RFB-245-17 Re-Ad of 169-17 Jefferson CTC Aviation Program

RFB-245-17 Re-Ad of 169-17 Jefferson CTC Aviation Program

Project Manager Name: Anne Saint-Aignan
Phone: (502) 782-0337
Email:anne.saintaignan@ky.gov

Estimate:
$621,818.00
Estimated Length of Project:
150 (Substantial Completion) + 30 (Final Completion)

The Work consists of a new hangar building including a base bid of 3,342 square feet and an additive alternate of one bay containing 987 square feet. The Work includes site development and the extension and connection of all utilities. The building is a rigid frame pre-engineered metal building. Included in the work is a 40’ wide x 12’ rolling hangar door. There will be a men’s and women’s restroom and a closet that will be constructed with metal framing and drywall.
Fire Protection: A new underground fire protection water service is to be extended to the facility and wet sprinkler system installed.
HVAC system: Shall be a heated and ventilated facility, no cooling. All heating in the hangar area will be provided by gas fired radiant tube heaters. Heating in the rest rooms will be provided by electric resistance unit heaters.
Plumbing: Consists of two bathrooms with 3 water closets, 2 lavatories, and a mop sink located in a janitor’s closet. Floor drains are located in the rest rooms and hangar area.
Electric: A new 120/208 volt three phase 4 wire wye 400 ampere electric service panelboard will be installed. This new underground service will be fed by tapping the secondary of the existing 750 KVA transformer serving Social Science building.
Lighting will be hi bay LED with several emergency battery paks used for emergency lighting. Branch circuits for owner supplied equipment (welders, magnaflux machine) and HVAC equipment are included. Wiring devices will be located throughout the facility.
Exterior lighting is comprised of LED wall paks with emergency lighting capability.
Site Work: A new telephone/data raceway from an existing manhole to the facility with pull wire, 4’x8’ backboard with power outlet is included. Electric door locks for 2 personnel doors shall be provided.

Project Location: Louisville

More Details

CCK-2233-17 Jacobs Science Building Interior Landscape-2363.0

CCK-2233-17 Jacobs Science Building Interior Landscape-2363.0

PROJECT DESCRIPTION:
The project includes the removal of remaining native plants from interior planting beds of the Jacobs Science
Building. In order to replace the native plants with tropical species, the existing topsoil must be replaced with
potting soil. In order to do this, the rock mulch and existing irrigation drip tubing and foggers must be
displaced. The existing topsoil shalilhen be replaced to a depth of 12″ with potting soil. Tropical plants shall
then be provided and installed and the irrigation and rock mulch redistributed in the beds. The plants and
irrigation system must be maintained for a one-year period following final completion of the work.

Project Location: Lexington, Kentucky

More Details

City of Elizabethtown – Hardin County Judicial Center Renovation

City of Elizabethtown – Hardin County Judicial Center Renovation

City of Elizabethtown – Hardin County Judicial Center
Renovation

Project Location: Elizabethtown, Kentucky

More Details

RFB-244-17 Weigh Station I-64 West-Bound Mile Marker 147.8

RFB-244-17 Weigh Station I-64 West-Bound Mile Marker 147.8

Project Manager Name: Joseph
Sandman
Phone: (502) 782-0329
Email:Joseph.Sandman@ky.gov

Estimate:
$638,887.00
Estimated Length of Project:
150 (Substantial Completion) + 30 (Final Completion)

