CCK-2175-17 E.S. Good Barn HVAC Upgrades
CCK-2175-17 E.S. Good Barn HVAC Upgrades
PROJECT DESCRIPTION:
This HVAC project is to update various item including but not limited to the
following: Re-Heat Coils, Replacement Steam Vent piping, LPS Piping, LPC
Piping, New VFD, Enlarge Sump Pit, etc. This project also includes 4 alternate bids
including additional re-heat coils, piping, new discharge, etc.
Schedule of Alternates:
* Alternate #1 PROVIDE REHEAT COIL, ASSOCIATED PIPING, RELOCATE
EXISTING AND PROVIDE NEW DISCHARGE AIR TEMPERATURE SENSOR,
PROVIDE HUMIDITY SENSOR, AND ALL CONTROLS REQUIRED FOR
REHEAT INSTALLED COMPLETE FOR AHU-8 SERVING GORHAM HALL.
REFER TO DRAWINGS AND SHEET NOTES FOR ADDITIONAL ALTERNATE #1
SCOPE OF WORK.
* Alternate #2 PROVIDE REHEAT COIL, ASSOCIATED PIPING, RELOCATE
EXISTING AND PROVIDE NEW DISCHARGE AIR TEMPERATURE SENSOR,
PROVIDE HUMIDITY SENSOR, AND ALL CONTROLS REQUIRED FOR
REHEAT INSTALLED COMPLETE FOR AHU-7 SERVING COULTON SUITE.
REFER TO DRAWINGS AND SHEET NOTES FOR ADDITIONAL ALTERNATE #2
SCOPE OF WORK.
* Alternate #3 PROVIDE REHEAT COIL, ASSOCIATED PIPING, RELOCATE
EXISTING AND PROVIDE NEW DISCHARGE AIR TEMPERATURE SENSOR,
PROVIDE HUMIDITY SENSOR, AND ALL CONTROLS REQUIRED FOR
REHEAT INSTALLED COMPLETE FOR AHU-5 SERVING WELDON SUITE.
REFER TO DRAWINGS AND SHEET NOTES FOR ADDITIONAL ALTERNATE #3
SCOPE OF WORK.
* Alternate #4 PROVIDE REHEAT COIL, ASSOCIATED PIPING, RELOCATE
EXISTING AND PROVIDE NEW DISCHARGE AIR TEMPERATURE SENSOR,
PROVIDE HUMIDITY SENSOR, AND ALL CONTROLS REQUIRED FOR
REHEAT INSTALLED COMPLETE FOR AHU-6 SERVING ADMINISTRATION
WING. REFER TO DRAWINGS AND SHEET NOTES FOR ADDITIONAL
ALTERNATE #4 SCOPE OF WORK.
Project Location: Lexington, Kentucky