CCK-2082-16 College Of Nursing- NICU Patient Room Mock-Up
CCK-2082-16 College Of Nursing- NICU Patient Room Mock-Up
Project Description:
This package involves the Interior Fit-Up work for the Phase 1 F Renovate/Upgrade UK Healthcare Facilities – NICU Renovations. The work will be performed under contract with the Construction Manger, Turner Construction Company.
Separate bids for this project shall be submitted for the following work categories:
This project is for the construction of an 80’ x 100’ pre-engineered rigid framed metal building to serve as a county highway maintenance garage. The Garage area is 60’ x 100’, consists of 2 bays, with 16’ wide x 14’ high insulated sectional overhead doors on each bay end. Administrative Area is 20’ x 100’. The building has cast-in-place concrete floors that are 8” thick in the garage area and 4“ thick in the Admin. Area. Each bay has a trench drain with a combined water/oil separator. Garage and Admin exterior walls and columns are set on 8” high raised concrete curbs/bases. Finishes in the Administrative area include resilient tile flooring and base, painted gypsum walls, and acoustical paneled and painted gypsum ceilings and soffits. The garage will have exposed framing with R-30 simple saver batt insulation and poly-scrim facing and interior metal liner panels. PEMB Roof will be standing lock seam with concealed fasteners. Exterior walls are to be 16” wide, 24 ga. interlocking panels. Site work includes excavation, grading, storm water line picking up downspouts along one side of the building, and surface drainage; aprons at the garage bay doors and concrete walks and pads at doors and entries; crushed stone base and asphalt base and surface course. Site lighting is included and is to be coordinated with Bluegrass Energy. Site is to be sowed in seed. Utilities will be brought to the building from the R/W line with underground electrical to the building. A water / oil separator will serve the bay area and the building will have a septic and lateral field system. Mechanical system is a 4 ton 80k BTU forced-air natural gas-fired fuel efficient furnace and condensing unit serving the Admin. Area and four suspended gas- fired unit heaters in the four corners of the garage. Electrical includes 120/240v, 1 phase, 3 wire, 400 amp service to feed two (2) 200 amp panel boards. The electrical service will be served from a pole mounted transformer bank with underground conduit and conductors. Propane Gas Service will be provided and the Contractor is provide all gas piping, venting, and valving from the regulator into the building and in the building. A 2” domestic service water line and meter are required. There will be no water line tap fee for this project. For continued project description, see Special Conditions.
LFUCG – West Hickman WWTP Administration Building Expansion / Improvements
LFUCG – West Hickman WWTP Administration Building Expansion / Improvements
Project Description:
The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for West Hickman WWTP Administration Building Expansion / Improvements.
Project Description:
Sealed bids will be received by the Nicholas County Board of Education for construction of a new Nicholas County Elementary School.
MFWQTC – Main Equipment Building Leak Repair Project REBID
MFWQTC – Main Equipment Building Leak Repair Project REBID
Project Description
Description and location of Project: All horizontal & vertical joints on the exterior of the entire Main Equipment Bldg including joints inside the parapet of the East high roof are to be removed and repaired. (Grind out to depth of 2-inches. Clean, add new grout as needed, backer rod and multi-part sealant as per bid documents.) Also install pre-finished aluminum coping to the East high roof (along North, South, and East parapets) as per bid documents. Project located at Morris Forman Water Quality Treatment Center (MFWQTC). 4522 Algonquin Parkway, Louisville KY 40211.
The Burley Oil Parking Lot Resurfacing project includes the removal of approximately 11,000 square feet of deteriorated parking lot and placement of approximately 11,000 square feet of 6-inch reinforced concrete paving. Traffic control will be required for work within the existing right-of-way. The project is located at 632 Versailles Road, Frankfort, KY 40601.
CCK-2083-16 Ag Science Center North – Renovation of Labs N323 & N325
CCK-2083-16 Ag Science Center North – Renovation of Labs N323 & N325
Project Description:
Renovation of Labs N323 and N325 and ancillary rooms – work include finishes upgrades to walls, ceilings and floors. Work also includes upgrades to cabinetry, plumbing/utilities, hoods/HVAC, and electrical power/lighting.
