Author Archive

Housing Authority of Fulton – HVAC Upgrades

Housing Authority of Fulton – HVAC Upgrades

PROJECT DESCRIPTION:
The project consists of:
HVAC Upgrades

Project Location: Fulton, Kentucky

More Details

Louisville Metro Housing Authority – 1474 HVAC Replacement at Parkway Place Gymnasium

Louisville Metro Housing Authority – 1474 HVAC Replacement at Parkway Place Gymnasium

PROJECT DESCRIPTION:
HVAC REPLACEMENT AT PARKWAY PLACE GYMNASIUM
PROPOSAL #1474

Project Location: Louisville, Kentucky

More Details

Louisville Metro Housing Authority – 1476 Demolition of 538 Lampton St and 608 S 16th St

Louisville Metro Housing Authority – 1476 Demolition of 538 Lampton St and 608 S 16th St

PROJECT DESCRIPTION:
DEMOLITION OF 538 LAMPTON AND 608 S 16TH ST
PROPOSAL #1476

Project Location: Louisville, Kentucky

More Details

RFB-64-19 DMA – Benton Readiness Center Roof Replacement

RFB-64-19 DMA – Benton Readiness Center Roof Replacement

Project Manager Name: Dwayne Brown
Phone: (502) 782-0315
Email:
Dwayne.Brown@ky.gov


Estimate:
$334,834.00
Estimated Length of Project:
60 (Substantial Completion) + 30 (Final Completion)

The project consists of complete tear-off of existing gravel surface 4-ply built-up roof and installation of new SBS Bituminous Membrane Roof System including insulation.

Project Location: Benton

More Details

Russell County Industrial Development Authority – French Valley Business Park Build Ready Site Preparation Project

Russell County Industrial Development Authority – French Valley Business Park Build Ready Site Preparation Project

PROJECT DESCRIPTION:
Work includes earth work for a building pad, approximately 150,000 sq. ft. in size at the French
Valley Business Park.

Project Location: Jamestown, Kentucky

More Details

Breathitt County Board of Education – Sebastian Middle School Roof Edge Repair

Breathitt County Board of Education – Sebastian Middle School Roof Edge Repair

Please Note: Addendum 02 has extended the Bid Date

PROJECT DESCRIPTION:
Furnishing the specified labor, materials, supplies, tools, and or services, indicated for the:
Breathitt County – SMS Roof Edge Repair BG#18-409

Project Location: Jackson, Kentucky

More Details

RFB-63-19 DOC – NTC Foundation Repairs

RFB-63-19 DOC – NTC Foundation Repairs

Project Manager Name: Carl Kratzer
Phone: (502) 564-3155
Email: carl.kratzer@ky.gov


Estimate:
$ 81,260.00
Estimated Length of Project:
60 (Substantial Completion) + 10 (Final Completion)

The rear wall of the NTC Vocational School has experienced foundation settlement and will be repaired. The project involves foundation underpinning of the footings, then slab-jacking for the first floor slab on grade near the affected walls. The walls will be pinned to the slab to prevent any rotation. The cracks in the masonry walls and brick veneer will be repointed. The existing control joints will be properly caulked. The roof framing will be properly secured with metal connectors. A drain pipe will be installed beneath the sidewalk on the left side of the building. The earth on the left side of the building will be properly graded to effectively drain water away from the foundation.

Project Location: Burgin

More Details

CCK-2356-19 T.H. Morgan – Room 202 Renovation

CCK-2356-19 T.H. Morgan – Room 202 Renovation

PROJECT DESCRIPTION:
This project updates the laboratory in room 202. A new wall will be built to create a 1000 SF lab space. Inside this lab, three spaces will be constructed along the exterior wall. New
casework, lab equipment, and a new fume hood will be installed. New flooring will be
installed throughout. Updates to power, HVAC, lighting and electrical utilities are also
included in this project.

