City of Lawrenceburg – Wild Turkey Sewer Extension
City of Lawrenceburg – Wild Turkey Sewer Extension
PROJECT DESCRIPTION:
The project consists of approximately 14,000 feet of 10″ PVC SDR 21 Force Main, 1 Lift
Station, 60 foot Railroad Bore for 24″ Gravity Sewer Line and appurtenances.
City of Centertown – Elevated Steel Water Storage Tower
City of Centertown – Elevated Steel Water Storage Tower
PROJECT DESCRIPTION The work to be bid is described as follows:
The primary scope of work includes the construction of a 150,000 gallon elevated water storage
tank, including mixing system.
City of Hopkinsville – Downtown & Inner-City Park Improvement Project – East 2nd Street Park
City of Hopkinsville – Downtown & Inner-City Park Improvement Project – East 2nd Street Park
PROJECT DESCRIPTION:
The project
will consist of a variety of elements including the removal of an existing tree; installation of a bathroom addition to the
existing facility; installation of playground; Installation, repair and/or replacement of sidewalks; installation of other park
amenities such as trash receptacles, grills and benches; installation of sheltered picnic area; installation of basketball court; and installation of landscaping.
City of Hawesville & Hancock County Fiscal Court – Windward Heights Water Line Replacement
City of Hawesville & Hancock County Fiscal Court – Windward Heights Water Line Replacement
PROJECT DESCRIPTION: The Project consists of constructing new water lines (approximately 6,900 LF of 6-inch water line, 2,600
LF of 4-inch water line & 350 LF of 1-inch water line) and necessary appurtenances.
LFUCG – Gainesway Kirklevington & Mount Tabor Park Improvements
LFUCG – Gainesway Kirklevington & Mount Tabor Park Improvements
Please Note: Addendum 2 has changed the Bid Date
PROJECT DESCRIPTION: Consisting of the construction and/or furnishing of items as listed for the Gainesway,
Kirklevington and Mount Tabor Park Improvements, Lexington-Fayette County, Kentucky.
LFUCG – MLK & Johnson Heights Parks Sports Field Construction
LFUCG – MLK & Johnson Heights Parks Sports Field Construction
PROJECT DESCRIPTION: Consisting of the construction and/or furnishing of items as listed for the MLK and
Johnson Heights Parks Sports Field Construction, Lexington-Fayette County, Kentucky.
PROJECT DESCRIPTION:
The project scope includes renovation of the existing locker rooms, ADA accessibility and addition of public restrooms at the front of the building. The work must be substantially complete within 8 months from notice to
proceed.
Bath County Schools – Bath County High School Addition & Renovation
Bath County Schools – Bath County High School Addition & Renovation
Please Note: Addendum 4 has rebid BP097 Painting ONLY
Contact the Project Manager, Troy Fraley, with questions at (859)498-4444.
PROJECT DESCRIPTION:
The project will consist of a classroom wing and performing arts additions, along with
minor renovations in designated areas of the existing facility.
Bids Requested:
BP 020 Site and Asphalt Paving
BP 025 Turf Field
BP 030 General Trades
BP 040 Masonry
BP 050 Metals
BP 075 Roofing, Flashing, & Roof Specialties
BP 084 Aluminum Storefront, Glass & Glazing
BP 090 Flooring
BP 095 Finishes (Drywall, Paint, Ceilings, Insulation)
BP 097 Painting New Bid Date is for this package ONLY
BP 127 Auditorium Seating
BP 130 Theater Equipment & Sound Panels
BP 210 Fire Protection
BP 230 Plumbing & HVAC
BP 260 Electrical
BP 265 Technology
BP 300 Combination (BP 090 & BP 095)
BP 310 Combination (BP 127 & BP 130)
City of Taylorsville – Storm Sewer Improvements Mill Street Drainage
City of Taylorsville – Storm Sewer Improvements Mill Street Drainage
PROJECT DESCRIPTION: The project includes but is not limited to the following:
Mill Street – Paving, Curb & Drainage Improvements
a.) 275 LF Curb & Gutter
b.) 5 EA Curb inlets & Catch Basins
c.) 120 LF 15″ ADS Storm Pipe
d.) 180 SY Asphalt Road Widening
BASE BID
The Project consists in general of the following: Install HVAC, ductless split system unit in each Data Room in the Main Hospital Building. Associated condensing units will be located on the roof. Install sidewall exhaust fans and ductwork in select rooms. Provide electric services in support of HVAC systems.