Knox County Board of Education – Lynn Camp Elementary Reroof
Knox County Board of Education – Lynn Camp Elementary Reroof
Project Description:
The project scope includes but is not limited to the following: Complete reroof of the existing Lynn Camp Elementary School. Installation of new insulation, color PVC membrane, perimeter flashings, gutters, downspouts, and rework of existing masonry thru-wall flashings. The existing structural metal roofing system will remain in place. Miscellaneous flashings and trim will be removed to accept the new work.
Project Description:
Consisting of the construction and/or furnishing of items as listed in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, of this document, for the Foundation for Fire Training Tower, Lexington-Fayette County, Kentucky
OCEA – Orchard Grass Waste Water Treatment Decommissioning Phase 1A
– Orchard Grass Waste Water Treatment Decommissioning Phase 1A
Project Description:
The project generally consists of
FORCE MAIN
Installation of approximately 3000 feet of 12 inch PVC force main with ductile iron fittings, air release valves, bore and jack or open cut creek crossings, connection to an existing force main, and all other items shown on the plans and mentioned in the specifications for a complete project, ready for continuous operations.
WWTP OUTFALL
Installation of approximately 2,600 feet of 16 inch of PVC outfall with ductile iron fitting, air release valves, an open cut road crossing, connection to existing outfall at the South Oldham Regional Plant, construction of a flared end section and riprap at the discharge location and all other items shown on the plans and mentioned in the specifications for a complete project, ready for continuous operations.
City of Frankfort – Sewer Department – Levee Penetration Sewer Rehabilitation
City of Frankfort – Sewer Department – Levee Penetration Sewer Rehabilitation
Project Description:
The Work includes open cut replacement of two sewers under flood control infrastructure, reconstructing the disturbed portions of the flood control infrastructure, removing two manholes, and installing two new manholes. The flood control infrastructure expected to be disturbed includes a concrete base slab and cutoff wall. Planter boxes sitting on top of the base slab will need to be temporarily removed.
West Shelby Water District – New Headquarters & Maintenance Facility
West Shelby Water District – New Headquarters & Maintenance Facility
Project Description:
Scope of Work consists of, but is not limited to the following:
• Site work
• Concrete foundations
• Structural steel
• Wood
• Stone & Brick
• Wood stud & gypsum wall board construction
• Hollow metal doors & frames
• Shingle roofing
• Casework
• Finishes
• Metal Building Construction for Maintenance Facility
• Electrical
• HVAC
• Plumbing
Project Description:
A price contract for a portion of Louisville Metro Government’s need for Window Treatments
for a twelve (12) month period, per the attached specifications.
Project Description:
A Contract to furnish all labor, material and necessary equipment for Urton Lane Bridge
Construction, per attached specifications.
Project Description:
A price contract for a portion of Louisville Metro Government’s need for Painting Services
for a twelve (12) month period, per the attached specifications.
Bowling Green-Warren County Regional Airport – Airfield Pavement Marking Improvements
Bowling Green-Warren County Regional Airport – Airfield Pavement Marking Improvements
Project Description
Bowling Green-Warren County Regional Airport intends to engage a qualified contractor to paint airfield markings on Runway 3-21 and associated taxiways at the Bowling Green Warren County Regional Airport. The work is to be completed before the end of the 2015 calendar year if possible.
Town of Clarksville – Clarksville Aquatic Center Redevelopment
Town of Clarksville – Clarksville Aquatic Center Redevelopment
Project Description:
This project includes the redevelopment of the Family Aquatics Center pool to a lap pool, slide pool and new splash pads as well as a new shelter, deck areas, lighting, utilities, landscaping, other park amenities, and all other items necessary for construction of a complete project.
Project Description:
Consisting of the construction and/or furnishing of items in the Bid Schedule beginning on page P-6, Part III, Form of Proposal, and as indicated in the construction documents and drawings, for the Replacement Fire Station No. 2 located in Lexington-Fayette County, Kentucky.
This project consists of the replacement of the swimming pool filter with a new hi-rate sand filter system complete with pressure gauges, and manual backwash valve assemble, installation of a new 15 hp pump with new controls and wiring hook-up, installation of a new surge tank located outside the building, installation of a new backwash retention tank located outside the building, installation of a new chemical controller, installation of a new mechanical room ventilation fan in new location, installation of a new flow meter, associated wiring and light replacement in the mechanical room, and new piping connecting equipment in the mechanical room. Major components of the project include the following: HI-RATE SAND FILTER SYSTEM AND PUMP and SURGE TANK AND BACKWASH TANK.