Project Location: Lexington, Kentucky

More Details

Mt. Sterling Water and Sewer System – Greenbrier Dam Slope Repair

Mt. Sterling Water and Sewer System – Greenbrier Dam Slope Repair

PROJECT DESCRIPTION:
Repair of the Greenbrier dam, located at 6048 McCormick Road Mt. Sterling, Kentucky, damaged as a result of soil movement. Estimates are that approximately 11,500 square feet of slope have been impacted requiring soil and slope remediation. The intended approach to this repair is to utilize ARMORMAX, a proprietary system developed by Propex.

Project Location: Mt Sterling, Kentucky

More Details

Harlan County Fiscal Court – Benham Schoolhouse Inn – Roof Replacement

Harlan County Fiscal Court – Benham Schoolhouse Inn – Roof Replacement

Please Note: Addendum 01 has changed the Bid Date

PROJECT DESCRIPTION:
Furnish all
necessary labor, materials, tools, machinery, warranties, and all other items required to replace
existing asphalt shingle roof, metal flashing and downspouts.

Project Location: Benham, Kentucky

More Details

RFB-61-19 DMA – London Readiness Center Renovation

RFB-61-19 DMA – London Readiness Center Renovation

Project Manager Name: Joseph Sandman
Phone: (502) 782-0329
Email:Joseph.Sandman@ky.gov


Estimate:
$860,935.00
Estimated Length of Project:
300 (Substantial Completion) + 30 (Final Completion)

Replace aging Mechanical Systems of the London Readiness Center in London, Kentucky, along with a full lighting, ceiling grid and pad replacement, a renovation of the restroom facilities, and a renovation to include a Nursing Room to comply with UFC 4-171-05. Demo existing restroom facilities and associated MEP systems, and replace with new fixtures and systems as indicated in the contract documents.

Project Location: London

More Details

RFB-60-19 DMA – USPFO Warehouse Floor Resurfacing

RFB-60-19 DMA – USPFO Warehouse Floor Resurfacing

Project Manager Name: Bernard Engelman
Phone: (502) 782-0319
Email:
Bernard.Engelman@ky.gov


Estimate:
$523,589.00
Estimated Length of Project:
45 (Substantial Completion) + 15 (Final Completion)

The goal of this project is to provide a resinous floor in the warehouse areas of the USPFO Building at the Boone National Guard Center. Additional scope of work includes the removal of empty shelving prior to prep and installation of the floor. After installation of the floor new shelving will be reinstalled by the contractor. Walls in the open area of the warehouse shall receive wall paint and dryfall ceiling paint.

Project Location: Frankfort

More Details

RFB-57-19 KCTCS – OCTC Manufacturing Labs Renovation and Equipment

RFB-57-19 KCTCS – OCTC Manufacturing Labs Renovation and Equipment

Project Manager Name: Dwayne Brown
Phone: (502) 782-0315
Email:
Dwayne.Brown@ky.gov


Estimate:
$316,675.00
Estimated Length of Project:
80 (Substantial Completion) + 14 (Final Completion)

The project consists of interior renovations to multiple rooms, with a total of 10,050 sf. The renovations are for improvements to install new equipment for student training. Work includes new lay-in ceilings, carpet, painting, rework of electrical for new equipment, conduit pathways for network cable, replacement of compressed air system, and HVAC improvements.

Project Location: Owensboro

More Details

RFB-55-19 FSS – HVAC Replacement CHR Building

RFB-55-19 FSS – HVAC Replacement CHR Building

Project Manager Name: David Marshall
Phone: (502) 782-0332
Email:
David.Marshall@ky.gov


Estimate:
$3,167,600.00
Estimated Length of Project:
330 (Substantial Completion) + 30 (Final Completion)

The scope of this project is to repair, upgrade and modernize the heating, cooling and ventilation systems at the Cabinet for Human Resources building in Frankfort. The overall system design shall remain intact with sub-assembly replacements such as coils, valves, piping, fans and drives. All air terminal units throughout the building shall be replaced. This project will include various mechanical replacements, electrical upgrades as well as associated controls upgrades and programming. The controls system shall be totally renovated and move to a system that is entirely electronic without the need of any type of pneumatic or electric to pneumatic conversion.