This Work includes demolition of the existing weigh station office building, curb island, static scale pit, and metal shed that houses a water cistern. The existing static scale will be salvaged to the owner. The Work includes a new 1,877 sf weigh station office building built on spread footings with C.M.U. stem wall. The new building will be slab on grade with wood frame walls, brick masonry veneer, wood trusses, asphalt shingle roof, aluminum storefront entrances and windows. The following functions will be included: Scale Monitoring Area, Customer Service Area, Break Area with kitchenette and metal lockers, Men’s, Women;s, and Public Restrooms (all accessible), Mechanical Room (HVAC, Communications, Electrical Load Centers, Custodial Sink), and six Offices. The HVAC system is a ducted, forced air heat pump with diffusers and returns mounted in the suspended ceiling. The Electrical system will consist of a new underground 300Amp, 120/240Volt, single phase service feeding a single electrical panel and will be designed per NEC. All service and building wiring shall be in conduit or underground PVC as noted on the plans. An electrical, dual compartment isoduct will be installed on the Scales Countertop to serve as a backsplash. All receptacles and switches will be ivory in color. Lights will be lay-in LED in the Office Area and LED down lights in the Work Room Areas. Occupancy sensors will control the lighting in the Private Office and Restrooms. There will be new LED pole lighting and LED flag lights for the site lighting. Two (2) three (3) inch underground conduits for telephone and communications will be provided to serve the building’s voice and communications needs. A central, wall mounted MDF shall be provided to house the data rack, phone rack, radio rack, and internet rack. A new public address system using new amplifier, microphone, and pole mounted site speakers will be provided. The work includes new concrete paving (10″) thick with rebar), new concrete curbs, walk, and parking area (including two van accessible spaces), and new striping in vehicular use areas. Please note, no mechanical, electrical, or plumbing work is to be installed above the 10’ drywall ceiling in the truss space attic.

Project Location: Rowan

More Details

Cumberland Falls Highway Water District – Line Replacement and Reinforcement Project

Cumberland Falls Highway Water District – Line Replacement and Reinforcement Project

This contract consists of installing approximately 2,825 L.F. of 6″, 32,545 L.F. of 4″, and 11,760 L.F. of 3″ PVC Water Line; reconnection and/or replacement of approximately 220 meters; approximately 33 new meter settings
and appurtenances.

The engineer’s estimate is $998,000.

Project Location: Corbin, Kentucky

More Details

RFB-243-17 Greenbo Lodge Exterior Repairs

RFB-243-17 Greenbo Lodge Exterior Repairs

Project Manager Name: Butch Hatcher
Phone: (502) 782-0322
Email:
Butch.Hatcher@ky.gov

Estimate:
$317,764.00
Estimated Length of Project:
150 (Substantial Completion) + 30 (Final Completion)

Greenbo Lodge is located at Greenbo Lake State Resort Park, 965 Lodge Road in Greenup, Kentucky. Work of the Base Bid includes
1. Miscellaneous carpentry repairs including temporary removal and replacement of screen fabric on guest room screen doors, soffit repairs, and stucco batten repairs.
2. Repair and replacement of exterior cement plaster (stucco), including paint finish.
3. New paint finish on all exterior surfaces currently finished with a field applied paint coating.
4. New manufactured aluminum dock cover including columns and downspout.
5. New vinyl coated chain link fencing with privacy slats.
Work of Bid Alternate One includes:
1. Repair and/or replacement of structural steel components associated with the three-story exterior stair located on the west end of the guest room wing. Existing steel members scheduled to remain shall be sandblasted to a near white finish and finished with new paint coatings.

Project Location: Greenup

More Details

RFB-242-17 Hager Hill HVAC Upgrade Big Sandy CTC

RFB-242-17 Hager Hill HVAC Upgrade Big Sandy CTC

Project Manager Name: David Marshall
Phone: (502) 782-0332
Email:
David.Marshall@ky.gov

Estimate:
$161,000.00
Estimated Length of Project:
92 (Substantial Completion) + 31 (Final Completion)

Project consists of an installation of new DDC system controls to existing VAV boxes. Selected VAV boxes will be disconnected from existing system and left abandoned above ceilings. In many places new ductwork branch connections will be connected to existing diffusers from the existing VAV box that is to remain. Ductwork will be modified to combine duct systems that were served by two air handlers so that one air handler will now serve both systems. New ceiling work in this area will be required. All remaining VAV boxes will be balanced by an Owner furnished balancing contractor.

Project Location: Johnson

More Details

Farmdale Water District – Master Meter & Bypass Meter Project

Farmdale Water District – Master Meter & Bypass Meter Project

The work to be bid upon is described as follows:
• Three (3) master meter, including vault, valves, piping and all appurtenances as shown on the
plans and specifications, complete in place.
• Approximately ten (10) bypass meter and appurtenances.
• Approximately six (6) cut in valves.