The Chemistry/Physics 3rd floor renovation will be a two phase project. The first phase relocates all current occupants from the 3rd floor of the Chemistry / Physics Building, and the second phase includes a complete renovation of the 3rd floor of the Chemistry / Physics Building for research.
Phase 1 includes minor renovations encompassing approximately 18,829 NSF to relocate current 3rd floor occupants by December 2018. The preliminary program includes but is not limited to
• +/- 30 offices to be relocated (6,384 NSF)
• Renovations to 220 and 222 to relocate Classroom 320 (2,077 NSF)
• 6 labs to relocate to existing vacated lab space (7,236 NSF)
• Relocate Instrument Room (143 NSF)
• Relocate Class Labs (2,989 NSF)
Phase 2 includes renovations to provide centralized state-of-the-art laboratories, accompanying offices and collaboration spaces on the 3rd floor of the Chemistry/Physics Building to support research. The preliminary program includes, but is not limited to the following:
• Research Labs for current and future research faculty
• Research Faculty and support Offices
• Write Up Areas
• Conference Rooms
• Lab Prep Areas
• Break Room
This project is a boiler replacement and an upgrade of the HVAC infrastructure for three building on the Department of Criminal Justice Training Campus – Funderburk Building, Schwendeman Building and finally the Thompson Building. In the Funderburk Building, the existing two electrical boilers are to be replaced with two new gas fired boilers with an upgrade of the primary loop and the addition of gas service to the building. In the Schwendeman and Thompson Building, the existing two gas fired boilers are to be demolished and replaced with two new non-condensing boilers for the heating loop and two new condensing boilers for the heat pump loop. For all three buildings, controls are to be upgraded.
PROJECT DESCRIPTION: The work to be performed consists of: Unit Renovations
Water Heater Replacement
HVAC Replacement
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned or
scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.
PROJECT DESCRIPTION:
The work to be performed consists of:
Site KY-72-002 Hyacinth Village
1. Closet door and hardware replacement.
Work includes providing all items, articles, materials, operations or methods herein listed, mentioned
or scheduled on the Project Documents and / or herein, including all labor, materials, equipment, services and
incidentals as necessary for their completion.
PROJECT DESCRIPTION:
Louisville Metro Government is currently accepting bids for Waverly Park Restroom per the
attached specifications.
Metro Parks and Recreation is requesting bids for construction of a new restroom at Waverly Park
located at 4800 Waverly Park Road, Louisville, Kentucky 40214. This project includes but is not limited
to: construction of a restroom, installation of an on-site septic system, connection to on-site utilities,
new concrete walkways, gravel walks, excavation, grading, trenching, erosion control and seeding.
Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire.
City of Hawesville – Wastewater Treatment Plant Expansion
City of Hawesville – Wastewater Treatment Plant Expansion
PROJECT DESCRIPTION:
The Project consists of constructing a new 300,000 gallon per day wastewater treatment plant with new
headworks system including screening and grit removal, new aeration/clarifier basin, new UV disinfection system, influent/effluent flow meter, piping, electrical and all related appurtenances.
Estimate:
$ 49,675.00 Estimated Length of Project:
(Substantial Completion) + 60 Calendar Days (Final Completion)
The proposed Michael Morrow Drainage & Shaft AMD Abatement Project, approximately 11.5
acres total, consists of excavate iron precipitates from a mine portal, cleaning out a roadside ditch, installation of a culvert, and backfilling a vertical shaft near Dekoven in Union County.
