kentucky, of a one million gallon concrete pedestal composite elevated water storage tank and all necessary appurtenances and connections.
Three Track Renovation and Field House Restroom Renovation
Three Track Renovation and Field House Restroom
Project Description:
Furnishing of all labor and materials and the performance of all work required for:
BULLITT COUNTY PUBLIC SCHOOLS
THREE HIGH SCHOOL TRACK RENOVATION
AND NORTH BULLITT FIELD HOUSE RESTROOM RENOVATION
Owsley County Multi-Generation Center Phase 2 – Interior Fit-Up Package
Owsley County Multi-Generation Center Phase 2 – Interior Fit-Up Package
Project Description:
1. Project consists of the construction of the interior fit-up within the existing exterior shell of a pre-engineered metal building for the use of a Multi-Generation Community Center. The construction work includes, but is not limited to, interior walls, doors and frames, built-in casework, acoustical ceilings, all interior finishes, toilet partitions and accessories, electrical power, lighting, and systems, plumbing distribution and fixtures, HVAC distribution and systems, and other work as indicated
a. The interior gypsum wallboard and finishing on the exterior walls is included as part of the work of this contract
b. The interior window stools and cased openings are included as part of the work of this contract
c. The interior concrete floor slab and underground utility rough ins are part of the work of a previous contract and are NOT included as part of this contract. The interior finishes on the floor slab are included in this work.
2. The Project includes the mechanical, plumbing, electrical work required for the interior fit-up if the facility.
a. The extent of the electrical service entrance equipment, primary and secondary power supplies, rooftop equipment, ductwork, underground rough-ins and related components for these systems is partially complete and should be confirmed by the Contractor in advance of submitting bids
b. All connections, tie-ins, and related attachments and fittings required to complete these systems shall be included as part of the Work
c. Testing and inspections of the completed systems shall be included as part of the Work
3. The Project includes sitework for the construction of the parking area and other work as indicated.
a. The extent of the existing sitework, such as rough grading, utilities, storm drainage should be confirmed by the Contractor in advance of submitting bids
b. Any connections, tie-ins, and related attachments and fittings required to complete these systems shall be included as part of the Work
c. Testing and inspections of the completed systems shall be included as part of the Work
The work includes condenser water loop replacement involving two new cooling towers, three new pumps, associated piping and new structural platform for cooling towers.
The project involves the construction of a new farrier shed at the Kentucky Horse Park. The shed will be wood framed with wood truss framing in the roof. The exterior cladding will be cementious siding and the roof cladding will be metal panels.
This project group will address drainage problems and eight portals. The group has five separate locations in central Floyd County. For continued description, see Special Conditions.
CCK-2090-16 Chilled Water Line Replacement at University Drive
CCK-2090-16 Chilled Water Line Replacement at University Drive
Project Description:
This utilities update will include the demolition and removal of sections of old Chilled Water lines along University Drive near Cooling Plant #1 and replace with new lines and valves.
Berea Community School Renovation 1 & 2 Pirate Parkway
Berea Community School Renovation 1 & 2 Pirate Parkway
Project Description:
The Base Bid Work includes full replacement of the Elementary Pod HVAC System at Berea Community School and related interior & exterior architectural finish components to accommodate this Work, with one Bid Alternate. Berea Community School was originally built in 1967 with building additions in 1996, 2002 and 2005. The Scope of Work for this current project includes Base Bid Work for replacement of the existing Elementary Pod HVAC system with a new boiler & heat pump system to include a new wheel and plate energy recovery system and all related roof & architectural work [interior & exterior] needed to successfully complete this replacement. Bid Alternate No. One is to provide thermal & acoustical upgrades in the center instructional spaces of the Elementary Pod, including new gypsum board upper walls with steel inserts through existing lower walls, repainting & plaster repair, lighting and fire protection to thermally separate these EIGHT instructional spaces. The work effort will be executed in one principal phase of on-site work beginning in late May 2016 and ending in early August 2016, with an initial phase for ordering of material in March-April-May 2016 prior to the on-site work commencing.
Shelby County High School Gym Sound System and Technology Upgrade
County High School Gym Sound System and Technology Upgrade
Project Description:
Furnishing of all labor and materials and the performance of all work required for the
Gym Sound System & Technology Upgrade
Shelby County High School
1701 Frankfort Road
Shelbyville, KY 40065
NKU Health Innovation Center-Founders Hall Renovation BP2a – Window Replacement
NKU Health Innovation Center-Founders Hall Renovation BP2a – Window Replacement
Project Description:
The project is generally described as the Northern Kentucky University, Health Innovation Center HIC/Founders Hall Renovation. The project is located in Highland Heights, Kentucky, on approximately 3.0 acre site on the NKU campus, east of Kenton Drive, west of Nunn Hall and directly north of Griffin Hall. The project will include the removal of existing exterior windows and installation of new windows in Founders Hall.
16-35 / Lebanon Junction Master Meter 4 (20″ Transmission Main to HCWD 2)
16-35 / Lebanon Junction Master Meter 4 (20″ Transmission Main to HCWD 2)
Project Description:
Louisville Water Company is requesting Bids for the furnish and install of one (1) underground packaged master meter vault station including excavation, unloading the station from the delivery truck, reinforced concrete pad, sump pump. piping connections to existing mains, eight (8) inch Pressure Reducing Valve, site restoration, electrical and telemetry connections. start up and calibration of Station. Furnish and Install 70 +/- LF of eight (8) inch Ductile Iron PC 350 water main. Furnish and install two (2) eight (8) inch Neptune High Performance (HP) Protectus III Fire Service Meters. Furnish and install vehicle access area and gate per plans. Provision of 120/240 Volt, single phase underground electrical service at the Lebanon Junction Master Meter Vault site, service pole. installation/connection of telemetry controls.
New Highland Elementary and North Park Elementary School and North Park Security Fence
New Highland Elementary and North Park Elementary School and North Park Security Fence
Project Description:
Furnish all labor and materials to complete the:
Vestibule Upgrade at New Highland Elementary School and North Park Elementary School and North Park Security Fence
Middle Creek Battlefield Walking Trail Improvements
Middle Creek Battlefield Walking Trail Improvements
Project Description:
Floyd County Fiscal Court – Middle Creek Battlefield Walking Trail Improvements
construction including, but not limited to:
asphalt walking trail and concrete ADA-compliant ramps