Project Location: Frankfort, Kentucky

More Details

CCK-2232-17 Miller Hall Foundation Wall Waterproofing

CCK-2232-17 Miller Hall Foundation Wall Waterproofing

PROJECT DESCRIPTION:
Miller Hall, constructed in 1898, has a rubble stone foundation. The rubble stone is allowing ground water
intrusion into the interior damaging plaster, drywall, flooring and other furnishings. The intent of this project
is to waterproof the exterior of the foundation wall and install a foundation drainage system. Interior
renovations are not included in this project.

Project Location: Lexington, Kentucky

More Details

Spencer County Fiscal Court – Delta Road Slide Repair

Spencer County Fiscal Court – Delta Road Slide Repair

PROJECT DESCRIPTION:
The scope of the work is for the repair of the slide on Delta Road along the Salt
River, near the mouth of Goose Creek.
• Remove sufficient material to complete stabilization of the right descending bank of the Salt River and subgrade of Delta Road.
• Fill to original roadway cross-section and finish with traffic bound base.
The work shall include restoration of the roadway. The location is Delta Road, approximately 3
miles south of KY 44 between Mt. Washington and Taylorsville.

Project Location: Taylorsville, Kentucky

More Details

Louisville Waterfront Park High Mast Lighting – IFB# 170102

Louisville Waterfront Park High Mast Lighting – IFB# 170102

Please Note: Addendum 01 has changed the Bid Date

PROJECT DESCRIPTION:
Louisville Metro Government is currently accepting bids for Louisville Waterfront Park High
Mast Lighting per the attached specifications. The selected firm will furnish all materials, labor
and equipment necessary to remove the existing metal halide fixtures on the high mast poles
located in Waterfront Park.

Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire.

Project Location: Louisville, Kentucky

More Details

CCK-2231-17 Memorial Coliseum Coach’s Locker Room Renovations

CCK-2231-17 Memorial Coliseum Coach’s Locker Room Renovations

PROJECT DESCRIPTION:
Scope of Work:
The Scope of Work for this Project is outlined below in summary. The total Scope of Work is outlined in the Contract Documents. The Contractor is responsible for noise control. The Contractor is responsible for relating instructions to all employees, Sub·Contractors and
suppliers on site and, if needed, providing a language translation employee as required. No tobacco products, alcohol, drugs, firearms or fraternizing with students are allowed on site. If
any the above is conducted, immediate dismissal from the Project will be enforced.

Project Description:
New Coach’s locker room and lounge in the existing Memorial Coliseum. Other areas of the
Coliseum will remain in operation throughout the construction period and must be interrupted by
new work. Careful scheduling and coordination with the User is required.

Demolition:
Removal of certain existing walls, floor slab, ceilings, and Mechanical / Electrical / Plumbing as required for new construction.

New Work includes but is not limited to:
New coach’s lounge and locker room including new toilet and steam shower area. Fit up
includes new floor slab, new flooring (carpet and ceramic tile), new gypsum board and CMU walls (some with Ceramic Tile), new ceilings (ACT, ceramic tile, and Gypsum Board), wood
trim, and casework. New Lockers are NIC however coordination with Owner provided locker
installation is required.

Project Location: Lexington, Kentucky

More Details

City of Georgetown – Hollyhock Storm Water Infrastructure Improvement Project

City of Georgetown – Hollyhock Storm Water Infrastructure Improvement Project

The City of Georgetown is seeking bids for the Hollyhock Storm Water
Infrastructure Improvement Project.

Project Location: Georgetown, Kentucky

More Details

McCreary Central High School – Outdoor Physical Education Facility Improvement

McCreary Central High School – Outdoor Physical Education Facility Improvement

PROJECT DESCRIPTION:
Work of the Project is defined by the Contract Documents and consists of the following:
1. Mill existing track 1-1/2” deep and new asphalt surface coat cover over existing asphalt
and work required to conform to NFHS track and field regulations for an 8-lane track
with 36” lanes with latex resilient surfacing
2. New asphalt surface coat over existing high jump facility with latex resilient surface
which conforms to NFHS standards and regulations.
3. Installation of Long/Triple Jump facilities with latex resilient surface which conforms to
NFHS Standards and Regulations.
4. Install of Pole Vault facility with latex resilient surface which conforms to NFHS
Standards and Regulations
5. Installation of Discus and Shot Put facilities which conforms to NFHS Standards and
Regulations
6. All concrete work associated with field event facilities
7. All demolition work required to facilitate new work.