Remove precipitates that have collected in the roadside ditch and around the mine portal and bury them onsite. The ground around the portal is very saturated so use caution. Excavate a
sump near the portal to allow the metal precipitates to collect. Cleanout the roadside ditch and restore it to a trapezoidal shape with small rock checks. Install a culvert under the road and
armor the inlet with Class II/III rock and construct a check in the ditch below the culvert to ensure water turns into the culvert. Access the shaft along existing trails improving them as needed. Break the concrete collar and push into the shaft, backfill the shaft with Class II/III rock. The shaft is estimated to be 16’ diameter x 20’ depth, however the depth may vary when cleared and backfilled. Install a shaft monument over the finished shaft closure. Regrade all disturbed areas and use the AML general seed mixture. Use limestone sand for water treatment if any water is released, especially from excavation around the portal and shaft. Use of a pump(s) is incidental to site preparation. Construction disturbances will be kept to a minimum with a stringently formulated sediment and erosion control program. Prior to beginning any major earth disturbance (excluding initial site preparation for access only), all silt control measures will be installed. All disturbed areas will be promptly revegetated at the end of construction using lime, fertilizer, residential or wildlife seed, and mulch, as necessary. Standard measures will be used for dust control and work hours will occur during AML’s standard time frame of 7 am to 7 pm Monday-Friday with shorter hours
for “critical” work items. Access to the site is via county roads, residential driveways and yards, and an existing access road. This project will include pre- and/or post- project maintenance and repair of existing previously constructed public county roads utilized during the construction of this project, which are administered by the county or local road authority. This construction activity will be conducted under the authority and supervision of the local public road authority and will consist of standard road construction practices appropriate to mitigate impacts to the local community
from potential degraded road conditions in order to maintain public traffic safety.
Kentucky Center for African-American Heritage – Building Improvements – 180064
Kentucky Center for African-American Heritage – Building Improvements – 180064
PROJECT DESCRIPTION:
This project consist primarily of interior improvements such as acoustical treatments, finishes, audio system, lighting, HVAC & control modifications for a 1- story building “A” & Pavilion “P”.
Proposed use is for Public Gatherings and events such as meetings, dinners, receptions, art displays and ceremonies.
Louisville Metro Government uses Bonfire portal for accepting and evaluating proposals digitally (https://louisvilleky.bonfirehub.com/portal)
. Bidders must submit all pages of bid document through Bonfire. Sealed Proposals must be uploaded,
submitted, and finalized prior to the closing at 11/3/17 3:00pm. The bid document and drawings
are available on Bonfire and Lynn Imaging, all other forms, documents and attachments are available
on (https://louisvilleky.bonfirehub.com/portal).
CALL 100 CONTRACT ID 171245 ROCKCASTLE COUNTY NHPP IM 0752 (095) : I-75 (ROCKCASTLE COUNTY) (MP 60.100) TENNESSEE STATE LINE – LEXINGTON; WIDEN I-75 TO 6 LANES FROM 1.1 MILES N US 25 INTERCHANGE AT MT. VERNON N TO 1.85 MILES N GREEN HILL ROAD OVERPASS (MP 64.500), A DISTANCE OF 4.42 MILES. ASPHALT REHAB INTERSTATE/PARKWAY. SYP NO. 08-00006.20.
CALL 101 CONTRACT ID 171244 NELSON COUNTY STP 1501 (116) : BARDSTOWN – SPRINGFIELD ROAD (US 150) (MP 1.697) WIDEN US 150 INCLUDING BRIDGE RECONSTRUCTION BETWEEN THE INTERCHANGE RAMPS AT THE BLUEGRASS PARKWAY (MP 2.285), A DISTANCE OF 0.18 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 04-08309.11.