Project Location: Frankfort

More Details

Mount Sterling – Montgomery County – New Swimming Pool Complex

Mount Sterling – Montgomery County – New Swimming Pool Complex

Please Note: Addendum 01 has changed the Bid Date and Location

PROJECT DESCRIPTION:
Packs + Walker, The Construction Management Company, will be soliciting bids for numerous
different trades for the construction work associated with the new pool project.

Project Location: Mt Sterling, Kentucky

More Details

RFB-62-19 DMA – EOC Pond Aquatic Awareness Project

RFB-62-19 DMA – EOC Pond Aquatic Awareness Project

Project Manager Name: Josh Morgan
Phone: (502) 564-3155
Email: josh.morgan@ky.gov


Estimate: $380,853.00
Estimated Length of Project: 90 (Substantial Completion) + 15 (Final Completion)

The project is for improvements around an existing pond. Project scope includes some
limited demolition, tree protection, as well as clearing of existing landscape material.
New construction includes crushed stone trails, boardwalk / deck overlook, limited site
signage, installation of new pond fountain, new native stone edging around the
perimeter of the pond, installation of new landscape plantings including trees, shrubs,
perennials and plugs to naturalize the pond perimeter.

Project Location: Frankfort

More Details

8004 Sandness Court Drainage Improvement Project

8004 Sandness Court Drainage Improvement Project

Description and location of Project: This unit base construction order is for the pipe, and paved ditch along the open space behind Sandness Court, in Metro Council District 19.

Project Location: Louisville, Kentucky

More Details

RFB-46-19 DMA – WHFRTC Range Operations Center

RFB-46-19 DMA – WHFRTC Range Operations Center

Project Manager Name: Dwayne Brown
Phone: (502) 782-0315
Email:
Dwayne.Brown@ky.gov


Estimate:
$1,173,800.00
Estimated Length of Project:
200 (Substantial Completion) + 30 (Final Completion)

The project is an addition to the existing Range Operations Center at the Wendell H. Ford Regional Training Center in Greenville, KY. The addition is 3,950 square feet in size. The structural system consists of poured in place concrete shallow foundations and stem walls and concrete slab on grade. Exterior walls are insulated concrete forms with cast in place concrete. Exterior wall finishes are a combination of pre-finished metal panels and anchored stone veneer. Roof structure is cold formed metal framing and trusses with steel deck, roof will be pre-finished metal roof panels over rigid insulation board with a nailable surface. Interior layout consists of a reception/customer service area, offices, meeting room, break room, storage, mechanical and toilets. Interior partitions will be light gauge steel framing with gypsum board surfaces and sound batt insulation. Floor finish will be sealed, colored concrete. Doors and frames will be hollow metal, windows are aluminum and ceilings are suspended acoustic panels. There will be minor demolition and patching of the existing facility walls to provide connections to the addition. Site work consists of grading, storm water structures and pipe, sidewalks and a flagpole. Water service shall connect to existing main at street, sanitary will gravity flow to existing sanitary main adjacent to building, and natural gas piping will be extended from existing natural gas utility meter. The building will utilize natural gas for heat. HVAC will consist of furnaces and condensing units, and ceiling cassettes with outdoor condensing unit. Electrical work includes modifications to existing 208V/3 phase service and a new 208V/120V panel for the power distribution system. Interior and exterior lighting will be LED. Communications systems will include telephone and data wiring and devices. A natural gas emergency generator will be installed.