Project Location: Stearns, Kentucky

More Details

Blue Grass Airport – Runway 4-22 & Taxiway A Markings

Blue Grass Airport – Runway 4-22 & Taxiway A Markings

PROJECT DESCRIPTION:
The project consists of repainting of the Runway 4-22 markings, including
thresholds, centerlines, touchdown markings, runway numbers, taxiway lead
lines, hold markings, runway safety area markings and taxiway Alpha centerline.

Project Location: Lexington, Kentucky

More Details

WKU – South Campus Parking Lot Drain

WKU – South Campus Parking Lot Drain

PROJECT DESCRIPTION:
Project to remove & replace drain pipe under parking lot at WKU’s
South Campus. Existing plastic pipe will be replaced with corrugated metal, approximately 314
linear feet. Project start date will be Monday, June 6, 2017 and work must be completed in 30
days.

Project Location: Bowling Green, Kentucky

More Details

RFB-240-17 Tom Hatfield Drainage AML

RFB-240-17 Tom Hatfield Drainage AML

Estimate:
$211,315.00
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

The proposed project (approximately 10 acres within the construction limit, of which a maximum of about 2.0 are assumed will actually be disturbed) consists of improving drainage from multiple open and collapsed portals which are contributing to flooding problems which impact several residences owned by the Hatfield family. The site is located in Ransom, KY on Hwy. 1056, at and around #16 Hillcrest Drive (37° 34’ 04”; 82° 11’ 08”. Traveling from the Pikeville area, it can be reached following Hwy. 119 to the intersection with Hwy. 319 near Hardy. Continue south on Hwy. 319 to a right onto HWY. 1056 and proceeding about one mile across a concrete bridge. The residences are on the left.
Multiple, collapsed or mostly collapsed and heavily draining portals, from two coal seams. Drainage from the upper coal seam portals will be collected into a subdrain. The water in the subdrain will be collected into HDPE pipe with subdrain collar, and drained into a junction box. Water will drain from the junction box into another pipe until it enters another modified subdrain that collects water from additional portal. Water from the subdrain and pipe will flow into a rectangular gabion ditch, and end at a gabion check from which the water enters into existing drainage. A catch basin, considered incidental to earthwork, is intended as necessary to reduce water velocity and sediment load, and a gabion weir will be constructed. Additional class II, class II, and cyclopean stone will be placed as necessary near and around the gabion ditch anchor and along drain to slow flow and prevent erosion.
In total, as many as ten (10) likely portals have been noted to exist within the construction limit, and are planned for closure with pipe.
Drainage issues at and around the Tom Hatfield residence will also be addressed by placing ECB Ditch and subdrain in an area near and behind an existing, abandoned trailer. The subdrain will surface and an additional length of ECB ditch is planned to channel the water behind the Tom Hatfield residence and into a length of HDPE pipe, with headwalls, under the drive. Additional ECB ditches are planned upslope along the drive to channel water into the ditch near the inlet and outlet of the pipe. ECB Ditch will continue at the outlet of the pipe until eventually reaching the stream. Class III will be placed around the outlet.Chain-link fence is included as may be necessary to access parts of the project area.
Waste material is intended to be placed onsite, as per the planview or within the project limits as directed by THE ENGINEER. Materials resulting from any tree cutting are not to be placed in the waste area, but are to be chipped on site or otherwise disposed of per the property owner’s wishes.
A sediment and erosion control program, consisting of such measures as hay bales, silt fences, and prompt re-vegetation will be implemented on all areas disturbed by this project.

Project Location: Pike

More Details

Harlan County High School – Greenhouse

Harlan County High School – Greenhouse

PROJECT DESCRIPTION:
At Harlan County High School in Baxter, Kentucky: Provide all labor and materials to
install a greenhouse, including concrete foundation/slab, packaged, prefabricated
greenhouse unit, plumbing, mechanical, electrical work and site grading and
improvements

Project Location: Baxter, Kentucky

More Details

Francis Water Company Inc – Contract 2 – KY 777 Water Storage Tank Project

Francis Water Company Inc – Contract 2 – KY 777 Water Storage Tank Project

PROJECT DESCRIPTION:
The Project consists of constructing
75,000 gallon ground storage tank, valve vault and appurtenances to complete project as laid out in
project plans and specifications.

Project Location: Allen, Kentucky

More Details

17-0525 PURCHASE OF CALIBRATION GASES

17-0525 PURCHASE OF CALIBRATION GASES

Sealed proposals will be received at the office of the Louisville and Jefferson County Metropolitan Sewer District until 2:00 PM, local time, May 25, 2017 for the following:
PURCHASE OF CALIBRATION GASES

Project Location: Louisville, Kentucky

More Details

Breathitt County Water District – KY 2436 Airport Road Waterline Extension

Breathitt County Water District – KY 2436 Airport Road Waterline Extension

PROJECT DESCRIPTION:
Work is to include in stallation of approximately 600 LF of 4-inch, 5,300 LF of 3-inch waterline, 150
LF of directionally drilled waterline and other appurtenances, Installation of a hyd ro pneumatic
station and bladder tank and enclosure, and 2 services.

Project Location: Jackson, Kentucky

More Details

Carroll County Memorial Hospital – New Outpatient Building

Carroll County Memorial Hospital – New Outpatient Building

Please Note: Addendum 02 has changed the Bid Date

PROJECT DESCRIPTION:
The nature, scope, and major
elements of the work – a 12,924 g.s.f. building addition to Carroll County Memorial Hospital
to house outpatient functions including a family practice clinic, a specialty clinic, rehab gym, and main lobby with central registration. Work includes associated architectural, mechanical,
electrical, plumbing, structural and site design. Site work Includes a new front and rear
parking lot.

Project Location: Carrollton, Kentucky

More Details

Knox County Detention Center

Knox County Detention Center

Please Note: Addendum 01 has changed the Bid Date

The following bids are requested :
2 ASPHALT PAVING
3 GENERAL TRADES
4 MASONRY
5 STRUCTURAL STEEL
6 ROOFING
7 ALUMINUM STOREFRONTS / WINDOWS
8 RESINOUS FLOORING
9 PAINTING
10 DETENTION EQUIPMENT
11 FOOD SERVICE EQUIPMENT
12 LAUNDRY EQUIPMENT
13 FIRE SUPPRESSION
14 MECHANICAL
15 ELECTRICAL
16 SECURITY ELECTRONICS
17 COMBINATION

Project Location: Barbourville, Kentucky

More Details

Lincoln County Schools – Waynesburg Elementary School – Bus Canopy & Sidewalk

Lincoln County Schools – Waynesburg Elementary School – Bus Canopy & Sidewalk

PROJECT DESCRIPTION:

Project consists of new freestanding bus canopy and adjacent sidewalk work.

1. Project cost range is anticipated to be under $27,000.00.

Construction Contract Bids will be received for the following Work:

1. General Contract (all trades).

Project Location: Stanford, Kentucky

More Details

Christian County Public Safety Facility

Christian County Public Safety Facility

The following bids are requested:
1 DEMOLITION
2 ASPHALT PAVING
3 GENTERAL TRADES
4 MASONRY
5 STRUCTURAL STEEL
6 ROOFING
7 FRAMING / DRYWALL / CEILINGS
8 ALUMINUM STOREFRONTS / CURTAIN WALLS / WINDOWS
9 CERAMIC TILE
10 FLOORING
11 PAINTING / COATINGS
12 HYDROLIC ELEVATOR
13 FIRE SUPPRESSION
14 PLUMBING / HVAC
15 ELECTRICAL
16 COMBINATION

Project Location: Hopkinsville, Kentucky