Project Location: Greenville

More Details

RFB-53-19 KCTCS – ECTC Campus Signage Improvements

RFB-53-19 KCTCS – ECTC Campus Signage Improvements

Project Manager Name: Josh Morgan
Phone: (502) 564-3155
Email: josh.morgan@ky.gov


Estimate:
$255,000.00
Estimated Length of Project:
120 (Substantial Completion) + 15 (Final Completion)

The Elizabethtown Community & Technical College seeks improvements to their existing campus signage and wayfinding. Replacement of existing entrance signage and installation of new/additional signage with updated college logos will appropriately designate each entrance on to campus. New directional signage will be installed to help with vehicular navigations around the campus. New building identification signage will also be added to clearly delineate each building on campus. Additionally, new pedestrian way finding kiosks with campus maps will be strategically located around the site to help new and potential students and visitors navigate the campus.

Project Location: Elizabethtown

More Details

8700 Hudson Lane Drainage Improvement Project

8700 Hudson Lane Drainage Improvement Project

Description and location of Project: This unit base construction order is for the 48-inch pipe and drain system along the front of 8700 Hudson Lane, in Metro Council District 22.

Project Location: Louisville, Kentucky

More Details

Laurel Ridge Road Drainage Improvement Project

Laurel Ridge Road Drainage Improvement Project

Description and location of Project: This unit base construction order is for the drainage improvement project along Laurel Ridge Road which includes 10-inch driveway pipe, and 1′ paved ditch installation, in Metro Council Distract 24.

Project Location: Louisville, Kentucky

More Details

Blue Horse Ave. Drainage Improvement Project

Blue Horse Ave. Drainage Improvement Project

Description and location of Project: This unit based construction order is for the pipe and drain installation along Blue Horse Ave in Metro Council District 9.

Project Location: Louisville, Kentucky

More Details

RFB-50-19 KCTCS – JCTC Advanced Manufacturing Center Phase2

RFB-50-19 KCTCS – JCTC Advanced Manufacturing Center Phase2

Project Manager Name: Anne Saint-Aignan
Phone: (502) 782-0337
Email:anne.saintaignan@ky.gov


Estimate:
$13,787,500.00
Estimated Length of Project:
510 (Substantial Completion) + 30 (Final Completion)

A. The Work of the Project is defined by the Contract Documents and consists of, but not limited to, the following Phase 2 AMIT site clearing and new construction work:
1. Demolition of existing 746 South First Street, JCTC office/storage building concrete first floor slab, loading dock, partial basement, foundations and footings.
2. Demolition of existing billboard foundations adjacent to the 746 South First Street structure complete.
3. Site clearing including but not limited to asphalt parking lots and drives, concrete parking lots and drives, public sidewalks and curbs, existing foundations, overhead utilities and other Work indicated in the Contract Documents.
4. Construction of new JCTC, AMIT facility.
5. A Property Management Plan by Linebach Funkhouser have been included in the specifications. Based on the depth of excavation and demolition it is not anticipated that any contaminated soils will be encountered but provisions are attached in the event contaminated soils are exposed during demolition of structures and/or excavation of test trenches.
6. Phase 2 AMIT General Contractor to assume possession and responsibility for upkeep of construction fencing that was originally installed by the Phase 1 Demolition Contractor. Traffic control devices currently installed are the responsibility of the Phase 1.5 Traffic Control Contractor for the duration of the Phase 2 AMIT construction.

Project Location: Louisville

More Details

CCK-2354-19 BP6 Pav HA Emergency Power – 2402.3

CCK-2354-19 BP6 Pav HA Emergency Power – 2402.3

Please Note: Addendum 03 has changed the Bid Date

PROJECT DESCRIPTION:
Contractor to furnish and install a complete electrical system that will provide 300 emergency
power panel in room HA619 on the 6th Floor of Pavilion HA in Chandler Medical Center. The
panel will be fed from the first floor room HA0199.

Project Location: Lexington, Kentucky

More Details

Mason County Board of Education – Straub Elementary School and Athletic Building Roof Replacement

Mason County Board of Education – Straub Elementary School and Athletic Building Roof Replacement

PROJECT DESCRIPTION:
Straub Elementary School and
Athletic Building Roof Replacement

Project Location: Maysville, Kentucky

More Details

Subscribe